ML050810591
| ML050810591 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 03/12/2005 |
| From: | Richard Anderson FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, PY-CEI/NRR-2868L | |
| Download: ML050810591 (3) | |
Text
FENOC FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant 10 Center Road Perry, Ohio 44081 Richard Anderson 440-280-5579 Vice President-Nuclear fax: 440-280-8029 March 12, 2005 PY-CEI/NRR-2868L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the February 2005 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector Lj
By
'a OPERATING DATA REPORT UNIT:
Perry DATE:
317/05
- 1.
Docket: 50-440
- 2.
Unit Name:
Perry Nuclear Power Plant
- 3.
Reporting Period February 2005
- 4.
Utility
Contact:
T. Phelps
- 5.
Telephone: 440-280-7660
- 6.
Design Electrical Rating (Net MWe):
- 7.
Maximum Dependable Capacity (Net MWe):
1260 1235
- 8.
Hours Reactor was Critical
- 9.
Hours Generator On-Line
- 10.
Unit Reserve Shutdown Hours
- 11.
Net Electrical Energy (MWeH)
This Month 504.9 503.0 0.0 549.0n47 0 Yr-to-Date 653.2 624.4 0.0 670.63 Cumulative 121.322.6 118.515.5 0.0 1
z n')n nwn n
....... I....-....
-1 ouuLeou Page 1
al UNIT SHUTDOWNS REPORT MONTH - FEBRUARY 2005 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 03/07/05 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.
Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1
Hours 2
3 05-01 1/6/05 F
1.0 A
4 On 1/6/05 at 0112 a manual scram was inserted due to the downshift of the Reactor Recirculation Pumps, along with the subsequent tripping offline of the Reactor Recirculation Pump A. Plant synchronized to the grid on 2/1/05 @0059.
05-02 2/22/05 S
168.0 C
1 The plant entered refuel outage #10 on February 22, 2005 @0001.
SUMMARY
- The Perry Nuclear Power synchronized to the grid at 0059 on February 1, 2005 from the forced outage In January. The plant commenced refuel outage #10 and finished the month shutdown performing refuel outage activities.
- 1. TYPE:
F: Forced S: Scheduled
- 2. REASON:
A - Equipment Failure (explain)
B - Maintenance or Test C - Refueling D - Regulafory E - Operating Training &
Ucense Examination F -Administrative G - Operational Error (explain)
H -Other (explain)
- 3. METHOD:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2