ML050810434
| ML050810434 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/11/2005 |
| From: | Jones T Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, L-2005-061 | |
| Download: ML050810434 (3) | |
Text
.- we e
FPL MAR 1 1 2005 L-2005-061 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - February 2005 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the February 2005 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.
Very truly yours, Terry 0. Jones Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.
an FPL Group company
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-250 Turkey Point Unit 3 3/7/2005 Ronald Everett (305) 246-6190 Reporting Period February, 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693
- -;: ;. is Month Year-to-date Cumulative No. of hours reactor was critical 672 1323 210936.7 No. of hours generator was on line (service hours) 672 1255.4 208331.2 Unit reserve shutdown hours 0
0 121.8 Net Electrical Energy (MWH) 478568 857289 136395954 I
.1.
UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/Ucense Examination F -Administrative G -Operational Error (Explain)
H -Other 1 - Manual 2 - Manual Trip/Scram 3 -Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
Summary Of Monthly Operating Experience Unit 3 had been operating at approximately 60% power from January 28", 2005 in order to clean grass from the condenser water boxes and tubes. On February 2, 2005, Unit 3 was restored to 100% power and continued to operate at essentially 100% power through the end of February.
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-251 Turkey Point Unit 4 317/2005 Ronald Everett (305) 246-6190 Reporting Period February, 2005 Design Electrical Rating (MWe-Net) 720 l
_-^_
Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 672 1416 209557.2 No. of hours generator was on line (service hours) 672 1416 205057.3 Unit reserve shutdown hours 0
0 577.2 Net Electrical Energy (MWH) 482324 1017036 135617787 UNIT SHUTDOWNS No.
Date Type Duration Reason Method of Corrective Action! Comments F=Forced (hours)
(1)
Shutting S=Scheduled Down (2)
(1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/1-cense Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2-Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of February.