February 2005 Monthly Operating Report for Millstone Power Station Units 2 and 3
ML050800379
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/09/2005
From: Sarver S
Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
05-142
Download: ML050800379 (8)


Text

Dominion-Dominion Nuclear Connecticut, Inc.

Millstone Power Station Rope Ferry Road Waterford, CT 06385 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Seric MPS

Docl, W

9 20 al No.05-142

, Lic/BAK RD

,et Nos.

50-336 50-423 ise Nos.

DPR-65 NPF-49 Licer DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNITS 2 AND 3 FEBRUARY 2005 MONTHLY OPERATING REPORTS In accordance with the reporting requirements of Technical Specification 6.9.1.7 for the Millstone Power Station Unit 2 (MPS2), and Technical Specification 6.9.1.5 for the Millstone Power Station Unit 3 (MPS3), attached are the Monthly Operating Reports for the month of February 2005. contains the MPS2 Monthly Operating Report and Attachment 2 contains the MPS3 Monthly Operating Report.

If you have any questions or require additional information, Mr. David W. Dodson at (860) 447-1791, extension 2346.

please contact Very truly yours, 5.. P. saowek 3)91DS-Stephen P. Sarver, Director Nuclear Station Operations and Maintenance

, --.' D q-

'

Serial No.05-142 February 2005 Monthly Operating Report Page 2 of 2 Attachments:

2 Commitments made in this letter: None.

cc:

U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Mr. V. Nerses Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8C2 Rockville, MD 20852-2738 Mr. G. F. Wunder Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 08-B-1 A Rockville, MD 20852-2738 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station February 2005 Monthly Operating Report for Millstone Power Station Unit 2 (MPS2)

Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC)

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-336 Millstone 2 03/08/2005 S. Claffev (860) 447-1791 2456 OPERATING STATUS

1. Unit Name:

Millstone Unit No. 2

2.

Reporting Period:

February 2005

3. Licensed Thermal Power (MWt):

2700.0

4.

Design Electrical Rating (Net MWe):

883.5

5. Maximum Dependable Capacity (Net MWe):

877.7

6.

If Changes Occur in Capacity Ratings (Items Number 3 through 5)

N/A Since Last Report, Give Reasons:

This Month Year-to-Date Cumulative

7.

Number of Hours Reactor Was Critical 672.0 1416.0 168150.8

8.

Hours Generator On-Line 672.0 1416.0 162329.7

9. Unit Reserve Shutdown Hours 0.0 0.0 468.2
10.

Net Electrical Energy Generated (MWH) 595138.2 1253976.2 133727588.9

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-336 Millstone 2 03/08/2005 S. Claffey (860) 447-1791 2456 REPORTING MONTH: FEBRUARY 2005 NO.

DATE TYPE' DURATION REASON 2 METHOD OF SIIHUTING CAUSE / CORRECTIVE ACTIONS (HOURS)

DOWN REACTOR 3 COMMENTS N/A There was no unit shutdown in February 2005.

2 3

F.:

Forced Reason:

Method:

S:

Scheduled A - Equipment Failure (Explain)

I - Manual B - Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip D - Regulatory Restriction 4 - Continued from previous month E - Operator Training / License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

February 2005 Monthly Operating Report for Millstone Power Station Unit 3 (MPS3)

Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC)

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-423 Millstone 3 03/04/05 K. Cook (860) 447-1791 6572 OPERATING STATUS

1.

Unit Name:

Millstone Unit No. 3

2. Reporting Period:

February 2005

3. Licensed Thermal Power (MWt):

3411.0

4.

Design Electrical Rating (Net MWe):

1156.5

5. Maximum Dependable Capacity (Net MWe):

1148.0

6. If Changes Occur in Capacity Ratings (Items Number 3 through 5)

N/A Since Last Report, Give Reasons:

This Month Year-to-Date Cumulative

7.

Number of Hours Reactor Was Critical 672.0 1416.0 120501.6

8.

Hours Generator On-Line 672.0 1416.0 118696.7

9.

Unit Reserve Shutdown Hours 0.0 0.0 0.0

10.

Net Electrical Energy Generated (MWH) 779593.9 1642422.5 130473324.4

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-423 Millstone 3 03/04/05 K. Cook (860) 447-1791 6572 REPORTING MONTH: FEBRUARY 2005 NO.

DATE TYPE DURATION REASON'2 METIHOD OF SHUTTING CAUSE / CORRECTIVE ACTIONS (IhOURS)

DOWN REACTOR 3 COMMENTS There was no unit shutdown in February 2005 2

l F:

Forced Reason:

Method:

S:

Scheduled A - Equipment Failure (Explain)

I - Manual B - Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip D -Regulatory Restriction 4 -Continued from previous month E -Operator Training / License Examination 5 - Other (Explain)

F-Administrative G - Operational Error (Explain) lH -Other (Explain)