ML050800379
| ML050800379 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 03/09/2005 |
| From: | Sarver S Dominion Nuclear Connecticut |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 05-142 | |
| Download: ML050800379 (8) | |
Text
Dominion-Dominion Nuclear Connecticut, Inc.
Millstone Power Station Rope Ferry Road Waterford, CT 06385 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Seric MPS
- Docl, W
9 20 al No.05-142
, Lic/BAK RD
,et Nos.
50-336 50-423 ise Nos.
DPR-65 NPF-49 Licer DOMINION NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION UNITS 2 AND 3 FEBRUARY 2005 MONTHLY OPERATING REPORTS In accordance with the reporting requirements of Technical Specification 6.9.1.7 for the Millstone Power Station Unit 2 (MPS2), and Technical Specification 6.9.1.5 for the Millstone Power Station Unit 3 (MPS3), attached are the Monthly Operating Reports for the month of February 2005. contains the MPS2 Monthly Operating Report and Attachment 2 contains the MPS3 Monthly Operating Report.
If you have any questions or require additional information, Mr. David W. Dodson at (860) 447-1791, extension 2346.
please contact Very truly yours, 5.. P. saowek 3)91DS-Stephen P. Sarver, Director Nuclear Station Operations and Maintenance
, --.' D q-
'
Serial No.05-142 February 2005 Monthly Operating Report Page 2 of 2 Attachments:
2 Commitments made in this letter: None.
cc:
U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Mr. V. Nerses Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8C2 Rockville, MD 20852-2738 Mr. G. F. Wunder Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 08-B-1 A Rockville, MD 20852-2738 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station February 2005 Monthly Operating Report for Millstone Power Station Unit 2 (MPS2)
Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC)
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-336 Millstone 2 03/08/2005 S. Claffev (860) 447-1791 2456 OPERATING STATUS
- 1. Unit Name:
Millstone Unit No. 2
- 2.
Reporting Period:
February 2005
- 3. Licensed Thermal Power (MWt):
2700.0
- 4.
Design Electrical Rating (Net MWe):
883.5
- 5. Maximum Dependable Capacity (Net MWe):
877.7
- 6.
If Changes Occur in Capacity Ratings (Items Number 3 through 5)
N/A Since Last Report, Give Reasons:
This Month Year-to-Date Cumulative
- 7.
Number of Hours Reactor Was Critical 672.0 1416.0 168150.8
- 8.
Hours Generator On-Line 672.0 1416.0 162329.7
- 9. Unit Reserve Shutdown Hours 0.0 0.0 468.2
- 10.
Net Electrical Energy Generated (MWH) 595138.2 1253976.2 133727588.9
UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-336 Millstone 2 03/08/2005 S. Claffey (860) 447-1791 2456 REPORTING MONTH: FEBRUARY 2005 NO.
DATE TYPE' DURATION REASON 2 METHOD OF SIIHUTING CAUSE / CORRECTIVE ACTIONS (HOURS)
DOWN REACTOR 3 COMMENTS N/A There was no unit shutdown in February 2005.
2 3
F.:
Forced Reason:
Method:
S:
Scheduled A - Equipment Failure (Explain)
I - Manual B - Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip D - Regulatory Restriction 4 - Continued from previous month E - Operator Training / License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
February 2005 Monthly Operating Report for Millstone Power Station Unit 3 (MPS3)
Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC)
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-423 Millstone 3 03/04/05 K. Cook (860) 447-1791 6572 OPERATING STATUS
- 1.
Unit Name:
Millstone Unit No. 3
- 2. Reporting Period:
February 2005
- 3. Licensed Thermal Power (MWt):
3411.0
- 4.
Design Electrical Rating (Net MWe):
1156.5
- 5. Maximum Dependable Capacity (Net MWe):
1148.0
- 6. If Changes Occur in Capacity Ratings (Items Number 3 through 5)
N/A Since Last Report, Give Reasons:
This Month Year-to-Date Cumulative
- 7.
Number of Hours Reactor Was Critical 672.0 1416.0 120501.6
- 8.
Hours Generator On-Line 672.0 1416.0 118696.7
- 9.
Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 10.
Net Electrical Energy Generated (MWH) 779593.9 1642422.5 130473324.4
UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-423 Millstone 3 03/04/05 K. Cook (860) 447-1791 6572 REPORTING MONTH: FEBRUARY 2005 NO.
DATE TYPE DURATION REASON'2 METIHOD OF SHUTTING CAUSE / CORRECTIVE ACTIONS (IhOURS)
DOWN REACTOR 3 COMMENTS There was no unit shutdown in February 2005 2
l F:
Forced Reason:
Method:
S:
Scheduled A - Equipment Failure (Explain)
I - Manual B - Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip D -Regulatory Restriction 4 -Continued from previous month E -Operator Training / License Examination 5 - Other (Explain)
F-Administrative G - Operational Error (Explain) lH -Other (Explain)