(TMI Unit 1), 30th Year Reactor Building Tendon Surveillance (Period 8)
ML050760504
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/15/2005
From: West R
AmerGen Energy Co, Exelon Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
5928-05-20081
Download: ML050760504 (1)


Text

AmerGen, AmerGen Energy Company, LLC Telephone: 717-948-8000 An Exelon Company Three Mile Island Unit Route 441 South, P.O. Box 480 Middletown, PA 17057 5928-05-20081 March 15, 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 THREE MILE ISLAND, UNIT I (TMI UNIT 1)

OPERATING LICENSE NO. DPR-50 DOCKET NO. 50-289

SUBJECT:

30Qh YEAR REACTOR BUILDING TENDON SURVEILLANCE (PERIOD 8)

In accordance with TMI Unit 1 Technical Specifications (TS) 4.4.2.1.6.a, enclosed is Topical Report No. 183, Revision 0, "3 0 th Year Tendon Surveillance (Period 8)." The report includes the ISI Summary Report per IWA-6000, and the three-volume contractor (Precision Surveillance Corporation) report entitled,.a301h Year Surveillance of the Post-Tensioning System at the Three Mile Island Unit 1 Containment Building."

Our evaluation of the results from tests and inspections conducted 30 years after the initial Structural Integrity Test (SIT) demonstrate that the TMI Unit I Reactor Building post tensioning system is in good condition and capable of performing its intended function during all design basis events. The functional capability of the system remains within design limits and no abnormal relaxation of prestressing forces in the tendons has occurred.

ncerely, Russell G. West Vice President, TMI Unit 1 RGW/awm Enclosure Cc:

Administrator, NRC Region 1 TMI Senior NRC Resident Inspector TMI-1 Senior NRC Project Manager File No. 05026 I~O