ES-301 Administrative Topics Outline Form ES-301-1 Seabrook Station Examination Level (circle one): SRO Administrative Topic (see Note)

Conduct of Operations Conduct of Operations Equipment Control Radiation Control Emergency Plan Type Code*

M/S+

N/S+

N/S+

N/S+

N/S Date of Examination: 1/31/05 Operating Test Number:

Describe activity to be performed (LO1 05J) Apply Technical Specifications and determine allowed outage time and mode restrictions.

(LOIT05) Evaluate the outcome of a Shutdown Margin Calculation (SDM) and determine impact on plant operations.

(LOIT06) Technical Specification Determination and identify required notifications of on-site and off-site personnel for an off-normal event.

(LOIT07) Review and authorize release of liquid waste.

(LOIT08) Post Scenario EAL Determination and Event Classification NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Types Codes & Criteria:

(C)ontrol Room (D)irect from bank (I 3 for ROs; s 4 for SROs & RO retakes)

(N)ew or (M)odified from bank (2 1)

(P)revious 2 exams; (I 1; randomly selected)

(S)imulator +(may also be performed in classroom setting)

ES-301 Administrative

~~~

Topics

__ Outline Form ES-301-1

~

~~

~

Seabrook Station Examination Level (circle one): RO Date of Examination: 1/31/05 Operating Test Number:

Administrative Topic (see Note)

Conduct of Operations Conduct of Operations Equipment Control Radiation Control Emergency Plan TY Pe Code*

MIS+

MIS+

PIMIS N/S+

Describe activity to be performed (L0027J) Perform a manual (QPTR) Calculation (L0043J) Perform a Shutdown Margin Calculation (SDM) (Mode 1)

(L00021) Perform AC Power Source Weekly Surveil lance (LOIT04) Initiate a Liquid Effluent Sample Request.

NIA NIA VOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

Types Codes & Criteria:

(C)ontrol Room (D)irect from bank (I 3 for ROs; 5 4 for SROs & RO retakes)

(N)ew or (M)odified from bank (2 1)

(P)revious 2 exams; (2 1; randomly selected)

(S)imulator +(may also be performed in classroom setting)

ES-301 Control Roomhn-Plant Svstems Outline Form ES-301-2 System / JPM Title Seabrook Station I Examination Level (circle one): RO Type Code*

Safety Function Date of Examination: 01/31/05 Operating Test Number:

a. 001
b. 006 LOITO1, Inadvertent Rod Withdrawal during Reactor S/D LO131 J, Transfer to Hot Leg Injection
c. 010 L0024J, Post LOCA PORV Operation L0059J, Post Trip Primary Plant Stabilization L0058J, Transfer Service Water to the Cooling Tower
d. 002
e. 076
f. 028 LOO84J, Start Hydrogen Recombiner
g. 029 LOIT02, Containment On-Line Purge System Lineup
h. 068 LOIT03, Respond to Liquid Radwaste High Radiation N/S/UA 1

M/S/A 2

D/S 3

D/S 4

P/D/S 4

P/D/S 5

N/S 8

N/S 9

i. 063 L0022J, DC Load Shedding During ECA-0.0
j. 01 2 L0008J, Local Reactor Trip During ATWS
k. 008 L0055J, Makeup to CC Head Tank During System Leak (C)ontrol Room (D)irect from bank (E)mergency or abnormal in-plant (L)ow power (N)ew or (M)odified from bank including 1 (A)

(P)revious 2 exams

( W A (S)imulator D/E 6

D/E/A 7

D/E/R/A 8

Criteria for RO / SRO-I / SRO-U 4-6 14-6 12-3 19/18/14 2 1 / 2 1 121 2 1 121 121 2 2 / 2 2 / 2 1 I 3 / I 3 / I 2 (randomly selected) 2 1 / 2 1 / 2 1

ES-301 Control Roomlln-Plant Systems Outline Form ES-301-2 Seabrook Station Examination Level (circle one): SRO(I)

Date of Examination: 01/31/05 Operating Test Number:

Control Room Systems @ (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U)

System / JPM Title Type Code*

Safety Function

a. 001 LOlTOl, Inadvertent Rod Withdrawal during Reactor S/D N/S/L/A 1
b. 006 LO131 J, Transfer to Hot Leg Injection M/S/A 2
c. 010 L0024J, Post LOCA PORV Operation D/S 3
d. 002 L0059J, Post Trip Primary Plant Stabilization D/S 4
e. N/A for SRO Candidates P/D/S 4
f. 028 L0084J, Start Hydrogen Recombiner P/D/S 5

In-Plant Systems @ (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)

h. 063 L0022J, DC Load Shedding During ECA-0.0 D/E 6
i. 012 L0008J, Local Reactor Trip During ATWS D/E/A 7

I I

j.

008 L0055J, Makeup to CC Head Tank During System Leak 1

D/E/R/A I

8

@ All control room (and in-plant) systems must be different and serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

(A) It e r na t e Path (C)ontrol Room (D)irect from bank (E)mergency or abnormal in-plant (L)ow power (N)ew or (M)odified from bank including 1 (A)

(P)revious 2 exams

R)CA
S)i mu la tor 4-6 14-6 / 2-3 s 9 / < 8 / r 4 2 1 1 2 1 / 2 1 2 1 / 2 1 1 2 1 2 2 / 2 2 / 2 1 I 3 1s 3 / I 2 (randomly selected) 2 1 / 2 1 1 2 1