ML050760429
| ML050760429 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 12/30/2004 |
| From: | Roy D Florida Power & Light Energy Seabrook |
| To: | Conte R NRC/RGN-I/DRS/OSB |
| Conte R | |
| References | |
| Download: ML050760429 (4) | |
Text
--
ES-301 Administrative Topics Outline Form ES-301-1 Seabrook Station Examination Level (circle one): SRO Administrative Topic (see Note)
Conduct of Operations Conduct of Operations Equipment Control Radiation Control Emergency Plan Type Code*
M/S+
N/S+
N/S+
N/S+
N/S Date of Examination: 1/31/05 Operating Test Number:
Describe activity to be performed (LO1 05J) Apply Technical Specifications and determine allowed outage time and mode restrictions.
(LOIT05) Evaluate the outcome of a Shutdown Margin Calculation (SDM) and determine impact on plant operations.
(LOIT06) Technical Specification Determination and identify required notifications of on-site and off-site personnel for an off-normal event.
(LOIT07) Review and authorize release of liquid waste.
(LOIT08) Post Scenario EAL Determination and Event Classification NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Types Codes & Criteria:
(C)ontrol Room (D)irect from bank (I 3 for ROs; s 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (2 1)
(P)revious 2 exams; (I 1; randomly selected)
(S)imulator +(may also be performed in classroom setting)
ES-301 Administrative
~~~
Topics
__ Outline Form ES-301-1
~
~~
~
Seabrook Station Examination Level (circle one): RO Date of Examination: 1/31/05 Operating Test Number:
Administrative Topic (see Note)
Conduct of Operations Conduct of Operations Equipment Control Radiation Control Emergency Plan TY Pe Code*
MIS+
MIS+
PIMIS N/S+
Describe activity to be performed (L0027J) Perform a manual (QPTR) Calculation (L0043J) Perform a Shutdown Margin Calculation (SDM) (Mode 1)
(L00021) Perform AC Power Source Weekly Surveil lance (LOIT04) Initiate a Liquid Effluent Sample Request.
NIA NIA VOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
Types Codes & Criteria:
(C)ontrol Room (D)irect from bank (I 3 for ROs; 5 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (2 1)
(P)revious 2 exams; (2 1; randomly selected)
(S)imulator +(may also be performed in classroom setting)
ES-301 Control Roomhn-Plant Svstems Outline Form ES-301-2 System / JPM Title Seabrook Station I Examination Level (circle one): RO Type Code*
Safety Function Date of Examination: 01/31/05 Operating Test Number:
- a. 001
- b. 006 LOITO1, Inadvertent Rod Withdrawal during Reactor S/D LO131 J, Transfer to Hot Leg Injection
- c. 010 L0024J, Post LOCA PORV Operation L0059J, Post Trip Primary Plant Stabilization L0058J, Transfer Service Water to the Cooling Tower
- d. 002
- e. 076
- f. 028 LOO84J, Start Hydrogen Recombiner
- g. 029 LOIT02, Containment On-Line Purge System Lineup
- h. 068 LOIT03, Respond to Liquid Radwaste High Radiation N/S/UA 1
M/S/A 2
D/S 3
D/S 4
P/D/S 4
P/D/S 5
N/S 8
N/S 9
- i. 063 L0022J, DC Load Shedding During ECA-0.0
- j. 01 2 L0008J, Local Reactor Trip During ATWS
- k. 008 L0055J, Makeup to CC Head Tank During System Leak (C)ontrol Room (D)irect from bank (E)mergency or abnormal in-plant (L)ow power (N)ew or (M)odified from bank including 1 (A)
(P)revious 2 exams
( W A (S)imulator D/E 6
D/E/A 7
D/E/R/A 8
Criteria for RO / SRO-I / SRO-U 4-6 14-6 12-3 19/18/14 2 1 / 2 1 121 2 1 121 121 2 2 / 2 2 / 2 1 I 3 / I 3 / I 2 (randomly selected) 2 1 / 2 1 / 2 1
ES-301 Control Roomlln-Plant Systems Outline Form ES-301-2 Seabrook Station Examination Level (circle one): SRO(I)
Date of Examination: 01/31/05 Operating Test Number:
Control Room Systems @ (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U)
System / JPM Title Type Code*
Safety Function
- a. 001 LOlTOl, Inadvertent Rod Withdrawal during Reactor S/D N/S/L/A 1
- b. 006 LO131 J, Transfer to Hot Leg Injection M/S/A 2
- d. 002 L0059J, Post Trip Primary Plant Stabilization D/S 4
- e. N/A for SRO Candidates P/D/S 4
- f. 028 L0084J, Start Hydrogen Recombiner P/D/S 5
In-Plant Systems @ (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)
- h. 063 L0022J, DC Load Shedding During ECA-0.0 D/E 6
- i. 012 L0008J, Local Reactor Trip During ATWS D/E/A 7
I I
- j.
008 L0055J, Makeup to CC Head Tank During System Leak 1
D/E/R/A I
8
@ All control room (and in-plant) systems must be different and serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
(A) It e r na t e Path (C)ontrol Room (D)irect from bank (E)mergency or abnormal in-plant (L)ow power (N)ew or (M)odified from bank including 1 (A)
(P)revious 2 exams
- R)CA
- S)i mu la tor 4-6 14-6 / 2-3 s 9 / < 8 / r 4 2 1 1 2 1 / 2 1 2 1 / 2 1 1 2 1 2 2 / 2 2 / 2 1 I 3 1s 3 / I 2 (randomly selected) 2 1 / 2 1 1 2 1