MONTHYEARML23334A2422023-11-30030 November 2023 Final QA Related Forms ML23334A2452023-11-30030 November 2023 75 Day and 150 Day Submittal Letters ML23298A1652023-10-26026 October 2023 Requalification Program Inspection ML23065A0682023-02-22022 February 2023 Final QA Related Forms ML23047A4142023-02-16016 February 2023 Operator Licensing Retake Examination Approval ML23040A2562023-02-0909 February 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22336A0792022-12-0202 December 2022 U2 - Final Qa/Related Forms ML22277A2522022-10-0404 October 2022 Requalification Program Inspection ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21350A1582021-12-16016 December 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21245A0672021-09-0202 September 2021 Operator Licensing Examination Approval ML21172A2372021-06-21021 June 2021 Requalification Program Inspection ML21105A6502021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20349A2262020-12-14014 December 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20307A0102020-11-0202 November 2020 Final Qa/Related Forms (Folder 1) ML20307A0642020-11-0202 November 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20307A0192020-11-0202 November 2020 Fina Qa/Related Form - Form ES-401-6 (Folder 1) ML20302A2342020-10-15015 October 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20303A0322020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20303A1442020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Exam (Written) ES-401-9 ML20303A0112020-09-18018 September 2020 Handouts to Applicants (Folder 3) ML20303A0162020-09-18018 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20302A2352020-09-18018 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20303A0142020-08-0707 August 2020 Draft Written Examination (Folder 2) ML20303A0122020-07-0202 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20105A1592020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20105A4342020-04-14014 April 2020 (Vcsns), Unit 1 - NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323C9172019-11-18018 November 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19238A0262019-08-22022 August 2019 Operator Licensing Examination Approval ML19120A3112019-04-29029 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19064B3922019-03-0505 March 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri ML18248A2662018-09-0404 September 2018 Operator Licensing Examination Approval ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18106A1602018-04-12012 April 2018 March 7, 2018, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE IR 05000423/20173012018-02-0606 February 2018 Initial Operator Licensing Examination Report 05000423/2017301 ML18029A6512018-01-29029 January 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18074A3682017-12-0101 December 2017 Handouts to Applicants, Summary of References (Folder 3) ML18074A3582017-12-0101 December 2017 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML18074A3562017-12-0101 December 2017 Final Qa/Related Forms (Folder 1) ML17334A0662017-11-29029 November 2017 Operator Licensing Examination Approval ML18029A6432017-11-27027 November 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML18029A6622017-11-27027 November 2017 Final Operating Exam (Section a, B and C) (Folder 3) ML18074A3662017-11-27027 November 2017 Final Outlines (Folder 3) ML18074A3602017-10-30030 October 2017 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML18074A3612017-10-15015 October 2017 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) 2023-02-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23334A2452023-11-30030 November 2023 75 Day and 150 Day Submittal Letters ML23334A2422023-11-30030 November 2023 Final QA Related Forms ML23065A0682023-02-22022 February 2023 Final QA Related Forms ML23047A4142023-02-16016 February 2023 Operator Licensing Retake Examination Approval ML23040A2562023-02-0909 February 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22336A0792022-12-0202 December 2022 U2 - Final Qa/Related Forms ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21350A1582021-12-16016 December 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21245A0672021-09-0202 September 2021 Operator Licensing Examination Approval ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20349A2262020-12-14014 December 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20307A0192020-11-0202 November 2020 Fina Qa/Related Form - Form ES-401-6 (Folder 1) ML20307A0102020-11-0202 November 2020 Final Qa/Related Forms (Folder 1) ML20307A0642020-11-0202 November 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20302A2342020-10-15015 October 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20302A2352020-09-18018 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20303A0112020-09-18018 September 2020 Handouts to Applicants (Folder 3) ML20303A0162020-09-18018 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20303A0322020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20303A1442020-09-18018 September 2020 NRC Comments on Draft Licensee-Developed Exam (Written) ES-401-9 ML20303A0142020-08-0707 August 2020 Draft Written Examination (Folder 2) ML20303A0122020-07-0202 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20105A4342020-04-14014 April 2020 (Vcsns), Unit 1 - NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323C9172019-11-18018 November 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19238A0262019-08-22022 August 2019 Operator Licensing Examination Approval ML18248A2662018-09-0404 September 2018 Operator Licensing Examination Approval ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18106A1602018-04-12012 April 2018 March 7, 2018, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 3 (Cover Letter Publicly Available, Enclosures Withheld from Public) IR 05000423/20173012018-02-0606 February 2018 Initial Operator Licensing Examination Report 05000423/2017301 ML18029A6512018-01-29029 January 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18074A3682017-12-0101 December 2017 Handouts to Applicants, Summary of References (Folder 3) ML18074A3562017-12-0101 December 2017 Final Qa/Related Forms (Folder 1) ML18074A3582017-12-0101 December 2017 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17334A0662017-11-29029 November 2017 Operator Licensing Examination Approval ML18029A6432017-11-27027 November 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML18029A6622017-11-27027 November 2017 Final Operating Exam (Section a, B and C) (Folder 3) ML18074A3662017-11-27027 November 2017 Final Outlines (Folder 3) ML18074A3602017-10-30030 October 2017 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML18074A3612017-10-15015 October 2017 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML18074A3642017-09-0707 September 2017 Draft Written Exam (Folder 2) ML18074A3652017-08-25025 August 2017 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML18074A3622017-06-27027 June 2017 Draft - Operating Outlines (Folder 2) ML18074A3632017-05-23023 May 2017 Draft - Written Outlines (Folder 2) ML17142A2962017-05-17017 May 2017 Preparation and Scheduling of Operator Licensing Examinations ML17103A0402017-04-12012 April 2017 Senior Reactor and Reactor Operator Initial License Examinations - Millstone Power Station, Unit 3 ML17087A0862017-03-23023 March 2017 Final Qa/Related Forms (Folder 1) ML17087A0882017-03-10010 March 2017 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML17087A0872017-03-10010 March 2017 Miscellaneous (Folder 1) 2023-02-09
[Table view] |
Text
March 17, 2005 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Dominion Resources 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
OPERATOR LICENSING EXAMINATION APPROVAL (MILLSTONE POWER STATION, UNIT 2)
Dear Mr. Christian:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Millstone Power Station, Unit 2.
The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. Michael J.
Wilson, Manager, Nuclear Training. Note that any examination waivers and application denials have been addressed in separate correspondence.
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG-1021, Operator Licensing Examinations Standards for Power Reactors, on March 18, 2005. The NRC staff will administer the operating tests during the week of March 21 - 24, 2005.
Please contact your Chief Examiner, Joseph DAntonio, at 610-337-5085, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
Sincerely,
/RA/
Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No. 50-336 License No. DPR-65
Mr. Christian cc w/o encl:
J. A. Price, Site Vice President - Millstone C. L. Funderburk, Director, Nuclear Licensing and Operations Support M. J. Wilson, Manager, Nuclear Training D. W. Dodson, Supervisor, Station Licensing L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations W. Meinert, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford R. Rubinstein, Waterford Library J. Markowicz, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control G. Proios, Suffolk County Planning Dept.
R. Shadis, New England Coalition Staff G. Winslow, Citizens Regulatory Commission (CRC)
S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)
R. Bassilakis, CAN J. M. Block, Attorney, CAN
Mr. Christian Distribution:
W. Lanning, DRS R. Conte, DRS J. DAntonio, Chief Examiner, DRS DRS Master Exam File (C. Bixler) (w/concurrences)
DRS File S. Glenn, INPO (GlennSG@Inpo.org)
Distribution: VIA E-MAIL:
S. Collins, RA J. Wiggins, DRA S. Lee, RI OEDO D. Roberts, NRR V. Nerses, NRR G. Wunder, NRR S. Schneider, Senior Resident Inspector E. Bartels, Resident OA P. Krohn, RI K. Jenison, RI T. Madden, OCA DOCUMENT NAME: E:\Filenet\ML050760391.wpd SISP Review Complete: RJC (Reviewers Initials)
ADAMS PKG: ML042440181 After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRS/OSB NAME CJBixler (CJB) JMDAntonio RJConte (RJC)
(JMD)
DATE 03/17/05 03/17/05 03/17/05 OFFICIAL RECORD COPY