MONTHYEAR05000395/LER-2024-002, Loss of Control Room Emergency Filtration System2024-10-15015 October 2024 Loss of Control Room Emergency Filtration System ML24290A1052024-10-0707 October 2024 Core Operating Limits Report VCSNS Unit 1 Cycle 29, Revision 0 ML24274A1942024-09-26026 September 2024 (Vcsns), Unit 1 Subsequent License Renewal Application (SLRA) First 10 CFR 54.21(b) Annual Amendment IR 05000395/20244042024-09-26026 September 2024 Cyber Security Inspection Report 05000395-2024404 - Public ML24267A0542024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0642024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0592024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0552024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) IR 05000395/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000395/2024402 IR 05000395/20240052024-08-22022 August 2024 Updated Inspection Plan for Virgil C. Summer Nuclear Station - Report 05000395/2024005 ML24190A4012024-08-19019 August 2024 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application - Dominion Energy Letter Dated May 30, 2024 IR 05000395/20240022024-08-12012 August 2024 Integrated Inspection Report 05000395/2024002 ML24180A0062024-08-0505 August 2024 Issuance of Amendment No. 227 to Modify Technical Specification 3.8.3.1 to Increase Completion Time for 120-Volt A.C. Vital Busses ML24218A3002024-08-0101 August 2024 Environmental Review Response to NRC Requests for Additional Information and Response to NRC Requests for Confirmation of Information Set 1 ML24158A3882024-07-31031 July 2024 Issuance of Amendment No. 226 to Change Emergency Plan Staff Augmentation Times and Relocate Emergency Operations Facility ML24162A3292024-07-0505 July 2024 Letter to E Carr - V.C. Summer Unit 1 - Summary of the May 2024 Audit Regarding the Environmental Review of the Subsequent License Renewal Application IR 05000395/20240112024-06-26026 June 2024 – Comprehensive Engineering Team Inspection Report 05000395/2024011 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24178A1192024-06-25025 June 2024 Update to License Amendment Request- Inverter Allowed Outage Time (AOT) Extension ML24177A1382024-06-25025 June 2024 Aging Management Audit Report- VC Summer, Unit 1 - Subsequent License Renewal Application ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24171A0152024-06-17017 June 2024 Update to Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Set 2 Safety Review ML24157A3352024-06-0606 June 2024 – Notification of an NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000395-2024404 and Request for Information ML24155A2042024-05-31031 May 2024 Proposed Alternative Request RR-24-123, Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML24155A1462024-05-30030 May 2024 Update to Subsequent License Renewal Application (SLRA) -Response to NRC Request for Additional Information Set 1 Response to NRC Request for Confirmation of Information Set 1 and Supplement 3 ML24143A1792024-05-22022 May 2024 Special Report 2024-001-01 for Virgil C. Summer Nuclear Station (Vcsns), Unit 1, Waste Gas System Inoperability ML24141A2822024-05-20020 May 2024 (Vcsns), Unit 1 - License Amendment Request - Emergency Response Organization (ERO) Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes IR 05000395/20240012024-05-10010 May 2024 Integrated Inspection Report 05000395/2024001 ML24129A2002024-05-0606 May 2024 Update to Subsequent License Renewal Application, Supplement 2 IR 05000395/20240402024-05-0101 May 2024 95001 Supplemental Inspection Report 05000395/2024040 and Follow-Up Assessment Letter ML24120A2072024-04-29029 April 2024 Submittal of Annual Radiological Environmental Operating Report ML24121A1002024-04-29029 April 2024 Response to Request for Additional Information Regarding Alternative Request RR-5-V2 ML24116A2052024-04-23023 April 2024 Annual Radioactive Effluent Release Report ML24109A1792024-04-19019 April 2024 Aging Management Audit Plan Regarding the Subsequent License Renewal Application Review ML24108A0392024-04-18018 April 2024 Letter to E Carr-V.C. Summer Unit 1- Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application ML24108A1432024-04-17017 April 2024 (Vcsns), Unit 1, Automatic Actuation of B Emergency Diesel Generator ML24108A0672024-04-17017 April 2024 Submittal of Summary for Condition of the Service Water Intake Structure Provided in Accordance with License Condition 2.C.5.d ML24100A7312024-04-0909 April 2024 Personnel Exposure and Monitoring Annual Report ML24095A2072024-04-0101 April 2024 Update to Subsequent License Renewal Application (SLRA) Supplement 1 ML24088A2062024-03-26026 March 2024 Annual Operating Report ML24087A2182024-03-26026 March 2024 (Vcsns), Unit 1 - License Amendment Request - Emergency Response Organization (ERO) Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes - Response to Request. ML24087A2262024-03-26026 March 2024 License Amendment Request - Inverter Allowed Outage Time Extension Response to Request for Additional Information ML24067A0232024-03-0707 March 2024 (Vcsns), Unit 1 - Readiness for 95001 Supplemental Inspection; EA-23-093 IR 05000395/20230062024-02-28028 February 2024 Annual Assessment Letter for Virgil C. Summer Nuclear Station - Report 05000395/2023006 IR 05000395/20244032024-02-27027 February 2024 Security Baseline Inspection Report 05000395/2024403 ML24057A1132024-02-22022 February 2024 Special Report 2024-001 Waste Gas System Inoperability ML24051A0112024-02-20020 February 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Proposed Project Location or May Be Affected by Proposed Project for V.C. Summer SLR ML24057A0612024-02-19019 February 2024 and Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage ML24032A3062024-02-15015 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24040A1802024-02-12012 February 2024 Notification of NRC Supplemental Inspection (95001) and Request for Information 2024-09-26
[Table view] Category:Meeting Notice
MONTHYEARPMNS20241015, Pre-submittal Meeting with Dominion Energy Regarding a Planned License Amendment Request for VC Summer to Modify the Core Operating Limits Report (COLR) and Implement Topical Report WCAP-176612024-08-12012 August 2024 Pre-submittal Meeting with Dominion Energy Regarding a Planned License Amendment Request for VC Summer to Modify the Core Operating Limits Report (COLR) and Implement Topical Report WCAP-17661 PMNS20240860, Pre-submittal Meeting with Dominion Energy Regarding a Planned Fleet License Amendment Request for Selected Sites to Modify Moderator Temperature Coefficient (Mtc) Technical Specifications (Tss)2024-07-0303 July 2024 Pre-submittal Meeting with Dominion Energy Regarding a Planned Fleet License Amendment Request for Selected Sites to Modify Moderator Temperature Coefficient (Mtc) Technical Specifications (Tss) PMNS20240512, 2023 Annual Assessment Meeting2024-04-11011 April 2024 2023 Annual Assessment Meeting PMNS20231408, Notice of Meeting with Dominion Energy South Carolina (Desc) to Discuss Virgil C. Summer Nuclear Stations Seismic Risk Analysis2024-01-10010 January 2024 Notice of Meeting with Dominion Energy South Carolina (Desc) to Discuss Virgil C. Summer Nuclear Stations Seismic Risk Analysis PMNS20231234, Regulatory Conference with Dominion Energy - Virgil C. Summer Nuclear Station2023-11-0202 November 2023 Regulatory Conference with Dominion Energy - Virgil C. Summer Nuclear Station PMNS20231215, Environmental Scoping Meeting Related to the V.C. Summer Subsequent License Renewal Application2023-10-30030 October 2023 Environmental Scoping Meeting Related to the V.C. Summer Subsequent License Renewal Application PMNS20231214, Environmental Scoping Meeting Related to the V.C. Summer Nuclear Station Subsequent License Renewal Application2023-10-27027 October 2023 Environmental Scoping Meeting Related to the V.C. Summer Nuclear Station Subsequent License Renewal Application PMNS20231149, Pre-submittal Meeting with Dominion Energy Regarding a Planned License Amendment Request for VC Summer to Extend the Required Completion Time for Technical Specification 3/4.8.3, Action C2023-10-0606 October 2023 Pre-submittal Meeting with Dominion Energy Regarding a Planned License Amendment Request for VC Summer to Extend the Required Completion Time for Technical Specification 3/4.8.3, Action C PMNS20230620, 2022 Annual Assessment Meeting2023-05-12012 May 2023 2022 Annual Assessment Meeting PMNS20230047, Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal to Relocate the Emergency Operations Facility for the VC Summer Power Station2023-01-26026 January 2023 Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal to Relocate the Emergency Operations Facility for the VC Summer Power Station PMNS20220829, Public Meeting with Dominion Energy to Discuss a Planned Request for Approval of a Modification to the Reactor Vessel Surveillance Capsule Removal Schedule for VC Summer Nuclear Generating Station2022-08-31031 August 2022 Public Meeting with Dominion Energy to Discuss a Planned Request for Approval of a Modification to the Reactor Vessel Surveillance Capsule Removal Schedule for VC Summer Nuclear Generating Station PMNS20220449, V.C. Summer Nuclear Station 2021 Annual Assessment Meeting2022-04-26026 April 2022 V.C. Summer Nuclear Station 2021 Annual Assessment Meeting PMNS20210382, the U.S. Nuclear Regulatory Commission (NRC) Will Hold a Webinar to Discuss the Nrc'S Assessment of Safety Performance at the V. C. Summer, North Anna and Surry Power Stations for 20202021-04-12012 April 2021 the U.S. Nuclear Regulatory Commission (NRC) Will Hold a Webinar to Discuss the Nrc'S Assessment of Safety Performance at the V. C. Summer, North Anna and Surry Power Stations for 2020 ML14076A1132014-03-17017 March 2014 Notice of Public Meeting to Provide an Open Public Forum to Discuss the Annual Assessment of the Virgil C. Summer Nuclear Station, Unit 1 ML14065A5602014-03-0606 March 2014 March 27, 2014 Notice of Public Meeting/Open House Regarding the Virgil C. Summer, Unit 1, to Discuss the Annual Assessment ML14063A5462014-03-0404 March 2014 Notice of Category 3 Public Meeting/Open House with South Carolina Electric & Gas Company to Discuss Annual Assessment ML13178A2572013-06-25025 June 2013 Ltr. to Joseph A. Miller Participating in a Public Commission Meeting on Nrc'S Construction Sctivities, on August 27, 2013 ML13178A2522013-06-25025 June 2013 Ltr. to Luke Scorsone Participate in a Public Commission Meeting on Nrc'S Construction Activities, on August 27, 2013 ML13142A1572013-05-29029 May 2013 Update for 06/20/13 Meeting Notice with South Carolina Electric & Gas Company Regarding Voluntary Fire Protection Risk Initiative Self Assessment ML13136A0562013-05-16016 May 2013 7/23-24/2013 Notice of Public Meeting Announcement with All Region II Licensees, Initial Examination Writers' Workshop ML13122A1782013-05-13013 May 2013 Notice of Forthcoming Meeting with South Carolina Electric & Gas Company Regarding Voluntary Fire Protection Risk Initiative Self Assessment ML13084A0892013-03-25025 March 2013 Notice of Forthcoming Public Meeting/Open House Regarding Virgil C. Summer Nuclear Station Unit 1 Annual Assessment ML13067A2592013-03-11011 March 2013 Forthcoming Meeting with South Carolina Electric & Gas Company Regarding Proposed Emergency Plan Change for Virgil C. Summer Nuclear Station, Unit No. 1 ML12221A2612012-08-0707 August 2012 09/25-26/2012 Noticeo of Meeting Announcement - 2012 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers' Workshop ML12129A3832012-05-0808 May 2012 Public Meeting/Open House Regarding Virgil C. Summer Nuclear Station, Unit 1, Annual Assessment and NRC Construction Oversight of Units 2 and 3 Combined Licenses ML1115403882011-06-0202 June 2011 08/02-03/2011 Meeting Announcement - 2011 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers Workshop ML1112505292011-05-0505 May 2011 Meeting Announcement - Public Meeting/Open House - Virgil C. Summer Nuclear Station ML1106800552011-03-0909 March 2011 Notice of Forthcoming Meeting with South Carolina Electric & Gas Company, (Sce&G), to Discuss NFPA 805 License Amendment for Virgil C. Summer Nuclear Station, Unit 1 ML1015501432010-06-0404 June 2010 08/17-18/2010 Meeting Announcement - 2010 NRC Initial Exam Writers Workshop ML1014400532010-05-21021 May 2010 Notice of Public Meeting to Discuss Fire Protection Screening Criteria Identified at Browns Ferry and Their Implications to Virgil C. Summer Nuclear Station - Docket No. 05000395 ML1010307342010-04-13013 April 2010 Notice of Public Meeting/Open House with Virgil C. Summer ML1009600382010-04-0606 April 2010 Notice of Meeting with South Carolina Electric & Gas Company to Discuss the NRC Reactor Oversight Process and the Annual Assessment of the Virgil C. Summer Nuclear Station ML0924606222009-09-0303 September 2009 Forthcoming Conference Call with South Carolina Electric & Gas, to Discuss the Licensee'S Planned Response to the Nrc'S Request for Additional Information Pertaining to Generic Letter 2004-02, Potential Impact of Debris ML0918004532009-06-29029 June 2009 Meeting Announcement - Category 2 Public Meeting, 2009 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Development Workshop ML0908303102009-03-24024 March 2009 Notice of Category 3 Public/Open House Meeting with Virgil C. Summer to Discuss NRC Reactor Oversight Process and Annual Assessment ML0832603962008-11-19019 November 2008 Notice of Meeting with South Carolina Electric & Gas Company to Review Review the Accomplishments Achieved During the Spring 2008 Refueling Outage ML0819600282008-07-11011 July 2008 08/05-06/2008-Notice of Meeting - 2008 Us Nuclear Regulatory Commission Initial Examination Development Workshop ML0809204512008-03-31031 March 2008 Notice of Public Meeting to Goals and Major Activities Scheduled for the Spring Refueling Outage at the Virgil C. Summer Nuclear Station ML0807100082008-03-11011 March 2008 Notice of Meeting with Arizona Public Service, Entergy Operations, Inc., Exelon Generation Co., FPL Energy, Luminant Generation Co., South Carolina Electric & Gas Co., STP Electric Generating Co., & Southern Nuclear Operating Co ML0806704962008-03-0707 March 2008 Public Meeting - Category 1 Announcement ML0722604852007-08-14014 August 2007 Notice of Public Meeting, Virgil C. Summer, Units 2 and 3, Combined License Application ML0718404412007-07-0303 July 2007 Notice of Predecisional Enforcement Conference with South Carolina Electric & Gas Company to Discuss the Significance of the Apparent Violation (AV) Documented in Inspection Report No. 50-395/2007-502 ML0713706072007-05-17017 May 2007 Notice of Meeting for NRC Training Managers' Conference Hosting by Rgn II ML0709500972007-04-0404 April 2007 Notice of Meeting with South Carolina Electric & Gas Company to Discuss Fall 2006 Refueling Outage at the Virgil C. Summer Nuclear Station ML0708711762007-03-28028 March 2007 Notice of Public Meeting with South Carolina Electric and Gas Company to Discuss the NRC Reactor Oversight Process Annual Assessment of Virgil C. Summer Nuclear Station ML0623303432006-08-29029 August 2006 Forthcoming Meeting with South Carolina Electric & Gas Company to Discuss the NRC Staff'S Evaluation Report of August 22, 2006 on Generic Letter 96-06 for V.C. Summer ML0623500042006-08-22022 August 2006 Notice of Meeting with South Carolina Electric & Gas Company to Discuss Planned Activities Associated with the Fall 2006 Refueling Outage at the Virgil C. Summer Nuclear Station ML0618700742006-07-0505 July 2006 and 07/20/2006 Meeting Announcement 2006 NRC Initial Exam Development Workshop to Clarify the Exam Development Process and Question Development for Both the Written and Operating Portion of the Initial Examination ML0615302842006-06-0505 June 2006 Notice of Meeting with South Carolina Electric & Gas Company Online Monitoring of Instrument Channel Performance at V. C. Summer ML0607600492006-03-17017 March 2006 Notice of Forthcoming Public Meeting, with South Carolina Electric & Gas Company, to Discuss the Root Cause Evaluation for the High Failure Rate on the Operator Licensing Initial Written Examination on January 10, 2006 2024-08-12
[Table view] |
Text
March 16, 2005 South Carolina Electric & Gas Company ATTN: Mr. Jeffrey B. Archie Vice President, Nuclear Operations Virgil C. Summer Nuclear Station P. O. Box 88 Jenkinsville, SC 29065
SUBJECT:
MEETING ANNOUNCEMENT - PUBLIC MEETING - VIRGIL C. SUMMER NUCLEAR POWER STATION, DOCKET NO. 50-395
Dear Mr. Archie:
This letter confirms the conversation between Mr. Ron Clary of your staff and Mr. John Zeiler of the NRC staff on March 15, 2005, concerning a Category 1 public meeting which has been scheduled for March 31, 2005, at 1:00 p.m. (EST) at the Region II Office, Sam Nunn Atlanta Federal Center, 61 Forsyth Street, S.W., Atlanta, Georgia, in Suite 24T25. The meeting notice, which provides additional details, is enclosed. The purpose of the meeting, conducted at your request, is to discuss the upcoming refueling outage as well as recent enhancements to your corrective action program.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact me at (404) 562 -
4510.
Sincerely,
/RA by Binoy Desai Acting For/
Kerry D. Landis, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket No.: 50-395 License No.: NPF-12
Enclosure:
As stated cc w/encl: (see page 2)
SCE&G 2 cc w/encl:
R. J. White Nuclear Coordinator Mail Code 802 S.C. Public Service Authority Virgil C. Summer Nuclear Station Electronic Mail Distribution Kathryn M. Sutton, Esq.
Winston & Strawn LLP Electronic Mail Distribution Henry J. Porter, Director Div. of Radioactive Waste Mgmt.
Dept. of Health and Environmental Control Electronic Mail Distribution R. Mike Gandy Division of Radioactive Waste Mgmt.
S. C. Department of Health and Environmental Control Electronic Mail Distribution Thomas D. Gatlin, General Manager Nuclear Plant Operations (Mail Code 303)
South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Electronic Mail Distribution Ronald B. Clary, Manager Nuclear Licensing & Operating Experience (Mail Code 830)
South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station Electronic Mail Distribution
OFFICE RII/DRP SIGNATURE BBD NAME BDesai DATE 3/8/2005 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
SUBJECT:
PUBLIC MEETING WITH SOUTH CAROLINA ELECTRIC AND GAS FACILITY: V. C. Summer Nuclear Station DOCKETS: 50-395 DATE & TIME: Thursday, March 31, 2005 1:00 p.m. to 3:00 p.m. (EST)
LOCATION: NRC RII Office, Sam Nunn Atlanta Federal Center, 61 Forsyth Street, S.W., Atlanta, Georgia, in Suite 24T25.
PURPOSE: The purpose of this meeting is to discuss the upcoming refueling outage as well as recent enhancements to the corrective action program at the V. C. Summer Power Station. The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding visitors and security.
CATEGORY: This is a Category 1 meeting: The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
NRC OFFICE(S)
PARTICIPATING: Region II OTHER ORGANIZATIONS PARTICIPATING: None PARTICIPANTS: NRC (partial list)
Dr. W. Travers, Administrator, R II V. McCree, Director, DRP, RII C. Casto, Director, DRS, RII K. Landis, Chief, Reactor Projects Branch 5, DRP, RII LICENSEE (partial list)
S. Burne, Senior Vice President and Chief Nuclear Officer J. Archie, Vice President, Nuclear Operations A. Torres, Planning/Outage Manager D. Lavigne, Organizational Effective Manager R. Sweet, Nuclear Licensing Supervisor MEETING CONTACT: Kerry Landis, NRC, RII (404)562-4510 kdl@nrc.gov Enclosure