ML050750237
| ML050750237 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 03/14/2005 |
| From: | Abney T Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards |
| References | |
| Download: ML050750237 (3) | |
Text
March 14, 2005 10 CFR 72.212 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 Gentlemen:
In the Matter of )
Docket Nos. 50-259 Tennessee Valley Authority )
50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - UNITS 1, 2 AND 3 DAY NOTIFICATION PURSUANT TO 10 CFR 72.212(b)(1)(i) OF INTENT TO LOAD SPENT FUEL UNDER A GENERAL LICENSE Pursuant to 10 CFR 72.212, Conditions of general license issued under 10 CFR 72.210, TVA is notifying NRC at least 90 days prior to the first storage of spent fuel, of our intent to begin loading spent fuel into an approved storage cask under the general license at BFN. Based on the current BFN schedule, the earliest date to start loading activities will be on or after July 11, 2005.
Licensee Name:
Tennessee Valley Authority License Address:
Post Office Box 2000 Decatur, Alabama 35609-2000 Reactor License Nos.
DPR-33 DPR-52 DPR-68 There are no new regulatory commitments in this letter. If you have any questions, please contact me at (256) 729-2636.
Sincerely, Original signed by:
T. E. Abney Manager of Licensing and Industry Affairs cc: See Page 2
U.S. Nuclear Regulatory Commission Page 2 March 14, 2005 cc:(Via NRC Electronic Distribution)
Mr. William D. Travers Regional Administrator, Region II U.S. Nuclear Regulatory Commission Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 Mr. Stephen J. Cahill, Branch Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 Ms. Eva A. Brown, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9) 11555 Rockville Pike Rockville, Maryland 20852-2739 Ms. Margaret Chernoff, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9) 11555 Rockville Pike Rockville, Maryland 20852-2739
U.S. Nuclear Regulatory Commission Page 4 March 14, 2005 DTL:JWD:BAB cc: A. S. Bhatnagar, LP 6A-C J. C. Fornicola, LP 6A-C D. F. Helms, BR 4T-C R. G. Jones, NAB 1A-BFN K. L. Krueger, POB 2C-BFN R. F. Marks, PAB 1C-BFN F. C. Mashburn, BR 4X-C N. M. Moon, LP 6A-C J. R. Rupert, NAB 1A-BFN K. W. Singer, LP 6A-C M. D. Skaggs, PAB 1E-BFN E. J. Vigluicci, ET 11A-K NSRB Support, LP 5M-C EDMS WT CA-K s:\\lic\\submit\\subs\\BFN 10 CFR 72.212(b)(1)(i) 90 Day Notification.doc