March 11, 2005 Mr. Gregory M. Rueger Senior Vice President, Generation and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P. O. Box 3 Avila Beach, CA 93424
SUBJECT:
DIABLO CANYON POWER PLANT, UNIT NO. 1 (TAC NO. MC2024) AND UNIT NO. 2 (TAC NO. MC2025) - CORRECTION TO PAGE ISSUED IN AMENDMENT NOS. 179 AND 181, RESPECTIVELY
Dear Mr. Rueger:
In its letter dated January 31, 2005, the Nuclear Regulatory Commission (NRC) issued the Amendment No. 179 to Facility Operating License No. DPR-80 and Amendment No. 181 to Facility Operating License No. DPR-82 for the Diablo Canyon Power Plant, Unit Nos. 1 and 2, (DCPP) respectively. In those amendments, changes to the Technical Specifications (TSs) were issued in response to your application dated February 13, 2004 (DCL-04-013), as supplemented by letters dated November 5 and December 10, 2004 (DCL-04-153 and DCL-04-170, respectively).
In issuing the new pages to the TSs on January 31, 2005, we inadvertently did not include the changes on TS page 3.3-14 that were previously issued by NRC on December 2, 2004, for Amendments 178 and 180. Enclosed is a new page 3.3-14 for the TSs, which includes the changes for both Amendment Nos. 178 and 180, and Nos. 179 and 181.
Sincerely,
/RA/
Jack N. Donohew, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323
Enclosure:
Change to the Technical Specification cc w/encl: See next page
March 11, 2005 Mr. Gregory M. Rueger Senior Vice President, Generation and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P. O. Box 3 Avila Beach, CA 93424
SUBJECT:
DIABLO CANYON POWER PLANT, UNIT NO. 1 (TAC NO. MC2024) AND UNIT NO. 2 (TAC NO. MC2025) - CORRECTION TO PAGE ISSUED IN AMENDMENT NOS. 179 AND 181, RESPECTIVELY
Dear Mr. Rueger:
In its letter dated January 31, 2005, the Nuclear Regulatory Commission (NRC) issued the Amendment No. 179 to Facility Operating License No. DPR-80 and Amendment No. 181 to Facility Operating License No. DPR-82 for the Diablo Canyon Power Plant, Unit Nos. 1 and 2, (DCPP) respectively. In those amendments, changes to the Technical Specifications (TSs) were issued in response to your application dated February 13, 2004 (DCL-04-013), as supplemented by letters dated November 5 and December 10, 2004 (DCL-04-153 and DCL-04-170, respectively).
In issuing the new pages to the TSs on January 31, 2005, we inadvertently did not include the changes on TS page 3.3-14 that were previously issued by NRC on December 2, 2004, for Amendments 178 and 180. Enclosed is a new page 3.3-14 for the TSs, which includes the changes for both Amendment Nos. 178 and 180, and Nos. 179 and 181.
Sincerely,
/RA/
Jack N. Donohew, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-275 DISTRIBUTION:
and 50-323 PUBLIC GHill (4)
PDIV-2 Reading TBoyce
Enclosure:
Change to the Technical RidsNrrDlpmPdiv (HBerkow)
Specification RidsNrrPMGShukla RidsNrrLALFeizollahi RidsOgcRp cc w/encl: See next page RidsAcrsAcnwMailCenter RidsRegion4MailCenter(BJones)
RidsNrrDlpmPdiv2(RGramm)
TS: ML050750263 NRR-100 PKG: ML050740544 ACCESSION NO.: ML050740539 NRR-106 OFFICE PDIV-2/PM PDIV-2/LA PDIV-2/SC NAME JDonohew LFeizollahi RGramm DATE 3/11/05 3/10/05 3/11/05 DOCUMENT NAME: E:\\Filenet\\ML050740539.wpd OFFICIAL RECORD COPY
ATTACHMENT FOR CORRECTION TO LICENSE AMENDMENT NO. 179 TO FACILITY OPERATING LICENSE NO. DPR-80 AND AMENDMENT NO. 181 TO FACILITY OPERATING LICENSE NO. DPR-82 DOCKET NOS. 50-275 AND 50-323 Replace the following page of the Appendix A Technical Specifications with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.
REMOVE INSERT 3.3-14 3.3-14
June 2004 Diablo Canyon Power Plant, Units 1 and 2 cc:
NRC Resident Inspector Diablo Canyon Power Plant c/o U.S. Nuclear Regulatory Commission P.O. Box 369 Avila Beach, CA 93424 Sierra Club San Lucia Chapter c/o Henriette Groot 1000 Montecito Road Cayucos, CA 93430 Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, CA 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, CA 93408 Mr. Truman Burns Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, CA 94102 Diablo Canyon Independent Safety Committee ATTN: Robert R. Wellington, Esq.
Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Richard F. Locke, Esq.
Pacific Gas & Electric Company P.O. Box 7442 San Francisco, CA 94120 Mr. David H. Oatley, Vice President and General Manager Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 City Editor The Tribune 3825 South Higuera Street P.O. Box 112 San Luis Obispo, CA 93406-0112 Mr. Ed Bailey, Chief Radiologic Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)
Sacramento, CA 95899-7414 Mr. James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 31)
Sacramento, CA 95814 Mr. James R. Becker, Vice President Diablo Canyon Operations and Station Director Diablo Canyon Power Plant P.O. Box 3 Avila Beach, CA 93424