N Nebraska Public Power District Always there when you need us NI S2005025 March 10, 2005 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Monthly Operating Report for February 2005 Cooper Nuclear Station, Docket 50-298, DPR-46 The purpose of this letter is to provide the Cooper Nuclear Station Monthly Operating Report for February 2005. In accordance with the guidance provided by Generic Letter 97-02, this report includes an Operating Data Report and Unit Shutdown Report for the month of February. In accordance with Technical Specification 5.6.4, this report also includes documentation of challenges to the safety/relief valves.
Should you have any comments or require additional information regarding this report, please contact Paul Fleming at (402) 825-2774.
Sincerely,
/ulV. FI Licensing Manager
/cb Enclosure cc:
NRC Regional Administrator NRC Senior Resident Inspector ANI Library J. M. Cline A. L. Dostal J. C. Roberts S. Moffitt INPO Records Center Records W. J. Fehrman W. D. Shanks R. K. Edington
'B. Lewis G. W. Griffith J. W. Dutton R. L. Gumim L. J. Wells COOPER NUCLEAR STATION P.O. Box 98/ Brownville. NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 vww.nppd.corn jj2-H
APPENDIX A OPERATING DATA REPORT DOCKET NO.
050-0298 UNIT NAME Cooper Nuclear Station DATE 3/10/2005 COMPLETED BY Rodrick D. I,1Ison TELEPHONE (402) 825-5135 Reporting Period: February 2005 This Month Yr.-to-Date Cumulative
- 1.
Design Electrical Rating (Net tre).
The nominal net electrical output of the unit specified by the utility and used for the purpose of plat design.
778.0 N/A NA
- 2.
Maximum Dependable Capacity (Net Mt e):
The gross electrical output as measured at the output tcnninals of the turbine-generator during the most restrictive seasonal conditions minus the normal station service loads.
764.0 NMA N.A
- 3.
Number of I lours the Reactor Was Critical.
The total number of hours during the gross hours of the reporting period that the reactor was critical.
274.4 610.4 207.944.7
- 4.
Number of I ]ours the Generator Was On Line.
(Also called Scrvice Hours). The total number of hours during the gross hours of thse reporting period that the unit operated with the breakers closed to the station bus.
The sumn of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.
- 5.
Unit Reserve Shutdown Ilours.
The total number of hours during the gross hours of the reporting period that the unit was renmovcd front senr ice for economic or similar reasons but was aailable for operation.
241.4 0.0 577.4 0.0 204.984.1 0.0
- 6.
Net Electrical Energy I MWII).
The gross electrical output of the unit measured at the output terminals of the turbine-generator minus the nonnal station service loads during the gross hours of the reporting period. expressed in mega-watt hours. Negatise quantities should not be used, 168.277.0
_381.252.0 139.707.030.0 3/55/20C!
4 :42 AM
APPENDIX B UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHIONE 050-0298 Cooper Nuclear Station 3/10/2005 Rodrick D. Wilson (402) 825-5135 REPORT MONTH Februarn' 2005 Type Mfethod Of Shutting CM ET No.
Date F:
TORCED Duration (Iours)
Reason (I)
Down (2)
CAUSEtORRECTIVEACTIONS COMMENTS S:
SCIIEDULED os0n I a51 1l05 S
SCIIEDUlEl) 430.6 C
4 Plant sht down 00I: t i1i5/05 for refueling outage 22. Generator onhlne at 22l33 on 2/18/0s
SUMMARY
Plant shut down 0: oIS/15s for rchfcling outage 22. Generator online at 22:33 on 2/1i/OS (I) Reason:
A - EquIpment Failure (Explain) n. Maintenance or Test C-RefuelIng D - Regulatory Restriction E. Operator Training/Llecense Examination F. Administrative G - OperatIonal Error (Explain) 11-Other (Explain)
(2) Method:
I Mannal 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3/10/2005 6:43 AM
APPENDIX C SAFETY/RELIEF VALVE CHALLENGES FEBRUARY 2005 There were no challenges to the safety/relief valves during the month of February.
I ATTACHMENT 3 LIST OF REGULATORY COMMITMENTSl Correspondence Number: NLS2005025 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing & Regulatory Affairs Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITTED DATE COMMITMENT OR OUTAGE None I
PROCEDURE 0.42 l
REVISION 15 l