ML050670346

From kanterella
Jump to navigation Jump to search
Semiannual Fitness for Duty Performance Report
ML050670346
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/28/2005
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
10 CFR 26.71, L-2005-55
Download: ML050670346 (3)


Text

FPL 10 CFR 26.71 L-2005-55 February 28, 2005 U.S Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555 Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Semiannual Fitness for Duty Performance Report Attached is the Semiannual Fitness for Duty Performance Report for the period of July 1, 2004, through December 31, 2004, for Turkey Point Units 3 and 4, as required by 10 CFR 26.71 (d).

The Turkey Point Fitness for Duty Program uses a random testing rate of at least 50%.

The attachment contains the program performance data, as well as, a list of events reported and a summary of any management actions taken.

Should there be any questions or comments regarding this information, please contact Mr. Walter Parker at 305-246-6632.

Very truly yours, Terry 0. Jones Vice President Turkey Point Nuclear Plant Attachment cc:

Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant an FPL Group company

Attachment FPL Letter L2005-55 Page 1 of 2 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10 CFR 26 Florida Power & Light (FPL) 31 December 2004 Company Six (6) Month Ending Turkey Point Plant Location Jim Denton (305) 246-7171 Contact Name Phone (include Area Code)

Cutoffs: ScreenlConfirmation (ng/ml)

Appendix A to 10 CFR 26 Marijuana 50/10 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opiates 300/300 Alcohol (%BAC)

.04%

LICENSEE LONG-TERM SHORT-TERM TESTING LICENSEE TEMPORARY CONTRACTOR CONTRACTOR RESULTS EMPLOYEES EMPLOYEES PERSONNEL PERSONNEL Average Number with Unescorted Access 869 21 173 732 TOTAL:

1795 CATEGORIES TESTED POSITIVE TESTED POSITIVE TESTED POSITIVE TESTED POSITIVE Pre-Access 99 0

21 0

0 0

1463 13 TOTAL: 1583 Post 0

0 0

0 1

0 2

0 For Accident Cause Observed 0

0 0

0 0

0 3

1 Behavior Random 209 0

6 0

52 0

189 0

TOTAL: 456 Follow-up 13 0

0 0

0 0

14 0

TOTAL: 27 Other ITOTAL 321 0

27 0

53 0

1671 14

Attachment FPL Letter L-2005-55 Page 2 of 2 6 Month Report Ending:.

FITNESS FOR DUTY PROGRAM PERFORMANCE DATA a

PERSONNEL SUBJECT TO 10 CFR 26 31 December 2004 (3) of the positive drug tests for marijuana listed above exceeded the Florida Power & Light cutoff level (50ng/ml) but did not exceed the DHHS/NRC cutoff level (1 bong/ml). All of the remaining positive drug test results listed above exceeded the DHHS/NRC cutoff levels. One 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> reportable event was reported in September 2004. A contract supervisor was positive for marijuana.

FFD Performance Data Review/Comments:

1. Were any programmatic weaknesses identified:.

NONE

2. What management actions have been taken or initiated? If any, exp
3. Notate any specimens that were adulterated and substance detectec lain:

NONE NONE

4. 2004 Percent of Random Population Tested:.
51.16%