|
---|
Category:E-Mail
MONTHYEARML24032A4702024-02-0101 February 2024 Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24024A0202024-01-24024 January 2024 Correction to Safety Evaluation Associated Wit Amendment No. 288 - Revision to Applicability Term for RCS Heat-Up and Cooldown Pressure-Temperature Limitations Figures ML24024A2452024-01-24024 January 2024 1/24/2024 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in SE for Amendment No. 288 - Revision to Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23326A0132023-11-22022 November 2023 Acceptance Review Determination LAR to Support Implementation of Framatome Gaia Fuel ML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23317A0732023-11-13013 November 2023 Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a ML23297A2312023-10-24024 October 2023 E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia Fuel ML23265A2302023-09-22022 September 2023 Acceptance Review Determination - License Amendment Request Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML23258A0552023-08-31031 August 2023 Setup of Online Reference Portal and Audit Plan for the NRC Staff'S Review of LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies (08/31/2023 e-mail) ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23172A0752023-06-21021 June 2023 Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23145A0052023-05-25025 May 2023 Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod Cladding ML23145A0042023-05-25025 May 2023 Acceptance Review Determination LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies ML23115A3022023-04-24024 April 2023 4/24/2023 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Issuance of Amendments Adoption of TSTF-359, Increase Flexibility in Mode Restraints ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23038A0152023-02-0707 February 2023 Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23024A1522023-01-24024 January 2023 Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML22320A5752022-11-16016 November 2022 E-mail to File - Summary of October 18, 2022, Meeting with Dominion to Discuss Requested Actions for Implementing Framatome Gaia Fuel ML22298A2052022-10-25025 October 2022 Acceptance Review Determination for Alternative Request for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles ML22292A3212022-10-19019 October 2022 Acceptance Review Determination for Alternative Request for Containment RSS Pump Periodic Verification Testing Program ML22297A1802022-10-0707 October 2022 Email Acknowledgement to Dominion Energy Nuclear Decommissioning Trust Fund Disbursement 30 Day Notification for Millstone Power Station Unit 1: Docket No 50-245 ML22278A0932022-10-0505 October 2022 E-mail to File - Summary of September 7, 2022, Meeting with Dominion to Discuss Proposed Supplement to the Spent Fuel Pool Criticality Safety Analysis (EPID L-2022-LRM-0059 ML22272A0332022-09-29029 September 2022 Memo E-mail to File - Summary of August 29, 2022, Meeting with Dominion to Discuss Proposed Alternative Request Post-peening follow-up Volumetric Exam of RPV Head Penetration Nozzle ML22252A1772022-09-0909 September 2022 Memo E-mail to File - Summary of August 9, 2022, Meeting with Dominion to Discuss Proposed Alternative Reqeust Recirculation Spray Pump Flow Testing (EPID L:2022-LRM-0057) ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22123A0812022-05-0303 May 2022 Acceptance Review Determination for Proposed LAR for TS Change Applicable to TSTF-359, Increase Flexibility in Mode Restraints ML22069A7192022-03-10010 March 2022 E-mail from R. Guzman to S. Sinha - Millstone Unit 3 Steam Generator Outage Conference Call ML22020A4122022-01-11011 January 2022 1/11/2022 State Consultation E-mail, R. Guzman to J. Semancik Millstone Power Station, Unit 3 Planned Issuance of Amendment to Clarify Shutdown Bank TS and Add Alternate Control Rod Position Monitoring Requirements ML21348A7392021-12-14014 December 2021 E-mail - Acceptance Review Determination Alternative Request IR-4-09 for Use Alternative Brazed Joint Assessment Methodology for Class 3 Moderate Energy Piping ML21347A9412021-12-13013 December 2021 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Safety Evaluation for Amendment No. 280 Measurement Uncertainy Recapture Power Uprate ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21297A0072021-10-19019 October 2021 E-mail from R. Guzman to S. Sinha - Acknowledgemnt of Error in SE for Millstone Power Station, Unit 3, Amendment No. 279 Addition of Analytical Methodology to the COLR for LBLOCA ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21223A3042021-08-11011 August 2021 Request for Withholding Information from Public Disclosure Proposed LAR to Add an Analytical Methodology to the COLR for a Large Break LOCA ML21200A2562021-07-19019 July 2021 7/19/2021 E-mail Pressurizer Steam Space Line Classification ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21182A2902021-07-0101 July 2021 7/1/2021 E-mail - Request for Additional Information Alternative Frequency to Supplemental Valve Position Verification Testing Requirements ML21147A2982021-05-27027 May 2021 Correction to Projected Review Completion Date, ASME Section XI Inservice Inspection Program Relief Requests, Limited Coverage Examinations, Third Period, 3rd 10-year Inservice Inspection Interval (EPID L-2020-LLR-0081 to LLR-0088) ML21141A0482021-05-18018 May 2021 5/18/2021 E-mail Proposed License Amendment Request Measurement Uncertainty Recapture Power Uprate ML21112A3082021-04-22022 April 2021 Request for Additional Information (E-mail Dated 4/22/2021) License Amendment Request for Measurement Uncertainty Recapture Power Uprate ML21105A1152021-04-15015 April 2021 Request for Additional Information (e-mail Dated 4/15/2021) Proposed LAR for Addition of Analytical Methodology to the Core Operating Limits Report for a LBLOCA ML21103A0532021-04-13013 April 2021 NRR E-mail Capture - Millstone Unit No. 3 - Acceptance Review Determination: Request for Alternative Frequency to Supplemental Valve Position Indication Verification Testing Requirement ML21084A0042021-03-25025 March 2021 3/25/2021 E-mail, Acceptance Review Determination, Proposed License Amendment Request to Revise Shutdown Bank TS Requirements and Add Alternate Control Rod Position Monitoring Requirements 2024-02-01
[Table view] Category:General FR Notice Comment Letter
MONTHYEARML0915402042009-05-29029 May 2009 Comment (1) of Raymond A. West on Behalf of Dominion Resources Services, Inc., on Draft Regulatory Guide DG-1192 - Request for Inclusion of ASME Code Case N-513-3 - (Proposed Revision 16 of Regulatory Guide 1.147, Dated October 2007) ML0911004032009-04-0808 April 2009 Comment (1) of Chris L. Funderburk, on Behalf of Dominion Resources Services, Inc., Opposing NRC Regulatory Issue Summary 2009-XX on Implementation of the New Final Rule on Protection of Safeguards Information ML0714503172007-05-23023 May 2007 Comment (2) of Robert Royce on NUREG-1021, Rev. 9, Operator Licensing Examination Standards for Power Reactors ML0714503142007-05-22022 May 2007 Comment (1) of Robert S. Royce on NUREG-1021 Draft Rev 9, Suppl. 1, Operator Licensing Examinations Standards for Power Reactors ML0509605082005-03-28028 March 2005 Comment (60) of Nancy Burton in Regard to Millstone Nuclear Power Station/Draft Environmental Impact Statement/Supplemental Comments ML0509003592005-03-22022 March 2005 Comment (58) of Nancy Burton Regarding Connecticut Coalition Against Milestone (Ccam) Concerning the Draft Environmental Impact Statement NRC Staff Has Prepared in Support of Relicensing of Millstone Nuclear Reactors Units 2 and 3 ML0509002262005-03-21021 March 2005 Comment (59) of Nancy Burton on Millstone - Notice of Intent to Sue ML0509002362005-03-11011 March 2005 Comment (56) of Larry Kaley Re Testimony ML0509002342005-03-0707 March 2005 Comment (55) of Donald W. Downes Supporting Millstone Power Station Application for Renewed Operating License ML0511502432005-03-0202 March 2005 Comment (26) of Nancy Burton on Behalf of Connecticut Coalition Against Millstone Millstone Nuclear Power Station/Draft Environmental Impact Statement ML0509605452005-03-0202 March 2005 Comment (26) of Nancy Burton on Behalf of Connecticut Coalition Against Millstone Re Draft Environmental Impact Statement for Millstone Nuclear Power Station ML0508201122005-03-0202 March 2005 Comment (48) of Lynne Krauza & Town of Southold Opposing Relicensing of Millstone ML0508200602005-03-0202 March 2005 Comment (45) of Kersten Elenteny Opposing Licensing of Millstone Nuclear Plant ML0508200552005-03-0202 March 2005 Comment (44) of Kathleen Cunningham Faraone Opposing Millstone Power Plant Relicensing ML0508200132005-03-0202 March 2005 Comment (40) of John Rooney Opposing the Reissuance of the Millstone License ML0508200702005-03-0101 March 2005 Comment (49) of Gwynn Schroeder Opposing Re Licensing of Millstone Nuclear Plant ML0508105802005-02-28028 February 2005 Comment (33) of Justin Porter Opposing Nuke Plant Relicensing of Millstone CT ML0508200722005-02-28028 February 2005 Comment (50) of Diane Lazinsky Re Draft Supplemental Environmental Impact Statement (SEIS) Millstone Power Station, Units 2 & 3 ML0508105842005-02-28028 February 2005 Comment (34) of Andrew Benners Urging NRC to Deny License Extension to Millstone ML0508105902005-02-28028 February 2005 Comment (36) of Judi Opposing Licensing of Millstone ML0508200102005-02-28028 February 2005 Comment (38) of Amy Martin Opposing Relicensing of the Millstone Nuclear Plant at Northville Beach ML0508105592005-02-27027 February 2005 Comment (31) of Constance K. Case Relicensing of Millstone Nuclear Plant ML0508105622005-02-26026 February 2005 Comment (32) of Kathleen Mcgraw Opposing Relicensing of the Millstone Nuclear Plant at Northville Beach ML0508105562005-02-26026 February 2005 Comment (30) of Sylvia Pafenyk Urging NRC to Use Common Sense and Protect Both the Public and the Environment Before Renewing Millstone License to for Another Twenty Years ML0508200492005-02-25025 February 2005 Comment (43) of Arthur Tillman Opposing Re Licensing of Millstone Nuclear Plant ML0508200662005-02-25025 February 2005 Comment (47) of Roy Macnish Opposing Relicensing of Millstone ML0508200412005-02-25025 February 2005 Comment (42) of Marie Baran Opposing Millstone Nuclear Power Plant Renew It'S License ML0506600982005-02-25025 February 2005 Comment (22) of E. S. Grecheck on Draft Supplement 22 to the Generic Environmental Impact Statement ML0508105542005-02-25025 February 2005 Comment (28) of Helga Geisler Walter Urging NRC to Deny Millstone'S Relicensing ML0508105552005-02-25025 February 2005 Comment (29) of Margie Brock Urging NRC to Deny License Extension to Millstone ML0508105532005-02-23023 February 2005 Comment (27) of Steve Levy on Draft Supplemental Impact Statement to Millstone Power Station, Units 2 and 3, NUREG-1437, Supplement 22 ML0506305542005-02-23023 February 2005 Comment (18) of Marie Domenici on Address Correction Regarding Millstone ML0505400102005-02-10010 February 2005 Comment (3) of Charlie Pillsbury and Allan Brison on Behalf of the Green Party Opposing Extension of Operating Licenses for Millstone'S Units 2 and 3 Nuclear Power Reactors in Waterford, Connecticut ML0506305432005-02-0909 February 2005 Comment (17) of John Magnesi Urging NRC to Delay Renewal of Millstone Power Station License ML0506304892005-02-0101 February 2005 Comment (16) Opposing Consideration of Extending the Opening of Millstone Facility ML0506304862005-01-31031 January 2005 Comment (15) of Maureen Swearingen & Valerie Briody Opposing Renewal of Millstone Power Plant License ML0502604652005-01-25025 January 2005 Comment (2) of Michael Hess Re Response from Comment on NRC Documents. ML0506304732005-01-17017 January 2005 Comment (13) of Barbara & Victor Dipaola Protesting Scheduling of a Vital Public Meeting on Operations at the Millstone Nuclear Plant Without Adequately Notifying Residents ML0506304842005-01-17017 January 2005 Comment (14) of Bill Garrett Urging NRC Not to Allow the Millstone Nuclear Facilities to Operate ML0506304752005-01-14014 January 2005 Comment (12) of Janice Circo-Randazzo Opposing the Relicensing of the Millstone Nuclear Power Units 2 and 3 ML0506304952005-01-14014 January 2005 Comment (10) of Arlene Farinacci Opposing Renewal of Millstone Nuclear Power Plant Unit 2 & 3 License ML0506304922005-01-11011 January 2005 Comment (9) of Barbara Doyle Opposing the Renewal of Units 2 & 3 at the Millstone Power Plant Site in CT ML0502403312005-01-11011 January 2005 Comment (1) of Lindsay Suter Opposing the Millstone Nuclear Plant Relicensing ML0506305502005-01-11011 January 2005 Comment (20) of Walter N. Parahas Opposing the Relicensing of Millstone Nuclear Power Units 2 and 3 ML0506600162005-01-11011 January 2005 Comment (21) of Joseph J. Mangano Opposing the Relicensing of Millstone Nuclear Power Units 2 and 3 ML0506304722005-01-0707 January 2005 Comment (6) of Marie Baran Disagreeing Re the Comments on the Millstone GEIS ML0506304682005-01-0606 January 2005 Comment (5) of Marie Domenici Opposing Renewal of EIS for Millstone Power Stations Units 2 and 3 Licensing ML0506304632005-01-0505 January 2005 Comment (4) of David Simpson Disagreeing Re the Comments on the Millstone GEIS ML0432804662004-11-12012 November 2004 Comment (2) of David M. Collins on Additional Information ML0432402302004-11-12012 November 2004 Comment (1) of David M. Collins on Public Comments - RIS on SCWE 2009-05-29
[Table view] |
Text
Page 1 iitisionei - renewal wisionet:iz) - renewai Hage 1
.9. . 4 1 ~-Pe c 4 -
From: 'Barbara Doyle" <badoyle@comcast.net>
To: <MillstoneEIS ©nrc.gov>
Date: Tue, Jan 11, 200511:14 AM
Subject:
renewal Hello NRC staff. I would like to not see a renewal of Units 2 & 3 at the Millstone Power Plant site in CT.
&g/VA //L3 Although I think that dry cask storage of radioactive waste at the plant is preferable to keeping the waste in a "wet" pool, the fact is that this is not a long term solution to the problem of disposing of the waste. We do not have a long term plan for dealing with the radioactive byproducts of nuclear power plants, so I would prefer that we not renew any nuclear power plant facility license.
Please keep in mind that any solution so far proposed to dealing with radioactive waste is expensive and should be considered part of the operating expense of any nuclear power plant. It is not a separate and unrelated cost to the running of such a facility and should not be presented to the public as so. I do not wish for my taxpaying dollars in any way to continue to support the license of new or renewal of any nuclear power facility.
Thank you, Barbara Doyle.
,~f
- b5
-e = / 2)-- .0 3
'97-v-9 )e-,,1e
- %iempxuvvjuuuu1. i mt-1 Pagie 1
, 4 Mail Envelope Properties (41E3FB78.C96 :0: 35990)
Subject:
renewal Creation Date: Tue, Jan 11, 2005 11:14 AM From: "Barbara Doyle" <badovye@comcast.net>
Created By: badovle @comcast.net Recipients nrc.gov OWGWPOO2.HQGWDOO1 MillstoneEIS Post Office Route OWGWPOO2.HQGWDOO 1 nrc.gov Files Size Date & Time MESSAGE 986 Tuesday, January 11, 2005 11:14 AM TEXT.htm 4793 Mime.822 7342 Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed
Subject:
No Security: Standard