Semi-Annual Fitness for Duty Program Performance Report
ML050630288
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/23/2005
From: Domonique Malone
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML050630288 (5)


Text

ue i INC Committed to Nuer rcl Palisades Nuclear Plant Operated by Nuclear Management Company, LLC February 23, 2005 10 CFR 26.71 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Semi-Annual Fitness For Dutv Proiram Performance Report In accordance with 10 CFR 26.71 (d), Nuclear Management Company, LLC, is providing the Semi-Annual Fitness For Duty Program Performance Report for the Palisades Nuclear Plant for the period of July 1, 2004, through December 31, 2004.

Enclosures 1 and 2 summarize the test results at the Palisades Nuclear Plant.

Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

Daniel J. alone Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC Enclosures (2)

CC Administrator, Region l1l, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC 27780 Blue Star Memorial Highway

  • Covert, Michigan 49043-9530 Telephone: 269.764.2000 ylhD-

ENCLOSUREI SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE

SUMMARY

July 1 through December 31, 2004

1. MANAGEMENT

SUMMARY

A. RANDOM TESTING During this reporting period, Nuclear Management Company, LLC conducted a total of 279 random tests with the following results:

Donor Group Random Tests Results Employees 137 Random testing identified one positive drug/alcohol result.

Contractors 142 Random testing identified no positive drug/alcohol results.

The positive drug/alcohol rate for 2004 indicates a stable trend for employees and contractors:

Random Tests Positive Rate Leading Substance Emnlovees CN's Emplovees CN's Cocaine THC 1994 652 144 0.2% 0.7% 1 1 1995 665 207 0.0% 0.5%

1996 629 216 0.2% 0.9% 2 1997 891 120 0.2% 0.8% 3 1998 767 208 0.5% 0.0% 3 1999 496 140 0.2% 0.0% I 2000 536 53 0.0% 0.0%

2001 438 131 0.0% 0.0%

2002 482 122 0.0% 0.0%

2003 366 156 0.3% 0.0% 1 2004 390 219 0.2% 0.0% .1 B. PRE-ACCESS TESTING A total of 925 pre-access tests were conducted during this reporting period. Six individuals were denied access based on positive test results.

Page 1 of 2

ENCLOSUREI SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE

SUMMARY

July 1 through December 31, 2004 C. FOR CAUSE TESTING Two "For Cause" tests were required during the reporting period. One test was given because of observed behavior. The results of that test were positive for alcohol. The other test was given post-accident and the results were negative.

D. FOLLOW-UP TESTING No individuals tested positive during "Follow-Up" testing.

E. APPEALS The appeal process was not initiated during this reporting period.

2. REPORTABLE EVENTS UNDER 10 CFR 26.73 During this six-month interval, Palisades Nuclear Plant did not encounter any Fitness for Duty event that required reporting under 10 CFR 26.73.

Page 2 of 2

ENCLOUSRE 2 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE DATA July 1 through December 31, 2004 Nuclear Management Company, LLC December 31, 2004 Company 6 Months Ending Palisades Nuclear Plant Location JefferV J Fletcher 269-764-2575 Contact Name Phone (include Area Code)

Cutoffs: Screen/Confirmation (ng/ml) : Appendix A to 10 CFR 26 Marijuana I Amphetamines l l Cocaine / Phencyclidine I l Opiates I Alcohol (% BAC)* l

  • Any detectable amount for situations other than random.

Long-Term Short-Term Testing Results Licensee Contractor Contractor Employees Personnel Personnel Average Number With Unescorted Access 616 N/A 395

  1. Tested #Positive #Tested #Positive #Tested #Positive Categories Pre-Access 122 1 - - 803 5 FOR Post-Accident 0 0 - - 1 0 CAUSE Observed 0 0 - - 1 1 Behavior Random 137 1 - - 142 0 Follow-up 18 0 - - 23 0 Other 0 0 - - 0 0 TOTAL 277 2 - - 970 6 Page 1 of 2

ENCLOUSRE 2 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE DATA July 1 through December 31, 2004 Breakdown of Confirmed Positive Tests for Specific Substances Amphe- Phency- Refusal Marijuana Cocaine Opiates tamines clidine Alcohol to Test 1 2 3 4 5 Licensee Employees 2 = = === _

Long-Term Contractors Short-Term Contractors 2 1 3 2 Total 1 4 1 == 3 1 2 = = l 10 I Page 2of2