North Anna Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/03/2005 09:49:04 Report 22 2
MTN-IFI
- CORRECTIVE ACTION FOR PIPE SUPPORTS Baseline Inspections 03/07/2005 03/11/2005 Identification and Resolution of Problems IP 71152 1, 2 5
EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 03/21/2005 03/25/2005 Safety System Design and Performance Capability IP 7111121 1, 2 Baseline Inspections 04/11/2005 04/15/2005 Safety System Design and Performance Capability IP 7111121 1, 2 4
PS1-RP
- RP PUBLIC BASELINE & ISFSI Other Routine 07/18/2005 07/22/2005 Operation of an Independent Spent Fuel Storage Installation at Operating Plants IP 60855.1 1, 2 Baseline Inspections 07/18/2005 07/22/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 07/18/2005 07/22/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 Baseline Inspections 07/18/2005 07/22/2005 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2 Baseline Inspections 07/18/2005 07/22/2005 Radiological Environmental Monitoring Program IP 7112203 1, 2 Baseline Inspections 07/18/2005 07/22/2005 Performance Indicator Verification IP 71151 1, 2 1
PS EP
- EP INSPECTION Baseline Inspections 08/01/2005 08/05/2005 Alert and Notification System Testing IP 7111402 1, 2 Baseline Inspections 08/01/2005 08/05/2005 Emergency Response Organization Augmentation Testing IP 7111403 1, 2 Baseline Inspections 08/01/2005 08/05/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 08/01/2005 08/05/2005 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2 Baseline Inspections 08/01/2005 08/05/2005 Performance Indicator Verification IP 71151 1, 2 1
MTN-MR
- MR EFFECTIVENESS Baseline Inspections 08/15/2005 08/19/2005 Maintenance Effectiveness IP 7111112B 1, 2 2
MTN-ISI
- U2 INSERVICE INSPECTION Baseline Inspections 10/10/2005 10/14/2005 Inservice Inspection Activities - PWR IP 7111108P 2
1 MTNTI160
- 2515/160 U-2: PZR PENETRATION NOZZLES Safety Issues 10/10/2005 10/14/2005 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01]
1 MTNSGISI
- U2 STEAM GENERATOR ISI Baseline Inspections 10/17/2005 10/21/2005 Inservice Inspection Activities - PWR IP 7111108P 2
3 EB2-TFP
- FIRE PROTECTION-TRIENNIAL PRE INSP VISIT Baseline Inspections 12/12/2005 12/16/2005 Fire Protection IP 7111105T 1, 2 2
- REQUAL INSPECTION Baseline Inspections 01/23/2006 01/27/2006 Licensed Operator Requalification Program IP 7111111B 1, 2 4
EB2-TFP
- FIRE PROTECTION-TRIENNIAL Baseline Inspections 01/23/2006 01/27/2006 Fire Protection IP 7111105T 1, 2 Baseline Inspections 02/06/2006 02/10/2006 Fire Protection IP 7111105T 1, 2 3
PS1-RP
- RP BASELINE OCCUPATIONAL WK1 Baseline Inspections 03/13/2006 03/17/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
ENclosure
North Anna Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/03/2005 09:49:04 Report 22 3
PS1-RP
- RP BASELINE OCCUPATIONAL WK1 Baseline Inspections 03/13/2006 03/17/2006 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 03/13/2006 03/17/2006 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 03/13/2006 03/17/2006 Performance Indicator Verification IP 71151 1, 2 1
MTN-ISI
- U1 INSERVICE INSPECTION Baseline Inspections 03/20/2006 03/24/2006 Inservice Inspection Activities - PWR IP 7111108P 1
1 MTNTI160
- 2515/160 U-1: PZR PENETRATION NOZZLES Safety Issues 03/20/2006 03/24/2006 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01]
1 MTNSGISI
- U1 STEAM GENERATOR ISI Baseline Inspections 03/27/2006 03/31/2006 Inservice Inspection Activities - PWR IP 7111108P 1
2 PS1-RP
- RP BASELINE OCCUPATIONAL WK2 Baseline Inspections 03/27/2006 03/31/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 03/27/2006 03/31/2006 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 03/27/2006 03/31/2006 Performance Indicator Verification IP 71151 1, 2 1
MTN-HS
- HEAT SINK Baseline Inspections 04/24/2006 04/28/2006 Heat Sink Performance IP 7111107B 1, 2 3
OL PREP
- INITIAL EXAM PREP Not Applicable 05/01/2006 05/05/2006 NORTH ANNA/EXAMS AT POWER FACILITIES V23217 1
3 OL EXAM
- INITIAL EXAM WEEK 1 Not Applicable 05/22/2006 05/26/2006 NORTH ANNA/EXAMS AT POWER FACILITIES V23217 1
3 OL EXAM
- INITIAL EXAM WEEK 2 Not Applicable 06/05/2006 06/09/2006 NORTH ANNA/EXAMS AT POWER FACILITIES V23217 1
3 EB1-MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 06/26/2006 06/30/2006 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 06/26/2006 06/30/2006 Permanent Plant Modifications IP 7111117B 1, 2 3
PS2-EP
- EP EXERCISE Baseline Inspections 08/22/2006 08/26/2006 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 08/22/2006 08/26/2006 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 08/22/2006 08/26/2006 Performance Indicator Verification IP 71151 1, 2 This report does not include INPO and OUTAGE activities.