ML050610758

From kanterella
Jump to navigation Jump to search
Inspection / Activity Plan, 03/01/2005 - 09/30/2006
ML050610758
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 03/02/2005
From:
NRC/RGN-II/DRP/RPB5
To:
Virginia Electric & Power Co (VEPCO)
Shared Package
ML050610756 List:
References
IR-05-001
Download: ML050610758 (2)


Text

Page 1 of 2 North Anna 03/03/2005 09:49:04 Inspection / Activity Plan Report 22 03/01/2005 - 09/30/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type MTN-IFI - CORRECTIVE ACTION FOR PIPE SUPPORTS 2 1, 2 IP 71152 Identification and Resolution of Problems 03/07/2005 03/11/2005 Baseline Inspections EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY 5 1, 2 IP 7111121 Safety System Design and Performance Capability 03/21/2005 03/25/2005 Baseline Inspections 1, 2 IP 7111121 Safety System Design and Performance Capability 04/11/2005 04/15/2005 Baseline Inspections PS1-RP - RP PUBLIC BASELINE & ISFSI 4 1, 2 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 07/18/2005 07/22/2005 Other Routine 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 07/18/2005 07/22/2005 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 07/18/2005 07/22/2005 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 07/18/2005 07/22/2005 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program 07/18/2005 07/22/2005 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 07/18/2005 07/22/2005 Baseline Inspections PS EP - EP INSPECTION 1 1, 2 IP 7111402 Alert and Notification System Testing 08/01/2005 08/05/2005 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 08/01/2005 08/05/2005 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 08/01/2005 08/05/2005 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 08/01/2005 08/05/2005 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/01/2005 08/05/2005 Baseline Inspections MTN-MR - MR EFFECTIVENESS 1 1, 2 IP 7111112B Maintenance Effectiveness 08/15/2005 08/19/2005 Baseline Inspections MTN-ISI - U2 INSERVICE INSPECTION 2 2 IP 7111108P Inservice Inspection Activities - PWR 10/10/2005 10/14/2005 Baseline Inspections MTNTI160 - 2515/160 U-2: PZR PENETRATION NOZZLES 1 2 IP 2515/160 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01] 10/10/2005 10/14/2005 Safety Issues MTNSGISI - U2 STEAM GENERATOR ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 10/17/2005 10/21/2005 Baseline Inspections EB2-TFP - FIRE PROTECTION-TRIENNIAL PRE INSP VISIT 3 1, 2 IP 7111105T Fire Protection 12/12/2005 12/16/2005 Baseline Inspections OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 01/23/2006 01/27/2006 Baseline Inspections EB2-TFP - FIRE PROTECTION-TRIENNIAL 4 1, 2 IP 7111105T Fire Protection 01/23/2006 01/27/2006 Baseline Inspections 1, 2 IP 7111105T Fire Protection 02/06/2006 02/10/2006 Baseline Inspections PS1-RP - RP BASELINE OCCUPATIONAL WK1 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/13/2006 03/17/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

ENclosure

Page 2 of 2 North Anna 03/03/2005 09:49:04 Inspection / Activity Plan Report 22 03/01/2005 - 09/30/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS1-RP - RP BASELINE OCCUPATIONAL WK1 3 1, 2 IP 7112102 ALARA Planning and Controls 03/13/2006 03/17/2006 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 03/13/2006 03/17/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/13/2006 03/17/2006 Baseline Inspections MTN-ISI - U1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 03/20/2006 03/24/2006 Baseline Inspections MTNTI160 - 2515/160 U-1: PZR PENETRATION NOZZLES 1 1 IP 2515/160 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01] 03/20/2006 03/24/2006 Safety Issues MTNSGISI - U1 STEAM GENERATOR ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 03/27/2006 03/31/2006 Baseline Inspections PS1-RP - RP BASELINE OCCUPATIONAL WK2 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/27/2006 03/31/2006 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 03/27/2006 03/31/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 03/27/2006 03/31/2006 Baseline Inspections MTN-HS - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 04/24/2006 04/28/2006 Baseline Inspections OL PREP - INITIAL EXAM PREP 3 1 V23217 NORTH ANNA/EXAMS AT POWER FACILITIES 05/01/2006 05/05/2006 Not Applicable OL EXAM - INITIAL EXAM WEEK 1 3 1 V23217 NORTH ANNA/EXAMS AT POWER FACILITIES 05/22/2006 05/26/2006 Not Applicable OL EXAM - INITIAL EXAM WEEK 2 3 1 V23217 NORTH ANNA/EXAMS AT POWER FACILITIES 06/05/2006 06/09/2006 Not Applicable EB1-MODS - MODIFICATIONS/10CFR50.59 3 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 06/26/2006 06/30/2006 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 06/26/2006 06/30/2006 Baseline Inspections PS2-EP - EP EXERCISE 3 1, 2 IP 7111401 Exercise Evaluation 08/22/2006 08/26/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 08/22/2006 08/26/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/22/2006 08/26/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.