Inspection / Activity Plan, 03/01/2005 - 09/30/2006
ML050610758
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 03/02/2005
From:
NRC/RGN-II/DRP/RPB5
To:
Virginia Electric & Power Co (VEPCO)
Shared Package
ML050610756 List:
References
IR-05-001
Download: ML050610758 (2)


Text

North Anna Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/03/2005 09:49:04 Report 22 2

MTN-IFI

- CORRECTIVE ACTION FOR PIPE SUPPORTS Baseline Inspections 03/07/2005 03/11/2005 Identification and Resolution of Problems IP 71152 1, 2 5

EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 03/21/2005 03/25/2005 Safety System Design and Performance Capability IP 7111121 1, 2 Baseline Inspections 04/11/2005 04/15/2005 Safety System Design and Performance Capability IP 7111121 1, 2 4

PS1-RP

- RP PUBLIC BASELINE & ISFSI Other Routine 07/18/2005 07/22/2005 Operation of an Independent Spent Fuel Storage Installation at Operating Plants IP 60855.1 1, 2 Baseline Inspections 07/18/2005 07/22/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 07/18/2005 07/22/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 Baseline Inspections 07/18/2005 07/22/2005 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2 Baseline Inspections 07/18/2005 07/22/2005 Radiological Environmental Monitoring Program IP 7112203 1, 2 Baseline Inspections 07/18/2005 07/22/2005 Performance Indicator Verification IP 71151 1, 2 1

PS EP

- EP INSPECTION Baseline Inspections 08/01/2005 08/05/2005 Alert and Notification System Testing IP 7111402 1, 2 Baseline Inspections 08/01/2005 08/05/2005 Emergency Response Organization Augmentation Testing IP 7111403 1, 2 Baseline Inspections 08/01/2005 08/05/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 08/01/2005 08/05/2005 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2 Baseline Inspections 08/01/2005 08/05/2005 Performance Indicator Verification IP 71151 1, 2 1

MTN-MR

- MR EFFECTIVENESS Baseline Inspections 08/15/2005 08/19/2005 Maintenance Effectiveness IP 7111112B 1, 2 2

MTN-ISI

- U2 INSERVICE INSPECTION Baseline Inspections 10/10/2005 10/14/2005 Inservice Inspection Activities - PWR IP 7111108P 2

1 MTNTI160

- 2515/160 U-2: PZR PENETRATION NOZZLES Safety Issues 10/10/2005 10/14/2005 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01]

IP 2515/160 2

1 MTNSGISI

- U2 STEAM GENERATOR ISI Baseline Inspections 10/17/2005 10/21/2005 Inservice Inspection Activities - PWR IP 7111108P 2

3 EB2-TFP

- FIRE PROTECTION-TRIENNIAL PRE INSP VISIT Baseline Inspections 12/12/2005 12/16/2005 Fire Protection IP 7111105T 1, 2 2

OL RQ

- REQUAL INSPECTION Baseline Inspections 01/23/2006 01/27/2006 Licensed Operator Requalification Program IP 7111111B 1, 2 4

EB2-TFP

- FIRE PROTECTION-TRIENNIAL Baseline Inspections 01/23/2006 01/27/2006 Fire Protection IP 7111105T 1, 2 Baseline Inspections 02/06/2006 02/10/2006 Fire Protection IP 7111105T 1, 2 3

PS1-RP

- RP BASELINE OCCUPATIONAL WK1 Baseline Inspections 03/13/2006 03/17/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

ENclosure

North Anna Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/03/2005 09:49:04 Report 22 3

PS1-RP

- RP BASELINE OCCUPATIONAL WK1 Baseline Inspections 03/13/2006 03/17/2006 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 03/13/2006 03/17/2006 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 03/13/2006 03/17/2006 Performance Indicator Verification IP 71151 1, 2 1

MTN-ISI

- U1 INSERVICE INSPECTION Baseline Inspections 03/20/2006 03/24/2006 Inservice Inspection Activities - PWR IP 7111108P 1

1 MTNTI160

- 2515/160 U-1: PZR PENETRATION NOZZLES Safety Issues 03/20/2006 03/24/2006 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01]

IP 2515/160 1

1 MTNSGISI

- U1 STEAM GENERATOR ISI Baseline Inspections 03/27/2006 03/31/2006 Inservice Inspection Activities - PWR IP 7111108P 1

2 PS1-RP

- RP BASELINE OCCUPATIONAL WK2 Baseline Inspections 03/27/2006 03/31/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 03/27/2006 03/31/2006 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 03/27/2006 03/31/2006 Performance Indicator Verification IP 71151 1, 2 1

MTN-HS

- HEAT SINK Baseline Inspections 04/24/2006 04/28/2006 Heat Sink Performance IP 7111107B 1, 2 3

OL PREP

- INITIAL EXAM PREP Not Applicable 05/01/2006 05/05/2006 NORTH ANNA/EXAMS AT POWER FACILITIES V23217 1

3 OL EXAM

- INITIAL EXAM WEEK 1 Not Applicable 05/22/2006 05/26/2006 NORTH ANNA/EXAMS AT POWER FACILITIES V23217 1

3 OL EXAM

- INITIAL EXAM WEEK 2 Not Applicable 06/05/2006 06/09/2006 NORTH ANNA/EXAMS AT POWER FACILITIES V23217 1

3 EB1-MODS

- MODIFICATIONS/10CFR50.59 Baseline Inspections 06/26/2006 06/30/2006 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 06/26/2006 06/30/2006 Permanent Plant Modifications IP 7111117B 1, 2 3

PS2-EP

- EP EXERCISE Baseline Inspections 08/22/2006 08/26/2006 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 08/22/2006 08/26/2006 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 08/22/2006 08/26/2006 Performance Indicator Verification IP 71151 1, 2 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.