ML050610752

From kanterella
Jump to navigation Jump to search
Inspection / Activity Plan, 03/01/2005 - 09/30/2006
ML050610752
Person / Time
Site: Surry, 07200002  
(DPR-032, DPR-037, SNM-2501)
Issue date: 03/03/2005
From:
Region 2 Administrator
To:
Virginia Electric & Power Co (VEPCO)
Shared Package
ML050610750 List:
References
IR-05-001
Download: ML050610752 (2)


Text

Surry Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/03/2005 09:46:48 Report 22 2

OL RQ

- REQUAL INSPECTION Baseline Inspections 03/21/2005 03/25/2005 Licensed Operator Requalification Program IP 7111111B 1, 2 2

PS1-RP

- RP OCCUPATIONAL BASELINE & ISFSI WK-1 Other Routine 04/25/2005 04/29/2005 Operation of an Independent Spent Fuel Storage Installation at Operating Plants IP 60855.1 1, 2 Baseline Inspections 04/25/2005 04/29/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 04/25/2005 04/29/2005 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 04/25/2005 04/29/2005 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 04/25/2005 04/29/2005 Performance Indicator Verification IP 71151 1, 2 1

MTN-ISI

- U2 INSERVICE INSPECTION Baseline Inspections 05/02/2005 05/06/2005 Inservice Inspection Activities - PWR IP 7111108P 2

3 PS-RP

- RP OCCUPATIONAL BASELINE & ISFSI WK-2 Other Routine 05/09/2005 05/13/2005 Operation of an Independent Spent Fuel Storage Installation at Operating Plants IP 60855.1 1, 2 Baseline Inspections 05/09/2005 05/13/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 05/09/2005 05/13/2005 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 05/09/2005 05/13/2005 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 05/09/2005 05/13/2005 Performance Indicator Verification IP 71151 1, 2 1

MTNSGISI

- STEAM GENERATOR ISI Baseline Inspections 05/16/2005 05/20/2005 Inservice Inspection Activities - PWR IP 7111108P 2

4 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 08/08/2005 08/12/2005 Identification and Resolution of Problems IP 71152B 1, 2 4

PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 08/22/2005 08/26/2005 Identification and Resolution of Problems IP 71152B 1, 2 4

EB1-MODS

- MODIFICATIONS/10CFR50.59 Baseline Inspections 09/19/2005 09/23/2005 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 09/19/2005 09/23/2005 Permanent Plant Modifications IP 7111117B 1, 2 2

PS EP

- EP EXERCISE Baseline Inspections 12/05/2005 12/09/2005 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 12/05/2005 12/09/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 12/05/2005 12/09/2005 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2 Baseline Inspections 12/05/2005 12/09/2005 Performance Indicator Verification IP 71151 1, 2 Baseline Inspections 12/05/2005 12/09/2005 Performance Indicator Verification IP 71151 1, 2 5

EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 12/12/2005 12/16/2005 Safety System Design and Performance Capability IP 7111121 1, 2 4

OL PREP

- INITIAL EXAM PREP Not Applicable 01/09/2006 01/13/2006 SURRY/EXAMS AT POWER FACILITIES V23210 1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Surry Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/03/2005 09:46:48 Report 22 5

EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 01/09/2006 01/13/2006 Safety System Design and Performance Capability IP 7111121 1, 2 Baseline Inspections 01/23/2006 01/27/2006 Safety System Design and Performance Capability IP 7111121 1, 2 4

OL EXAM

- EXAM WEEK 1 Not Applicable 01/23/2006 01/27/2006 SURRY/EXAMS AT POWER FACILITIES V23210 1

4 OL EXAM

- EXAM WEEK 2 Not Applicable 02/06/2006 02/10/2006 SURRY/EXAMS AT POWER FACILITIES V23210 1

1 MTN-ISI

- U1 INSERVICE INSPECTION Baseline Inspections 05/01/2006 05/05/2006 Inservice Inspection Activities - PWR IP 7111108P 1

1 MTNSGISI

- U1 STEAM GENERATOR ISI Baseline Inspections 05/08/2006 05/12/2006 Inservice Inspection Activities - PWR IP 7111108P 1

4 EB2-TFP

- TRIENNIAL FP PRE-INSPECTION VISIT Baseline Inspections 05/16/2006 05/18/2006 Fire Protection IP 7111105T 1, 2 4

EB2-TFP

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 06/12/2006 06/16/2006 Fire Protection IP 7111105T 1, 2 3

PS1-RP

- RP BASELINE PUBLIC Safety Issues 06/19/2006 06/23/2006 Expanded Pilot Force-on-Force Exercise Evaluation IP 2515/151 1, 2 Baseline Inspections 06/19/2006 06/23/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 06/19/2006 06/23/2006 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 Baseline Inspections 06/19/2006 06/23/2006 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2 Baseline Inspections 06/19/2006 06/23/2006 Radiological Environmental Monitoring Program IP 7112203 1, 2 Baseline Inspections 06/19/2006 06/23/2006 Performance Indicator Verification IP 71151 1, 2 4

EB2-TFP

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 06/26/2006 06/30/2006 Fire Protection IP 7111105T 1, 2 1

MTN-MR

- MR EFFECTIVENESS Baseline Inspections 08/28/2006 09/01/2006 Maintenance Effectiveness IP 7111112B 1, 2 1

MTN-HS

- HEAT SINK Baseline Inspections 09/18/2006 09/22/2006 Heat Sink Performance IP 7111107B 1, 2 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.