Inspection / Activity Plan, 03-01/2005 - 09/30/2006
ML050610619
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 03/02/2005
From:
NRC/RGN-II
To:
Tennessee Valley Authority
Shared Package
ML050610599 List:
References
IR-05-001
Download: ML050610619 (2)


Text

Watts Bar Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2005 11:55:34 Report 22 6

PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 02/28/2005 03/04/2005 Identification and Resolution of Problems IP 71152B 1

1 MTN-ISI

- INSERVICE INSPECTION Baseline Inspections 02/28/2005 03/04/2005 Inservice Inspection Activities - PWR IP 7111108P 1

2 PSB1 RP

- INSPECTION WEEK 1 Baseline Inspections 02/28/2005 03/04/2005 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 02/28/2005 03/04/2005 ALARA Planning and Controls IP 7112102 1

Baseline Inspections 02/28/2005 03/04/2005 Radioactive Material Processing and Transportation IP 7112202 1

Baseline Inspections 02/28/2005 03/04/2005 Performance Indicator Verification IP 71151 1

1 MTNTI160

- 2515/160 U-1: PZR PENTRATION NOZZLES Safety Issues 03/03/2005 03/07/2005 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01]

IP 2515/160 1

2 MTNSGISI

- STEAM GENERATOR ISI Baseline Inspections 03/08/2005 03/11/2005 Inservice Inspection Activities - PWR IP 7111108P 1

3 PSB1 RP

- INSPECTION WEEK 2 Baseline Inspections 03/14/2005 03/18/2005 Access Control to Radiologically Significant Areas IP 7112101 1

Baseline Inspections 03/14/2005 03/18/2005 ALARA Planning and Controls IP 7112102 1

Baseline Inspections 03/14/2005 03/18/2005 Radioactive Material Processing and Transportation IP 7112202 1

Baseline Inspections 03/14/2005 03/18/2005 Performance Indicator Verification IP 71151 1

4 EB1-MODS

- MODIFICATIONS/10CFR50.59 Baseline Inspections 05/09/2005 05/13/2005 Evaluation of Changes, Tests, or Experiments IP 7111102 1

Baseline Inspections 05/09/2005 05/13/2005 Permanent Plant Modifications IP 7111117B 1

1 EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 06/13/2005 06/17/2005 Safety System Design and Performance Capability IP 7111121 1

6 EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 07/11/2005 07/15/2005 Safety System Design and Performance Capability IP 7111121 1

Baseline Inspections 07/25/2005 07/29/2005 Safety System Design and Performance Capability IP 7111121 1

2 MTN-MR

- MAINT EFFECTIVENESS Baseline Inspections 10/23/2005 10/27/2005 Maintenance Effectiveness IP 7111112B 1

2 EP

- EMERGENCY EXERCISE Baseline Inspections 10/31/2005 11/04/2005 Exercise Evaluation IP 7111401 1

Baseline Inspections 10/31/2005 11/04/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 1

Baseline Inspections 10/31/2005 11/04/2005 Performance Indicator Verification IP 71151 1

3 PS1-RP

- RP BASELINE PUBLIC Baseline Inspections 05/01/2006 05/05/2006 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1

Baseline Inspections 05/01/2006 05/05/2006 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Watts Bar Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2005 11:55:34 Report 22 3

PS1-RP

- RP BASELINE PUBLIC Baseline Inspections 05/01/2006 05/05/2006 Radiological Environmental Monitoring Program IP 7112203 1

Baseline Inspections 05/01/2006 05/05/2006 Performance Indicator Verification IP 71151 1

3 OL PREP

- INITIAL EXAM PREP Not Applicable 08/07/2006 08/11/2006 WATTS BAR/EXAM AT POWER FACILITIES V23241 1

1 PS2-EP

- EP INSP Baseline Inspections 08/28/2006 09/02/2006 Alert and Notification System Testing IP 7111402 1

Baseline Inspections 08/28/2006 09/02/2006 Emergency Response Organization Augmentation Testing IP 7111403 1

Baseline Inspections 08/28/2006 09/02/2006 Emergency Action Level and Emergency Plan Changes IP 7111404 1

Baseline Inspections 08/28/2006 09/02/2006 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1

Baseline Inspections 08/28/2006 09/02/2006 Performance Indicator Verification IP 71151 1

3 OL EXAM

- INITIAL EXAM Not Applicable 08/28/2006 09/08/2006 WATTS BAR/EXAM AT POWER FACILITIES V23241 1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.