ML050610514

From kanterella
Jump to navigation Jump to search
Inspection/Activity Plan, 03/01/05 - 09/30/06
ML050610514
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/02/2005
From: Mccree V
Division Reactor Projects II
To: Stall J
Florida Power & Light Co
Shared Package
ML050610500 List:
References
IR-05-001
Download: ML050610514 (2)


Text

Saint Lucie Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2005 14:40:59 Report 22 4

EB1-MODS

- MODIFICATIONS/10CFR50.59 Baseline Inspections 04/04/2005 04/08/2005 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 04/04/2005 04/08/2005 Permanent Plant Modifications IP 7111117B 1, 2 2

EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 05/09/2005 05/11/2005 Safety System Design and Performance Capability IP 7111121 1, 2 6

EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 06/13/2005 06/17/2005 Safety System Design and Performance Capability IP 7111121 1, 2 Baseline Inspections 06/20/2005 06/24/2005 Safety System Design and Performance Capability IP 7111121 1, 2 2

OL RQ

- REQUAL INSPECTION Baseline Inspections 07/18/2005 07/22/2005 Licensed Operator Requalification Program IP 7111111B 1, 2 4

MTN-HEAD - REACTOR HEAD & PZR REPLACEMENT Other Routine 09/19/2005 09/23/2005 Reactor Vessel Head Replacement Inspection IP 71007 1

Other Routine 10/31/2005 11/04/2005 Reactor Vessel Head Replacement Inspection IP 71007 1

Other Routine 11/14/2005 11/18/2005 Reactor Vessel Head Replacement Inspection IP 71007 1

2 MTN-ISI

- U1 INSERVICE INSPECTION Baseline Inspections 10/10/2005 10/14/2005 Inservice Inspection Activities - PWR IP 7111108P 1

2 MTNSGISI

- STEAM GENERATOR ISI Baseline Inspections 10/17/2005 10/21/2005 Inservice Inspection Activities - PWR IP 7111108P 1

3 PS-RP

- RP OCCUPATIONAL BASELINE & RX HEAD WK-1 Other Routine 10/17/2005 10/21/2005 Reactor Vessel Head Replacement Inspection IP 71007 1, 2 Baseline Inspections 10/17/2005 10/21/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 10/17/2005 10/21/2005 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 10/17/2005 10/21/2005 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 10/17/2005 10/21/2005 Performance Indicator Verification IP 71151 1, 2 3

PS1-RP

- RP OCCUPATIONAL BASELINE & RX HEAD WK-2 Other Routine 11/14/2005 11/18/2005 Reactor Vessel Head Replacement Inspection IP 71007 1, 2 Baseline Inspections 11/14/2005 11/18/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 11/14/2005 11/18/2005 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 11/14/2005 11/18/2005 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 11/14/2005 11/18/2005 Performance Indicator Verification IP 71151 1, 2 2

MTN-MR

- MR EFFECTIVENESS Baseline Inspections 01/30/2006 02/03/2006 Maintenance Effectiveness IP 7111112B 1, 2 3

PS2-EP

- EP EXERCISE Baseline Inspections 02/13/2006 02/17/2006 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 02/13/2006 02/17/2006 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Saint Lucie Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2005 14:40:59 Report 22 3

PS2-EP

- EP EXERCISE Baseline Inspections 02/13/2006 02/17/2006 Performance Indicator Verification IP 71151 1, 2 3

OL PREP

- INITIAL EXAM PREP Not Applicable 02/27/2006 03/03/2006 ST. LUCIE/EXAMS AT POWER FACILITIES V23220 1

3 OL EXAM

- INITIAL EXAM Not Applicable 03/20/2006 03/31/2006 ST. LUCIE/EXAMS AT POWER FACILITIES V23220 1

1 MTN-ISI

- U2 INSERVICE INSPECTION Baseline Inspections 05/01/2006 05/05/2006 Inservice Inspection Activities - PWR IP 7111108P 2

1 MTNSGISI

- U2 STEAM GENERATOR ISI Baseline Inspections 05/08/2006 05/12/2006 Inservice Inspection Activities - PWR IP 7111108P 2

4 DRP

- PI&R Baseline Inspections 06/12/2006 06/16/2006 Identification and Resolution of Problems IP 71152 1, 2 Baseline Inspections 06/26/2006 06/30/2006 Identification and Resolution of Problems IP 71152B 1, 2 4

EB2-TFP

- TRIENNIAL FP PRE-INSPECTION VISIT Baseline Inspections 09/05/2006 09/07/2006 Fire Protection IP 7111105T 1, 2 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.