Saint Lucie Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2005 14:40:59 Report 22 4
EB1-MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 04/04/2005 04/08/2005 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 04/04/2005 04/08/2005 Permanent Plant Modifications IP 7111117B 1, 2 2
EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 05/09/2005 05/11/2005 Safety System Design and Performance Capability IP 7111121 1, 2 6
EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 06/13/2005 06/17/2005 Safety System Design and Performance Capability IP 7111121 1, 2 Baseline Inspections 06/20/2005 06/24/2005 Safety System Design and Performance Capability IP 7111121 1, 2 2
- REQUAL INSPECTION Baseline Inspections 07/18/2005 07/22/2005 Licensed Operator Requalification Program IP 7111111B 1, 2 4
MTN-HEAD - REACTOR HEAD & PZR REPLACEMENT Other Routine 09/19/2005 09/23/2005 Reactor Vessel Head Replacement Inspection IP 71007 1
Other Routine 10/31/2005 11/04/2005 Reactor Vessel Head Replacement Inspection IP 71007 1
Other Routine 11/14/2005 11/18/2005 Reactor Vessel Head Replacement Inspection IP 71007 1
2 MTN-ISI
- U1 INSERVICE INSPECTION Baseline Inspections 10/10/2005 10/14/2005 Inservice Inspection Activities - PWR IP 7111108P 1
2 MTNSGISI
- STEAM GENERATOR ISI Baseline Inspections 10/17/2005 10/21/2005 Inservice Inspection Activities - PWR IP 7111108P 1
3 PS-RP
- RP OCCUPATIONAL BASELINE & RX HEAD WK-1 Other Routine 10/17/2005 10/21/2005 Reactor Vessel Head Replacement Inspection IP 71007 1, 2 Baseline Inspections 10/17/2005 10/21/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 10/17/2005 10/21/2005 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 10/17/2005 10/21/2005 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 10/17/2005 10/21/2005 Performance Indicator Verification IP 71151 1, 2 3
PS1-RP
- RP OCCUPATIONAL BASELINE & RX HEAD WK-2 Other Routine 11/14/2005 11/18/2005 Reactor Vessel Head Replacement Inspection IP 71007 1, 2 Baseline Inspections 11/14/2005 11/18/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 11/14/2005 11/18/2005 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 11/14/2005 11/18/2005 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 11/14/2005 11/18/2005 Performance Indicator Verification IP 71151 1, 2 2
MTN-MR
- MR EFFECTIVENESS Baseline Inspections 01/30/2006 02/03/2006 Maintenance Effectiveness IP 7111112B 1, 2 3
PS2-EP
- EP EXERCISE Baseline Inspections 02/13/2006 02/17/2006 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 02/13/2006 02/17/2006 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Saint Lucie Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2005 14:40:59 Report 22 3
PS2-EP
- EP EXERCISE Baseline Inspections 02/13/2006 02/17/2006 Performance Indicator Verification IP 71151 1, 2 3
OL PREP
- INITIAL EXAM PREP Not Applicable 02/27/2006 03/03/2006 ST. LUCIE/EXAMS AT POWER FACILITIES V23220 1
3 OL EXAM
- INITIAL EXAM Not Applicable 03/20/2006 03/31/2006 ST. LUCIE/EXAMS AT POWER FACILITIES V23220 1
1 MTN-ISI
- U2 INSERVICE INSPECTION Baseline Inspections 05/01/2006 05/05/2006 Inservice Inspection Activities - PWR IP 7111108P 2
1 MTNSGISI
- U2 STEAM GENERATOR ISI Baseline Inspections 05/08/2006 05/12/2006 Inservice Inspection Activities - PWR IP 7111108P 2
4 DRP
- PI&R Baseline Inspections 06/12/2006 06/16/2006 Identification and Resolution of Problems IP 71152 1, 2 Baseline Inspections 06/26/2006 06/30/2006 Identification and Resolution of Problems IP 71152B 1, 2 4
EB2-TFP
- TRIENNIAL FP PRE-INSPECTION VISIT Baseline Inspections 09/05/2006 09/07/2006 Fire Protection IP 7111105T 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.