tC FENOC FrstEnergy Nuclear Operating Company Perry Nuclear Power Plant 10 Center Road Perry Ohio 44081 Richard Anderson Vice President-Nuclear 440-280-5579 Fax: 440-280-8029 February 15, 2005 PY-CEINRR-2864L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the January 2005 Monthly Operating Report for Perry Unit 1. Page I is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector q
OPERATING DATA REPORT UNIT:
Perry DATE:
217/05 1.
2.
3.
4.
5.
6.
7.
Docket: 50-440 Unit Name:
Perry Nuclear Power Plant Reporting Period January 2005 Utility
Contact:
T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):
Maximum Dependable Capacity (Net MWe):
1260 1235 8.
9.
10.
11.
This Month Hours Reactor was Critical 148.3 Hours Generator On-Line 121.2 Unit Reserve Shutdown Hours 0.0 Net Electrical Energy (MWeH)
_121586.0 Yr-to-Date 148.3 121.2 0.0 121.586.2 Cumulative __ __
120.817.7 118.012.5 0.0 135.477.343.0 Page 1
II UNIT SHUTDOWNS REPORT MONTH - JANUARY 2005 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 02/07/05 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.
Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1
Hours 2
.3 05-01 1/6/05 F
622.8
.'A 2
On 1/6/05 at 0112 a manual scram iwas inserted due to the downshift of the Reactor Recirculation Pumps, along with the subsequent tripping offline of the Reactor Recirculation Pump A.
SUMMARY
- The Perry Nuclear Power completed power ascension on 1/5/05 at 0117. A manual scram was inserted on 1/6/05 at 0112. Plant startup was in progress at months end
- 1. TYPE:
- 2. REASON:
- 3. METHOD:
F: Forced A - Equipment Failure (explain) 1 - Manual S: Scheduled B-Maintenance or Test 2-Manual Scram C - Refueling 3 -Automatic Scram D - Regulatory 4-Continuation E - Operating Training &
5 - Other License Examination F - Administrative G - Operational Error (explain)
H -Other (explain)
P Page 2