ML050590349

From kanterella
Jump to navigation Jump to search
NRC Section Chief Change - Effective Immediately Mr. A. Howe Is Section Chief for PDIV-1
ML050590349
Person / Time
Site: River Bend Entergy icon.png
Issue date: 02/14/2005
From: Berkow H
NRC/NRR/DLPM/LPD4
To: Hinnenkamp P
Entergy Operations
Webb M, NRR/DLPM, 415-1347
References
Download: ML050590349 (3)


Text

February 14, 2005 Mr. Paul D. Hinnenkamp Vice President - Operations Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775

SUBJECT:

CHANGE OF NRC SECTION CHIEF FOR RIVER BEND STATION

Dear Mr. Hinnenkamp:

This is to inform you that effective immediately, Mr. Allen G. Howe will replace Mr. Robert A. Gramm as Chief, Section 1, Project Directorate IV. Mr. Howe may be reached by telephone at (301) 415-1302 or electronic mail at agh1@nrc.gov.

Sincerely,

/RA/

Herbert N. Berkow, Director Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-458 cc: See next page

February 14, 2005 Mr. Paul D. Hinnenkamp Vice President - Operations Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775

SUBJECT:

CHANGE OF NRC SECTION CHIEF FOR RIVER BEND STATION

Dear Mr. Hinnenkamp:

This is to inform you that effective immediately, Mr. Allen G. Howe will replace Mr. Robert A. Gramm as Chief, Section 1, Project Directorate IV. Mr. Howe may be reached by telephone at (301) 415-1302 or electronic mail at agh1@nrc.gov.

Sincerely,

/RA/

Herbert N. Berkow, Director Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-458 cc: See next page DISTRIBUTION:

PUBLIC RidsNrrPMMWebb PDIV-1 R/F RidsOgcRp RidsNrrDlpmLpdiv (HBerkow) RidsAcrsAcnwMailCenter RidsNrrDlpmLpdiv1 (AHowe) LBerry RidsNrrLADJohnson RidsRgn4MailCenter (AHowell)

Accession No.: ML050590349 OFFICE PM/PDIV-1 LA/PDIV-1 SC/PDIV-1 D/PDIV NAME MWebb DJohnson AHowe HBerkow DATE 2/7/05 2/4/05 2/7/05 2/8/05 OFFICIAL RECORD COPY

River Bend Station cc:

Winston & Strawn General Manager - Plant Operations 1400 L Street, N.W. Entergy Operations, Inc.

Washington, DC 20005-3502 River Bend Station 5485 US Highway 61N Manager - Licensing St. Francisville, LA 70775 Entergy Operations, Inc.

River Bend Station Director - Nuclear Safety 5485 US Highway 61N Entergy Operations, Inc.

St. Francisville, LA 70775 River Bend Station 5485 US Highway 61N Senior Resident Inspector St. Francisville, LA 70775 P. O. Box 1050 St. Francisville, LA 70775 Vice President - Operations Support Entergy Operations, Inc.

President of West Feliciana P. O. Box 31995 Police Jury Jackson, MS 39286-1995 P. O. Box 1921 St. Francisville, LA 70775 Attorney General State of Louisiana Regional Administrator, Region IV P. O. Box 94095 U.S. Nuclear Regulatory Commission Baton Rouge, LA 70804-9095 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Brian Almon Public Utility Commission Ms. H. Anne Plettinger William B. Travis Building 3456 Villa Rose Drive P. O. Box 13326 Baton Rouge, LA 70806 1701 North Congress Avenue Austin, Texas 78701-3326 Mr. Michael E. Henry, State Liaison Officer Department of Environmental Quality Permits Division P.O. Box 4313 Baton Rouge, Louisiana 70821-4313 Wise, Carter, Child & Caraway P. O. Box 651 Jackson, MS 39205 Executive Vice President and Chief Operating Officer Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 June 2004