February 25, 2005 Mr. Mano K. Nazar Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION

Dear Mr. Nazar:

By letter dated October 31, 2003, Indiana Michigan Power Company, (I&M or the applicant) submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54), to renew the operating licenses for Donald C. Cook Nuclear Plant (CNP),

Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application (LRA) and has identified, in the enclosure, an area where additional information is needed to complete the review.

This RAI was discussed with your staff, Richard Grumbir, and a mutually agreeable date for this response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-4053 or e-mail JGR@nrc.gov.

Sincerely,

/RA/

Jonathan Rowley, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-315 and 50-316

Enclosure:

As stated cc w/encls: See next page

February 25, 2005 Mr. Mano K. Nazar Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION

Dear Mr. Nazar:

By letter dated October 31, 2003, Indiana Michigan Power Company, (I&M or the applicant) submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54), to renew the operating licenses for Donald C. Cook Nuclear Plant (CNP),

Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application (LRA) and has identified, in the enclosure, an area where additional information is needed to complete the review.

This RAI was discussed with your staff, Richard Grumbir, and a mutually agreeable date for this response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-4053 or e-mail JGR@nrc.gov.

Sincerely,

/RA/

Jonathan Rowley, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos. 50-315 and 50-316

Enclosure:

As stated cc w/encls: See next page DISTRIBUTION: See next page Adams Accession No.: ML050560152 Document Name: E:\\Filenet\\ML050560152.wpd OFFICE PM:RLEP LA:RLEP SC:RLEP NAME JRowley SLee DATE 02 /25/05 02/25/05 02/25/05 OFFICIAL RECORD COPY Donald C. Cook Nuclear Plant, Units 1 and 2

cc:

Regional Administrator, Region III U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4351 Township Supervisor Lake Township Hall P.O. Box 818 Bridgman, MI 49106 U.S. Nuclear Regulatory Commission Resident Inspectors Office 7700 Red Arrow Highway Stevensville, MI 49127 David W. Jenkins, Esquire Indiana Michigan Power Company One Cook Place Bridgman, MI 49106 Mayor, City of Bridgman P.O. Box 366 Bridgman, MI 49106 Special Assistant to the Governor Room 1 - State Capitol Lansing, MI 48909 Mr. John A. Zwolinski Director, Design Engineering and Regulatory Affairs Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107 Patricia Lougheed 2443 Warrenville Rd.

Lisle, IL 60532 Michigan Department of Environmental Quality Waste and Hazardous Materials Div.

Hazardous Waste & Radiological Protection Section Nuclear Facilities Unit Constitution Hall, Lower-Level North 525 West Allegan Street P.O. Box 30241 Lansing, MI 48909-7741 Michael J. Finissi, Plant Manager Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 Mr. Joseph N. Jensen, Site Vice President Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 Mr. Fred Emerson Nuclear Energy Institute 1776 I Street, N.W., Suite 400 Washington, DC 20006-3708 Richard J. Grumbir Project Manager, License Renewal Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107

DISTRIBUTION: Letter to M. Nazar, Re: RAI for review of the D.C. Cook Nuclear Plant, Units 1 and 2, Dated: February 25, 2005 Adams Accession No.: ML050560152 HARD COPY RLEP RF E-MAIL:

RidsNrrDrip RidsNrrDe G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski J. Fair RidsNrrDssa RidsNrrDipm D. Thatcher R. Pettis G. Galletti C. Li K. Winsberg (RidsOgcMailCenter)

R. Weisman M. Mayfield A. Murphy S. Smith (srs3)

S. Duraiswamy Y. L. (Renee) Li RLEP Staff G. Galletti L. Lund S. Coffin T. Chan R. Gramm A. Howell M. Shuaibi J. Strasma, RIV M. Kotzalas OPA NRR/ADPT secretary (RidsNrrAdpt)

DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (LRA)

REQUEST FOR ADDITIONAL INFORMATION (RAI)

RAI B.1.9.2-7 The Operating Experience element information submitted in the Section B.1.9 of the application does not include references to inspections and flaw evaluations in accordance with NRC Bulletins 2002-01, 2002-02, and 2003-02, and NRC Order EA-03-009. The staff requests that the applicant update Operating Experience to reference the applicable inspections and flaw evaluations performed to the above listed bulletins and order. The staff requested that the applicant update the Operating Experience to reference the applicable inspections and flaw evaluations performed to the above Bulletins and the Order.