Dominion Nuclear Connecticut, Inc.

Millstone Power Station Dominion Rope Ferry Road Waterford, CT 06385 Fe 1 am U.S. Nuclear Regulatory Commission Serial No.05-052 Attention: Document Control Desk MPS Lic/MAE RO Washington, DC 20555 Docket Nos. 50-336 50-423 License Nos. DPR-65 NPF-49 DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNITS 2 AND 3 TECHNICAL SPECIFICATIONS ANNUAL REPORT Pursuant to the provisions of Millstone Unit 2 and Millstone Unit 3 Technical Specifications (TS), Dominion Nuclear Connecticut, Inc (DNC) is submitting the annual reports described below. These annual reports cover unit activities for the period January 1, 2004, to December 31, 2004.

Millstone Unit 2:

The Millstone Unit 2 activities provided in this report are covered by Section 6.9.1.4, "Annual Reports" as supplemented by Sections 6.9.1.5b, 5c and 5d. Details of these activities are as follows:

  • There were no steam generator tube inservice inspections performed at Millstone Unit 2 in 2004. Therefore, there are no results to be reported in accordance with Millstone Unit 2 TS 6.9.1.5b.
  • There were no challenges to pressurizer power-operated relief valves or safety valves at Units 2 in 2004, nor any failures of these valves to lift or reclose within design basis tolerances. This report is made in accordance with Millstone Unit 2 TS 6.9.1.5d.

Millstone Unit 3:

The Millstone Unit 3 activities provided in this report are covered by Section 6.9.1.2, "Annual Reports." Details of these activities are as follows:

AOO I

Serial No.05-052 Technical Specifications Annual report Page 2 of 3 There were no challenges to pressurizer power-operated relief valves or safety valves at Millstone Unit 3 in 2004, nor any failures of these valves to lift or reclose within design basis tolerances. This report is made in accordance with Millstone Unit 3 TS 6.9.1.2.c.

There are no regulatory commitments contained within this letter.

If you have any questions or require additional information, please contact Mr. David W.

Dodson at (860) 447-1791, extension 2346.

Very truly yours, ice President - Millstone

Serial No.05-052 Technical Specifications Annual report Page 3 of 3

Enclosures:

(0)

Commitments made in this letter: None.

cc: U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Mr. V. Nerses Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8C2 Rockville, MD 20852-2738 Mr. G. F. Wunder Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 08-B-1A Rockville, MD 20852-2738 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station Mr. R. Prince NRC Inspector U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415