.I Kevin J. Nietmann Plant General Manager 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410.495.4101 410.495.4787 Fax Constellation Energy Calvert Cliffs Nuclear Power Plant February 15, 2005 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
SUBJECT:
Document Control Desk Calvert Cliffs Nuclear Power Plant Unit Nos. I & 2; Docket Nos. 50-317 & 50-318 January 2005 Monthly Operating Reports The subject reports are being sent to you as required by Technical Specification 5.6.4.
Should you have questions regarding this matter, we will be pleased to discuss them with you.
Very truly yqurs, KJN/CAN/bjd
Attachment:
January 2005 Monthly Operating Reports cc:
S. L. Miller, Esquire J. E. Silberg, Esquire R. V. Guzman, NRC S. J. Collins, NRC Resident Inspector, NRC R. l. McLean, DNR S. Mainieri, INPO K. N. Larson, ANI 62,~(4
ATTACHMENT JANUARY 2005 MONTHLY OPERATING REPORTS Calvert Cliffs Nuclear Power Plant, Inc.
February 15,2005
OPERATING DATA REPORT Docket No. 50-317 Calvert Cliffs Unit I February 2, 2005 Prepared by Herman 0. Olsen Telephone: (410) 495-6734 REPORTING PERIOD DESIGN ELECTRICAL RATING (NET MWe)
MAXIMUM DEPENDABLE CAP'Y (NET MWe)
JANUARY 2005 845 870 Year-to-Date Cumulative to Date This month
- 1. NUMBER OF HOURS REACTOR WAS CRITICAL
- 2. HOURS GENERATOR ON LINE
- 3. UNIT RESERVE SHUTDOWN HOURS
- 4. NET ELECTRICAL ENERGY GENERATED (MWH) 744.0 744.0 0.0 669,072 744.0 744.0 0.0 669,072 200,868.3 197,644.8 0.0 162,342,769
UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-317 Calvert Cliffs - U1 February 3. 2005 Herman 0. Olsen (410)495-6734 REPORTING MONTH January 2005 TYPE DURATION METHOD OF CAUSE/CORRECTIVE ACTIONS NO.
DATE F:
FORCED DURA REASON SHUTTING S:
SCHEDULED (HOURS)
DOWN 2 COMMENTS There were no shutdowns this month.
l Reason:
A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error H - Other 2 Method:
I - Manual 2 - Manual Scram.
3 - Automatic Scram.
4 - Continued 5 - Other
DOCKET NO. 50-317 CALVERT CLIFFS - UNIT I February 3, 2005
SUMMARY
OF OPERATING EXPERIENCE January 2005 The unit began the month at 100% reactor power.
On 01/30/2005 at 0855 an abnormal operating procedure was entered due to decreasing condenser vacuum. Power was reduced by approximately 55 megawatts in support of trouble shooting. A leak was located in a turbine pedestal drain line. The drain line was plugged and vacuum was restored. Power wvas returned to the previous operating value on 01/31/2005 at 0030. The unit remained at 100% reactor power during the entire evolution.
The unit continued to operate at 100% power for the remainder of the month.
OPERATING DATA REPORT Docket No. 50-318 Calvert Cliffs Unit 2 February 2, 2005 Prepared by Herman 0. Olsen Telephone: (410) 495-6734 REPORTING PERIOD DESIGN ELECTRICAL RATING (NET MWe)
MAXIMUM DEPENDABLE CAP'Y (NET MWe)
JANUARY 2005 845 858 Year-Cumulative to-Date to Date
- 1. NUMBER OF HOURS REACTOR WAS CRITICAL
- 2. HOURS GENERATOR ON LINE
- 3. UNIT RESERVE SHUTDOWN HOURS
- 4. NET ELECTRICAL ENERGY GENERATED (MWH)
This month 744.0 744.0 0.0 656,569 744.0 744.0 0.0 656,569 194,205.2 192,311.8 0.0 158,952,057
UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-318 Calvert Cliffs-U2 February 3. 2005 Herman 0. Olsen (410) 495-6734 REPORT MONTH January 2005 TYPE METHOD OF CAUSE/CORRECTIVE ACTIONS NO.
DATE F:
FORCED DURATION REASON SHUTTING S:
SCHEDULED (HOURS)
DOWN 2 COMMENTS There were no shutdowns this month.
l Reason:
A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error H - Other 2 Method:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Other
DOCKET NO. 50-318 CALVERT CLIFFS - UNIT 2 February 3, 2005
(
SUMMARY
OF OPERATING EXPERIENCE January 2005 The unit operated at 100% reactor power for the entire month.