ES-301 Rev 1,11/26/04 Administrative Topics Outline Form ES-301-1 Facility: Vermont Yankee Date of Examination: Jan 31 2005 Examination Level (circle one): SRO Operating Test Number: 1 Administrative Topic Type Code* Describe activity to be petformed (see Note)

A.l Respond to a Code Red Event (Note 1)

onduct of Operations 2.1.13 SRO 2.9 A.2 (29902) Evaluate CRO logs for readings out of specification and determine required action

>onduct of Operations 2.1.18 SRO 3.0 A.3 (23411) Respond to lowering spent fuel pool level during refueling D

lquipment Control 2.2.28 SRO 3.3 A.4 (29903) Locate and determine radiological conditions for valve inspection qadiation Control 2.3.4 SRO 3.1 A.5 (20036) Offsite Protective Action Recommendation Using ODPS (Note 1)

Imergency Plan 2.4.44 SRO 4.0 P P IIOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

Type Codes & Criteria: (C)ontrol room (D)irect from bank (I3 for ROs; I 4 for SROs & RO retakes)

(N)ew or (M)odified from bank (2 1)

(P)revious 2 exams (I1; randomly selected)

(S)imulator Note 1: Changed from initial outline.

JPM-29912 Rev 1., 12/04 Page 2 of 5 Directions:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.

After providing the initiating cue, ask the individual "DOyou understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Simulator and you are to perform all actions.

You are requested to "talk-through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

An armed man is attempting to enter the protected area. He has fired at the security officers and at both the main and startup transformers. He is currently pinned down behind a concrete barrier in the old parking lot. The Security Shift Supervisor has just declared that a "Code Red" condition exists.

Initiating Cues:

The Shift Manager has directed you to carry out the actions required for a Code Red.

Task Standards:

Send a licensed operator out of the control room, notify plant personnel of a Code Red security condition, declare an Unusual Event and initiate the pager system.

Required Materials:

OP 3 132, Operations Department Response to Security Events AP 3 125, Emergency Plan Classification and Action Level Scheme Simulator Setup:

Any 100% power IC Take positive steps to ensure no outside notifications

JPM-29912 Rev 1., 12/04 Page 3 of 5 Evaluation Performance Steps TIME START:

SATKJNSAT Step 1: Obtain OP 3132.

Standard: Obtain OP 3 132.

SATIUNSAT Step 2: Use Code Red Appendix.

Standard: Utilizes Appendix A.

SATKJNSAT *Step 3: Dispatch a Licensed Operator.

Standard: Sends a licensed operator outside of control room with radio and key ring.

Interim Cue: An operator has left the control room with a key ring and radio.

SATKJNSAT Step 4: Engage Control Room Dead Bolt.

Standard: Indicates he would engage dead bolts.

Interim Cue: The dead bolts have been engaged.

SATKJNSAT Step 5: Set Paginp Svstems to Alert.

Standard: Turns Page Sys Volume and Alarm Tone Select on CRP 9-10 to Alert.

SATKJNSAT *Step 6: Make Announcement.

Standard: Informs plant personnel that a Code Red exists and they should not move about the plant.

SATIUNSAT Step 7: Repeat Announcement.

Standard: Repeats above announcement.

I PM-299 12 Rev 1., 12/04 Page 4 of 5 Evaluation Performance Steps SATNNSAT Step 8: Turn Page System to OFF.

Standard: Places Page Sys Volume and Alarm Tone Select switch on CRP 9-10 to OFF.

SATNNSAT Step 9: Place Outdoor Page Silence Switch to NORM.

Standard: Verifies Outdoor Page Silence Switch is in NORM.

SATAJNSAT *Step 10: Insert a Scram.

Standard: Initiates a manual scram.

SATNNSAT Step 11: Scram actions.

Standard: Initiates immediate scram actions as follows:

0 Verifies all rods inserted 0 Power downscale on APRMs 0 Depresses PB1 on Master FW controller 0 Mode switch to SHUTDOWN after MS flow <OS Mlbmkr

~

Interim Cue: The operator at the controls and the Shift Manager will perform Steps B.2 to B.4.

SATNNSAT *Step 12: Review OP 3125.

Standard: Determines a UE or Alert should be declared per U9aLJlOa or A9dA1Oa.

Interim Cue: The Shift Manager will review your recommendation and the STA will fill out the papemork.

SATKJNSAT Step 13: Start to Dial the Pager System.

Standard: Candidate indicates he would dial the pager system.

Interim Cue: The Shift Manger will complete the remainder of the Code Red procedure.

JPM-299 12 Rev 1., 12/04 Page 1 of 1 EXAMINEE HANDOUT Initial Conditions:

An armed man is attempting to enter the protected area. He has fired at the security officers and at both the main and startup transformers. He is currently pinned down behind a concrete barrier in the old parking lot. The Security Shift Supervisor has just declared that a Code Red condition exists.

Initiating Cues:

The Shift Manager has directed you to carry out the actions required for a Code Red.

JPM-23411 Rev 2, 11/05 Page 1 of 4 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET Task Identification:

Title:

Respond to Lowering Spent Fuel Pool Level During Refueling

Reference:

OP 1101 Task Number: 2337140401,34102903,34404203 Task Performance: AO/RO/SRO - RO/SRO - SRO Only 3 Sequence Critical: Yes - No 3 Time Critical: Yes - No 3 Operator Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation X Performance -Discuss Setting: Classroom - Simulator - Plant 2 Performance Expected Completion Time: 15 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

Prepared by:

4j?

q d 4 -

Ope tions Training Instdtor Date Reviewed by: d I

I c - f /l30l#

Approved by:

... *?

/3 ';'/

z l 57 SRO LicensedCertified Reviewer y

Operatio& Training Superintendent

! Date

/: / L Date

)/

JPM-234 11 Rev 2, 11/05 Page 2 of 4 Directions:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the operator has failed the Job Performance Measure.

After providing the initiating cue, ask the operator "Do you understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Plant and you are to simulate all actions.

You are requested to "talk through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Initial Conditions:

Refueling is in progress and you are the SRO on the refueling bridge. An A 0 and spotter are on the bridge with you moving fuel. A new fuel bundle has been grappled and is being raised from location R-41 in the Spent Fuel Pool. It has not yet cleared the rack.

Initiating Cues:

You notice an unexpected drop in fuel pool level, lowering at about 1 inch per minute. There are no radiation alarms. You are to take any required actions.

Task Standards:

Respond in accordance with OP 1101, precaution 4, evacuate the refuel floor and initiate makeup to the fuel pool.

Required Materials:

OP 1101 General

References:

None

JPM-23411 Rev 2, 11/05 Page 3 of 4 Evaluation Performance Steps TIME START:

SAT/UNSAT *Step 1: Direct Refuel Platform Operator to Stop Raising the New Fuel Bundle Standard: Direction given to platform operator to stop.

Interim Cue: Grapple raise motion is stopped.

SATAJNSAT *Step 2: Direct Refuel Platform Operator to Lower the New Fuel Bundle to Full Down Standard: Direction given to lower the bundle full down in SFP R-41 or any empty fuel pool location.

Interim Cue: The bundle has been lowered to the full down position.

Note: The candidate may direct that the main grapple be opened; however this is not required.

SATNNSAT *Step 3: Direct All Refuel Floor Personnel to Evacuate the Refuel Floor Standard: Direction given to all refuel floor personnel to evacuate.

Interim Cue: Refuel floor personnel have commenced evacuation. The Shift Manager directs you to initiate makeup to the spent fuel poo1,prior to you evacuating, by opening DW-111, and report back on level.

JPM-234 11 Rev 2, 11/05 Page 4 of 4 Evaluation Performance Steps SATKJNSAT *Step 4: Open DW-111 Standard: Candidate rotates DW-111 handwheel counter clock-wise until resistance is felt.

Interim Cue: DW-111 handwheel rotates smoothly CCW until resistance is felt. Fuel pool level is now rising.

SATAJNSAT Step 5: Report to Control Room that DW-111 is OPEN Standard: Make report to control room that DW-111 is open and level is rising.

Interim Cue: NO FURTHER ACTIONS ARE REQUIRED FOR THIS JPM.

TME FINISH:

Terminating Cue: New fuel bundle returned to full down ,refuel floor being evacuated, DW-111 open providing SFP makeup.

Evaluators Comments:

~~

WA's: 2.2.28 SRO 3.3

JPM-23411 Rev 1, 11/04 Page 1 of 1 EXAMINEE HANDOUT Initial Conditions:

Refueling is in progress and you are the SRO on the refueling bridge. An A 0 and spotter are on the bridge with you moving fuel. A new fuel bundle has been grappled and is being raised from location R-41 in the Spent Fuel Pool. It has not yet cleared the rack.

Initiating Cues:

You notice an unexpected drop in fuel pool level, lowering at about 1 inch per minute. There are no radiation alarms. You are to take any required actions.

JPM-29910 Rev O., 11/04 Page 1 of 4 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET Task Identification:

Title:

Evaluate CRO Logs for Readings Out of Specification and Determine Required Actions Failure Mode: -

N/A

Reference:

OP 0150, Conduct of Operations and Operator Rounds Task Number: 2990090301 Task Performance: AO/RO/SRO - RO/SRO Only X SE Only -

Sequence Critical: Yes - No X Time Critical: Yes - No X Individual Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation - Performance X Discuss Setting: Classroom X Simulator - Plant Performance Expected Completion Time: 20 minutes Evaluation Results:

Performance: PASS - Time Required:

Prepared by:  %?A q--

Operations Trainin&nstructor

///SO Date

/w Reviewed by: TSAJlh /I13d 10w SRO Licensedldertified Reviewer p c 74leun Date Approved by:

/AA/*y

/bi$erxions fraining Superintendent Date

JPM-299 10 Rev O., 11/04 Page 2 of 4 Directions:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either Sat or Unsat. Comments are required for any Unsat classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.

After providing the initiating cue, ask the individual DOyou understand the task?

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have. This JPM will be performed in the Classroom and you are to perform all actions.

You are requested to talk-throuph the procedure, stating the parameters you are verifying or checking and the steps you are perfonning.

Inform me upon completion of this task.

Initial Conditions:

The plant is at 100% power. The following equipment was taken out of service on the last shift:

ARx Bldg Supply Fan for lubrication B RHRSW pump for impeller replacement There is one active 30 day LCOforthe RHRSW pump per Tech Specs 3.5.c.2. The plant is in summer time operations with circ water in closed cycle operation.

Initiating Cues:

The Shift Manager has requested you to review a CRO trainees practice set of log entries, pages 24-27.

Task Standards:

It is determined that the current cooling tower basin temperature requires all 4 RHRSW pumps operable and, with one pump inoperable, Alternate Cooling is inoperable and a 7 day LCO is entered.

Required Materials:

OP 0150, Conduct of Operations and Operator Rounds (latest revision), including sheets 24-27 and completed with appropriate data OP 2 181 Service WatedAlternate Cooling Operating Procedure Tech Specs Simulator Setup: N/A

~ -

JPM-29910 Rev O., 11/04 Page 3 of 4 Evaluation Performance Steps TIME START:

SATAJNSAT Step 1: Obtain Procedure OP 0150, Operator Rounds, and review procedure.

Standard: OP 0150 obtained and reviewed.

Interim Cue: Provide log sheets (VYOPF 0150.03 Sheets 24-27) with appropriate data filled in.

Note: If the candidate questions the accuracy of a log entry, inform him the readings are accurate.

SAT/UNSAT Step 2: Review log readings.

Standard: Compare log entry to logs Required Condition SATAJNSAT Step 3: Determines inappropriate lineout of reading; Standard: Indicates that the Torus Water Volume reading should have initials next to the lineout.

SAT/UNSAT Step 4: Reviews OP 2181 Standard: Reviews OP 2 18 1 admin for required RHRSW pumps SATAJNSAT *Step 5: Determine basin temperature and RHRSW requirements .

Standard: Determines 4 RHRSW pumps required.

SAT/UNSAT Step 6: Notify Shift Manager.

Standard: Candidate informs Shift Manager that the plant has less than the required 4 RHRSW pumps.

Interim Cue: Shift Manager requests that you determine what actions are required.

~

Note: The candidate may determine Tech Spec required actions before informing the Shift Manager.

JPM-299 10 Rev O., 11/04 Page 4 of 4 Evaluation Performance Steps SAT/UNSAT *Step 7: Determine LCO Standard: Candidate determines that the Alternate Cooling System is inoperable and the plant is in a 7 day LCO SAT/UNSAT Step 8: Notify Shift Manager.

Standard: Candidate informs Shift Manager that the Alternate Cooling System is inoperable and the plant is in a 7 day LCO.

SAT/UNSAT Step 9: Complete review of logs Standard: Candidate continues to review logs.

Interim Cue: The Shift Manager will complete the review of the logs.

  • Critical Step TIME FINISH:

Terminating Cue: It is determined that the current cooling tower basin temperature requires all 4 RHRSW pumps operable and, with one pump inoperable, Alternate Cooling is inoperable and a 7 day LCO is entered.

Evaluator Comments:

System: WA's:

System Generic WA's: 2.1.18 SRO 3.0

JPM-299 10 Rev O., 11/04 Page 1 of 1 EXAMINEE HANDOUT Initial Conditions:

The plant is at 100% power. The following equipment was taken out of service on the last shift:

A Rx Bldg Supply Fan for lubrication B RHRSW pump for impeller replacement There is one active 30 day LCO for the RHRSW pump per Tech Specs 3.5.c.2. The plant is in summer time operations with circ water in closed cycle operation.

Initiating Cues:

The Shift Manager has requested you to review a CRO trainees practice set of log entries, pages 24-27.

< < appropna elyenrtld,J + are

JPM-299 10 Rev O., 11/04 Page 1 of 1 EXAMINEE HANDOUT Initial Conditions:

The plant is at 100% power. The following equipment was taken out of service on the last shift:

ARx Bldg Supply Fan for lubrication ByRHRSW pump for impeller replacement There is one active 30 day LCO for the RHRSW pump per Tech Specs 3.5.c.2. The plant is in summer time operations with circ water in closed cycle operation.

Initiating: Cues:

The Shift Manager has requested you to review a CRO trainees practice set of log entries, pages 24-27.

CRO ROUND SHEET (Continued) Date REQUIRED CONDITION I 00-06 I 06-12 I 12-18 I 18-24 I IH2AN-OG 2921 (A/B) (SR 91-75) 3.8.3.1 4.8.5.1 (4.3.4)

1. 4 0 0 % of Full Scale (lOO%=4%Hz)
2. Agrees w/in 10% Full Scale of (T.4.1.2) H N - O G 2922 (NB)

HzAN-OG 2922 (AB) 1. 400% of Full Scale

( 100%=4%Hz)

2. Agrees w/in 10%Full Scale of H m - O G 2921 (A/B)

Rad Monitor 3127/3128 (SR 90-20) (SR 91-75) (4.3.4)

(T.4.1.2) r----

Rad Monitor 3127/3128 Instrument Check Agree w/in 1 decade I I I W A C Fans (AC, AH, & EXH) Train A or B Running (Note a combination of A and B fans running I is an indication that a standby unit may have auto-started) 13 CRP 9-23 VYOPF 0150.03 OP 0150 Rev. 41 Page 24 of 27

CRO ROUND SHEET (Continued) Date TS ETMI REQUIRED CONDlTION 00-06 . 06-12 12-18 18-24 (ODCM)

OTHER

ontrol Room Fire Detection Panel (CP-115-3) hrbine Bearing Oil Temps Check (ERmS TBD kreen) (ER950525-02) rurbine Bearing Vibration ( E M S TBD Screen)

- ~~ -

2ompensated Torus Water Volume (C029 or

,1-16-19-46A/B and OP 2115 Fig. 1)

ore Thermal Power C047 Compensated Torus Water Temperature (C207) or 4verage Torus Water Temperature from r1-16-19-33~~

SJAE SteamFJiowTO32

~~ ~

Circ Water Inlet (C053)and Condenser Backpressure (C033)During Cold Weather Operations ACS Operability, CT-2-1 Deep Basin Temperature.

Use computer point F074. Record value.

VYOPF 0150.03 OP 0150 Rev, 41 Page 25 of 27

CRO ROUND SHEEr (Continued) Date I TS [TRM]

(ODCM)

I WQUIREDCONDITION I 00-06 '1 06-12 1 12-18 I 18-24 Drywell Sump Surveillance I

Jet Pump Surveillance 4.6.F.1 VYOPF 4110.04 4.6.F.2 VYOPF 0150.03 OP 0150Rev. 41 Page 26 of 27

CRO ROUND SHEET (Continued) Date TS [TRM]

REQUIRED CONDITION 00-06 06-12 12-18 18-24 (ODCM)

Core Parameters 4.11.A VYOPF 4401.01 4.11.B 4.11.C 33-Control Room Recorders Timemrend Dated :s in service or refer to Input Data into "Runtanks" for CST and DST Levels Perf'orm Daily Operations Department Control Room Panel Walkdown Checklist VYOPF 0150.10 Recorded By I GENERAL NOTEE:

(1) When recorders that monitor Tech. Spec./[TRM] items are out of service, perform the following:

a. If the parameter is required to be continuously recorded, log the parameter hourly in the Comments section.
b. If the parameter is not required to be continuously recorded, log the parameter once a shift in the Comments section.

(2) Compare the operable APRM GAPSfrom ERF'IS REO screen from one shift to another at steady state conditions (no power changes greater than 5% in the last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or no rod pattern adjustment within the last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />).

a. If all the operable APRM GAFs change by greater than 0.010 (equivalent to 15.93 MWth) and this change cannot be attributed to MRh4 GAF adjustment by I&C or some other known reason.
2) Then request Reactor Engineering validate heat balance inputs.
b. If all the operable AF'RM GAFs change by more than 0.010
1) Then maintain actual RTP less than or equal 100%APRM power indication.

(3) Notify SM if increase M.03 ft. (4 gpm in-leakage) from previous 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> reading. The Shift Supv. shall have previous week's readings trended to determine normal volume increase. If Torus volume increases 4 gpm higher than normaI, action shall be taken to determine the cause.

(4) (If the 87.3"F limit is exceeded refer to OP 2115 Appendix G for additional margin based upon instrument and computer point availability)

I VYOPF 0150.03 OP 0150 Rev. 41 Page 27 of 27

CRO ROUND SHEET TURNOVER SHEET Date TS [TRM]

(ODCM) REQUTRED CONDITION 00-06 06-12 12-18 18-24 A3 A4 A5 I A6

~ ~~ ._ - ~~

VYOPF; 0150.03A OP 0150 Rev. 41 Page 1 of 4

. I JPM-299 11 Rev O., 11/04 Page 1 of 5 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET Task Identification:

Title:

Locate and Determine Radiological Conditions for Valve Inspection Failure Mode: N/A

Reference:

AP 0506, Personnel Monitoring Task Number: 2990100301 Task Performance: AO/RO/SRO - RO/SRO Only X SE Only -

Sequence Critical: Yes - No 2 Time Critical: Yes - No 2 Individual Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation - Performance X Discuss -

Setting: Classroom X Simulator - Plant Performance Expected Completion Time: 15 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

Prepared by:

Operations Training Instructor Date Reviewed by: e/ 7 S,XJh-SRO LicenseddertifieiReviewer  ?@7??lecd/ Date Approved by: I GA f

/Op&at%ns T d n Z S u p e r i ntendent Date I

JPM-299 11 Rev O., 11/04 Page 2 of 5 Directions:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either Sat or Unsat. Comments are required for any Unsatclassification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.

After providing the initiating cue, ask the individual Do you understand the task?

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Classroom and you are to perform all actions.

You are requested to talk-through the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

You have requested that an A 0 verify the RCU Pump A suction, CU-l9A, is open and to observe the pump run. The A 0 currently has an accumulated dose (TEDE) of 1800 mr for the year and is the only one available for the job. He is a new A 0 and has no accumulated dose for previous years. As part of preparation for a pre-job brief you are to review the survey map to determine the radiological conditions.

Initiating Cues:

Determine the following information for the brief Area with the lowest dose 0 Area with the lowest contamination levels 0 Maximum stay time i f o A 0 stands next to ladder to observe valve and pump and he does not exceed VY Routine Annual Administrative Guidelines for dose In the event a dose extension is necessary, determine whos approval is necessary to extend the dose to VYs Maximum Annual Administrative Guidelines for dose Task Standards:

Areas with the lowest dose and contamination levels are determined. The correct stay time is calculated. The proper authorities for a dose extension are named.

JPM-29911 Rev O., 11/04 Page 3 of 5 Required Materials:

AP 0506, Personnel Monitoring Radiological Survey Map for 280E RWCU A Pump Room Simulator Setup:

N/A

JPM-299 11 Rev O., 11/04 Page 4 of 5 Evaluation Performance Steps TIME START:

SATAJNSAT Step 1: Obtain and review survey map.

Standard: Survey map obtained and information reviewed.

Interim Cue: Provide survey map.

SATAJNSAT *Step 2: Determine area with lowest dose.

Standard: Area in front of step off pad identified.

SATAJNSAT *Step 3: Determine area with lowest contamination levels.

Standard: Area in front of step off pad identified.

SATAJNSAT *Step 4: Calculate maximum stay time.

Standard: Calculates a maximum stay time of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

Note: Calculation based on 200 mr remaining on a routine admin limit of 2000 mr. The general area dose near ladder is 100 mrhr.

SATNNSAT *Step 5: Identify authorities required for dose extension to Maximum Admin Limits.

Standard: The RP Superintendent and General Manager identified as approval authorities for extension.

  • Critical Step

JPM-29911 Rev O., 11/04 Page 5 of 5 TIME FINISH:

Terminating Cue: Low contamination/dose areas identified, stay time calculated and extension authorities identified.

Evaluator Comments:

System: KIA's:

System Generic KIA's: 2.3.4 SRO 3.1

JPM-299 11 Rev O., 11/04 Page 1 of 1 EXAMINEE HANDOUT Initial Conditions:

You have requested that an A 0 verify the RCU Pump A suction, CU-l9A, is open and to observe the pump run. The A 0 currently has an accumulated dose (TEDE) of 1800 mr for the year and is the only one available for the job. He is a new A 0 and has no accumulated dose for previous years. As part of preparation for a pre-job brief you are to review the survey map to determine the radiological conditions.

Initiating Cues:

Determine the following information for the brief Area with the lowest dose Area with the lowest contamination levels Maximum stay time i f o A 0 stands next to ladder to observe valve and pump and he does not exceed VY Routine Annual Administrative Guidelines for dose In the event a dose extension is necessary, determine whos approval is necessary to extend the dose to VYs Maximum Annual Administrative Guidelines for dose

by:

JPM-20036 Rev. 11, 11/05 Page 1 of 7 VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET Task Identification:

Title:

Off-Site Protective Action Recommendations Using ODPS Failure Mode: -

N/A

Reference:

OP-35 11, Off-Site Protective Action Recommendations OP-35 13, Evaluation of Offsite Radiological Conditions Task Number: 2007150501 Task performance: AO/RO/SRO __ RO/SRO SRO Only -

Sequence Critical: Yes- N o 3 Time Critical: Yes- N o 2 Operator Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation - Performance Discuss -

Setting: Classroom - Simulator X Plant Performance Expected Completion Time: 30 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

Prepared by:

Date Reviewed by:

SRO LicensedlCertifiedReviewer Approved by: / J / I /o 4 Date

PM-20036 Rev. 11, 11/05 Page 2 of 7 Directions:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the operator has failed the Job Perfonnance Measure.

After providing the initiating cue, ask the operator "DOyou understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be perfonned in the Simulator and you are to perform the actions.

You are requested to "talk through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

The following plant conditions exist:

- A reactor transient has occurred that caused fuel damage

- Reactor is shutdown

- Elevated release is in progress

- NO ground release has occurred

- Release began two hours ago

- General Emergency EAL has just been declared

- Chemistry technician is taking a silver zeolite air sample from the stack

- Site Boundary Team dispatched

- PAR based on plant conditions has been completed per OP 35 11,section I.

Initiatiw Cues:

The PED has requested that you determine off-site protective action recommendations based on Radiological Dose information using ODPS.

Task Standards:

Operator makes appropriate off-site PAR determination per OP 35 11.

JPM-20036 Rev. 11, 11/05 Page 3 of 7 Required Materials:

OP 351 1, Off-Site Protective Action Recommendations (latest revision)

VYOPF 351 1.01, Protective Action Recommendation Worksheet completed for initial PAR on plant conditions OP 35 13, Evaluation of Offsite Radiological Conditions (latest revision)

Initial plant PAR completed on form 3511.01 (attached)

ERFIS Source Term Data printout (attached)

ERFIS PAR printout (attached)

Simulator Setup:

Any full power IC with ERFIS available. Insert malfunction RMOlF at 0.4%, stack Hi-Range monitor.

JPM-20036 Rev. 11, 11/05 Page 4 of 7 Evaluation Performance Steps TIME START:

SATKINSAT Step 1: Obtain Procedure O P 3511, Section I1 and review precautions Standard: Operator obtains and reviews procedure SATfUNSAT Step 2: Obtain Procedure OP 3513,Section I and review precautions Standard: Operator obtains procedure and reviews precautions SAT/UNSAT Step 3: Obtain current off-site dose pro-iection results and meteorological data (wind direction and stability class) from OP 3513.

Standard: Operator Goes to OP 3513 as directed by OP 3511, step 1I.A.1.

SATKINSAT Step 4: If ODPS is operable, then implement Appendix G to access off-site dose pro.iection information from ODPS.

Standard: Operator Goes to OP 3513, Appendix G as directed by OP 3513, step I.A.4.

SATKINSAT Step 5: Press the "ODPS" EWIS terminal key to access the "ODPS Menu" screen Standard: Operator presses the white "ODPS" key on an ERFIS keyboard or enters ODPS by clicking through screen menus SATKINSAT *Step 6: Click on the "SOURCE TERM DATA" box to display screen Standard: Operator clicks on the "Source Term Data" box.

SAT/UNSAT Step 7: Click on the PRINTER icon to obtain record of stack release pro-iectioninformation (Reactor Trip Status and Stack).

Standard: Clicks on the PRINT icon on the ERFIS screen Interim Cue: Provide the candidate with the attached EWIS Source Term Data printout. If asked, the printout has the current date and time.

JPM-20036 Rev. 11, 11/05 Page 5 of 7 SATPUNSAT Step 8: Press the "ODPS" ERFIS terminal key to return to the "ODPS Menu" screen Standard: Operator presses white "ODPS" key.

SAT/UNSAT *Step 9: Click on the "PROTECTIVE ACTION RECOMMENDATIONS LIVE STACK MR/HR" box to display screen Standard: Operator clicks on the Protective Action box to generate the PAR SATKINSAT Step 10: When "PROTECTIVE ACTION RECOMMENDATION" screen is displayed, click on the PRINTER icon to obtain stack release off-site dose prqjection information.

Standard: Operator clicks on the PRINT icon.

Interim Cue: Provide the candidate with the attached ERFIS PAR printout. If asked, the printout has the current date and time.

SATKINSAT Step 11: Press the "ODPS" ERFIS terminal key to return to the "ODPS Menu" screen Standard: Operator presses white "ODPS" key SATPUNSAT Step 12: If only one release point exists (stack or ground), then continue with the following actions:

Implement OP 3511 Section 11, Step A.2 to formulate Protective Action Recommendations for State authorities Standard: References OP 3511, Section 2 Step A.2.

SATPUNSAT Step 13: Compare the calculated dose pro-iection results with EPA Protective Action Guidelines delineated below to determine whether EPA Protective Action Guidelines have been exceeded Standard: Notes that Total Effective Dose is >1.

JPM-20036 Rev. 11, 11/05 Page 6 of 7 SAT/UNSAT *Step 14: Determine appropriate table to use.

Standard: Selects Table 5.

SAT/UNSAT *Step 15: Choose towns affected by the PAR Standard: Selects "Sector A" for wind direction and stability class.

SAT/UNSAT *Step 16: Record appropriate PAR information in Section I1 of VYOPF 3511.01 Standard: Operator records PAR data on OP 35 11.01 with evacuation recommended for Vernon, Hinsdale, Bernardston and Northfield.

SATAJNSAT Step 17: Forward completed VYOPF 3511.01 to the Site Recovery Manager or senior manager in charge.

Standard: Provides copy of Protective Action Recommendation to the PED.

Interim Cue: No further actions are required for this JPM.

  • Critical Step TIME FINISH:

Terminating Cue: Operator completes 35 11.01 with appropriate offsite protective action recommendations.

Evaluator Comments:

System Generic WA's: 2.4.44 SR04.4

JPM-20036 Rev. 11, 11/05 Page 1 of 1 EXAMINEE HANDOUT Initial Conditions:

The following plant conditions exist:

- A reactor transient has occurred that caused fuel damage

- Reactor is shutdown

- Elevated release is in progress

- NO ground release has occurred

- Release began two hours ago

- General Emergency EAL has just been declared

- Chemistry technician is taking a silver zeolite air sample from the stack

- Site Boundary Team dispatched

- PAR based on plant conditions has been completed per OP 35 11, section I.

Initiating Cues:

The PED has requested that you determine off-site protective action recommendations based on Radiological Dose information using ODPS.

PROTECTIVEACTION RECOMMENDATIONWORKSHEET INFORMATION CURRENT AT: Tbd(47' / (' 6;I:' Cj (Timemate)

PROTECTIVEACTION RECOMMENDATIONS I1 SECTION I: PLANT CONDITIONS SECTION 11: RADIOLOGICAL DOSE (Fill in with appropriate letter designation for (Fill in with letter designation for affected towns) affected towns from Table 3) E= Evacuate OR S= Shelter in Place (Check if appropriate)

OR NO PARSBased on Radiological Dose E= Evacuate VERMONT TOWNS VERMONT TOWNS Brattleboro Brattleboro Dummerston Guilford Guilford 7 Vernon Halifax Vernon NEW HAMPSHIRE TOWNS NEW HAMPSHIRE TOWNS Hinsdale

- 7 Winchester Chesterfield

-HinsdaIe MASSACHUSETTS TOWNS Richmond Swanzey Winchester MASSACXUSETTS TOWNS Bemardston Colrain Gill Greenfield Leyden Northfield Wanvick I'he following was used (Check as applicable):

r]Nomogram DODPS OMETPAC OField Data rerformed By:

derified By:

(The following information to be frIled in by Senior Manager in charge or designated alternate)

Approved By: ICGKJj--p+ &L a y 2' (Time/&te) 06 c ? 6 ) / ~ d c 4 f WPED ,fl DTSC Coordinator OSite RecoveryManager (Check one)

Transmit approved PAR to State Authorities as delineatedin OP 3540 (PED or TSC Coordinator using OP 3540.06) or OP 3546 (Site Recovery Manager using OP 3546.02)

VYOPF 3511.01 OP 3511 Rev. 14 Page 1 of 1

T H I S STRAIGHTLINE PROJECTION USES SOURCE TERM DATA AND 15 MINUTE AVERAGES OF UPPER PRIMARY METEOROLOGICAL TOWER DATA FROM 10 45 AND THE STACK DOSE RATE OF 39999.5000 MR/HR.

WIND DIRECTION FROM: 2 DEGREES MET WIND SPEED: 2 MPH DELTA TEMPERATURE: -3.20 F DATA S T A B I L I T Y CLASS: A PRECIPITATION : 0.50 IN/QTR HR TOTAL EFF. EQUIV: 1869 MR/HR

'ITE ADULT THYROID:

106 MR/HR TOTAL EDE ADULT THY PAR 8 (REM) (REM)

.35 14.949 HOUR 1.00 0.845 EVAC 2.372 0.239 EVAC

. DOSE 2.00 0.912 0.034 EVAC 3.00 0.566 0.006 EVAC 4.00 0.423 0.001 EVAC 5.00 0.343 0.000 EVAC 6.00 0.291 0.000 NONE 7.00 0.254 0.000 NONE 8.00 0.225 0.000 NONE 9.00 0.202 0.000 NONE 10.00 0.184 0.000 NONE

.35 MILES AT 10 : 41 2.00 MILES A T ARRIVAL T I M E S 5.00 MILES AT 11 : 34 13 : 4 10.00 MILES A T 15 : 34

eo a PLANT MODE RUN VYOPF3513.01 SOURCE TERM DATA 1 SPPCS 111 5/2 04 10:f4:0f REACTOR ELAPSED T I M E SINCE ON o/ o/ 0 PLANT T R I P T R I P STATUS NORM AT 0: 0: 0 0 MINUTES STACK HIGH RANGE ELEVATED RADIATION RELEASE ON 11/ 25/ 4 39999.5000 MR/HR > 0.1445 MR/HR YES AT 10: 34: 3 NOTE: A RELEASE I S ASSUMED TO BE I N PROGRESS I F AN ELEVATED STACK MR/HR VALUE I N EXCESS OF 0.1445 I S PRESENT FOR LONGER THAN 10 SECONDS. THIS AFFECTS THE CALCULATION OF PLUME ARRIVAL TIMES ONLY.

AVG STACK FLOW (FT-108-22) 135690 SCFM UNMONITORED A NONZERO DOWNWIND SITE BOUNDARY DOSE RATE OF:

0.0000 MR/HR HAS BEEN MANUALLY ENTERED FOR o / o / 0 AT 0: 0: 0