ML050420088
| ML050420088 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 02/10/2005 |
| From: | Moorman J Division of Reactor Safety II |
| To: | Grissette D Southern Nuclear Operating Co |
| References | |
| 50-424/05-301, 50-425/05-301 | |
| Download: ML050420088 (4) | |
See also: IR 05000424/2005301
Text
February 10, 2005
Southern Nuclear Operating Company, Inc.
ATTN: Mr. D. E. Grissette, Vice President
P. O. Box 1295
Birmingham, AL 35201-1295
SUBJECT:
REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS -
VOGTLE NUCLEAR PLANT - 05000424/2005301 AND 05000425/2005301
Dear Mr. Grissette:
In a telephone conversation on February 9, 2005, between Mr. Daniel Scukanec, Senior
Nuclear Operations Plant Instructor, and Mr. Richard S. Baldwin, Senior Operations Engineer,
arrangements were made for the administration of licensing examinations at Vogtle Nuclear
Plant. The written examinations are scheduled to be given on May 16, 2005, and the operating
tests are scheduled to be given during the weeks of May 16 and May 23, 2005. The on-site
preparatory week is scheduled for the week of May 2, 2005.
As agreed during the telephone conversation, the NRC will prepare the written examination,
operating test outlines and simulator outlines. Your staff will provide details for these outlines
based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for
Power Reactors, Revision 9. The NRC regional office will discuss with your staff any changes
that might be necessary before the examinations are administered. Your staff will be given the
opportunity to review the examinations during the week of April 25, 2005.
To meet the above schedule, it will be necessary for your staff to furnish the reference materials
identified in Attachment 2 of ES-201 by February 21, 2005. Any delay in receiving the required
reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
2
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,
2006. The public reporting burden for this collection of information is estimated to average 50
hours per response, including the time for reviewing instructions, gathering and maintaining the
data needed and completing and reviewing the collection of information. Send comments on
any aspect of this collection of information, including suggestions for reducing the burden, to
the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV;
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
0018), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS
is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Scukanec has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Rick Baldwin at (404) 562-4642,
(Internet E-mail: RSB2@nrc.gov), or or me at (404) 562-4647, (Internet E-mail: JHM2@nrc.gov)
Sincerely,
/RA/
James H. Moorman, III, Chief
Operator Licensing Branch
Division of Reactor Safety
Docket Nos.: 50-424, 50-425
cc: (See next page)
3
cc cont'd:
J. T. Gasser
Executive Vice President
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
W. F. Kitchens
General Manager, Plant Vogtle
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
N. J. Stringfellow
Manager-Licensing
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Director, Consumers' Utility Counsel
Division
Governor's Office of Consumer Affairs
2 M. L. King, Jr. Drive
Plaza Level East; Suite 356
Atlanta, GA 30334-4600
Office of the County Commissioner
Burke County Commission
Waynesboro, GA 30830
Director, Department of Natural Resources
205 Butler Street, SE, Suite 1252
Atlanta, GA 30334
Manager, Radioactive Materials Program
Department of Natural Resources
Electronic Mail Distribution
Attorney General
Law Department
132 Judicial Building
Atlanta, GA 30334
Laurence Bergen
Oglethorpe Power Corporation
Electronic Mail Distribution
Resident Manager
Oglethorpe Power Corporation
Alvin W. Vogtle Nuclear Plant
Electronic Mail Distribution
Arthur H. Domby, Esq.
Troutman Sanders
Electronic Mail Distributioin
Senior Engineer - Power Supply
Municipal Electric Authority
of Georgia
Electronic Mail Distribution
Reece McAlister
Executive Secretary
Georgia Public Service Commission
244 Washington Street, SW
Atlanta, GA 30334
Robert J. Brown, Plant Training &
Emergency Preparedness Manager
Vogtle Electric Generating Plant
Southern Nuclear Operating Co., Inc.
Bin 63030 7821 River Road
Waynesboro, GA 30830
_________________________
OFFICE
RII:DRS
RII:DRS
RII:DRP
SIGNATURE
/RA/
/RA/
/RA/
NAME
RBaldwin:pmd
JMoorman
MWidmann
DATE
2/10/05
2/10/05
2/10/05
E-MAIL COPY?
YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO