Response to Generic Letter 2004-01, Requirements for Steam Generator Tube Inspections
ML050400189
Person / Time
Site: Byron, Braidwood  
Issue date: 03/23/2005
From: Dick G
NRC/NRR/DLPM/LPD3
To: Crane C
Exelon Generation Co
Dick G , NRR/DLPM, 415-3019
References
GL-04-001, TAC MC4802, TAC MC4804
Download: ML050400189 (3)


Text

March 23, 2005 Mr. Christopher M. Crane, President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

BYRON STATION, UNIT 1 AND BRAIDWOOD STATION, UNIT 1 - RESPONSE TO GENERIC LETTER 2004-01, REQUIREMENTS FOR STEAM GENERATOR TUBE INSPECTIONS (TAC NOS. MC4804 AND MC4802)

Dear Mr. Crane:

On August 30, 2004, the Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2004-01, Requirements For Steam Generator Tube Inspections. The purpose of GL 2004-01 was to obtain information that would enable the NRC staff to determine whether licensees steam generator (SG) tube inspection programs comply with the existing tube inspection requirements (the plant technical specifications in conjunction with Appendix B of Title 10 of the Code of Federal Regulations (10 CFR) Part 50).

By letter dated October 29, 2004 (ML043060328), Exelon Generation Company, LLC (Exelon) responded to GL 2004-01 for Byron Station, Units 1 and 2 (Byron 1 and 2) and Braidwood Station, Units 1 and 2 (Braidwood 1 and 2). The NRC staffs review of Exelons response to the GL for Byron 1 and Braidwood 1 did not identify any concerns with the inspection practices related to GL 2004-01 employed at those two units. The staff, therefore, concludes that Exelons SG tube inspection practices related to GL 2004-01 for Byron 1 and Braidwood 1 are in compliance with the existing tube inspection requirements.

The responses for Byron 2 and Braidwood 2 remain under staff review and will be addressed in future correspondence. If you have any questions regarding this matter, please contact George Dick at (301) 415-3019.

Sincerely,

/RA/

George F. Dick, Sr. Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. STN 50-454 and STN 50-456

Byron/Braidwood Stations cc:

Dwain W. Alexander, Project Manager Westinghouse Electric Corporation Energy Systems Business Unit Post Office Box 355 Pittsburgh, PA 15230-0355 Joseph Gallo Gallo & Ross 1025 Connecticut Ave., NW, Suite 1014 Washington, DC 20036 Howard A. Learner Environmental Law and Policy Center of the Midwest 35 East Wacker Dr., Suite 1300 Chicago, IL 60601-2110 U.S. Nuclear Regulatory Commission Byron Resident Inspectors Office 4448 N. German Church Road Byron, IL 61010-9750 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Ms. Lorraine Creek RR 1, Box 182 Manteno, IL 60950 Chairman, Ogle County Board Post Office Box 357 Oregon, IL 61061 Mrs. Phillip B. Johnson 1907 Stratford Lane Rockford, IL 61107 George L. Edgar Morgan, Lewis and Bockius 1800 M Street, NW Washington, DC 20036-5869 Attorney General 500 S. Second Street Springfield, IL 62701 Illinois Emergency Management Agency Division of Disaster Assistance &

Preparedness 110 East Adams Street Springfield, IL 62701-1109 Byron Station Plant Manager Exelon Generation Company, LLC 4450 N. German Church Road Byron, IL 61010-9794 Site Vice President - Byron Exelon Generation Company, LLC 4450 N. German Church Road Byron, IL 61010-9794 U.S. Nuclear Regulatory Commission Braidwood Resident Inspectors Office 35100 S. Rt. 53, Suite 79 Braceville, IL 60407 Chairman Will County Board of Supervisors Will County Board Courthouse Joliet, IL 60434 Braidwood Station Plant Manager Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Ms. Bridget Little Rorem Appleseed Coordinator 117 N. Linden Street Essex, IL 60935

ML050400189 OFFICE PM: PDIII-2 LA: PDIII-2 SC: PDIII-2 NAME GDick PCoates GSuh DATE 3/23/05 3/2/05 3/23/05