D.C.Cook - Units 1 and 2 - Response to GL 2004-01, Requirements for Steam Generator Tube Inspections
ML050390546
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/12/2005
From: Lyon C
NRC/NRR/DLPM/LPD3
To: Nazar M
Indiana Michigan Power Co
Lyon C, NRR/DLPM, 415-2296
References
GL-04-001, TAC MC4814, TAC MC4815
Download: ML050390546 (3)


Text

February 12, 2005 Mr. Mano K. Nazar Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Buchanan, MI 49106

SUBJECT:

DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2 - RESPONSE TO GENERIC LETTER 2004-01, "REQUIREMENTS FOR STEAM GENERATOR TUBE INSPECTIONS" (TAC NOS. MC4814 AND MC4815)

Dear Mr. Nazar:

On August 30, 2004, the Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2004-01, Requirements For Steam Generator Tube Inspections. The purpose of GL 2004-01 was to obtain information that would enable the NRC staff to determine whether licensees steam generator (SG) tube inspection programs comply with the existing tube inspection requirements (the plant technical specifications in conjunction with Appendix B to Title 10 of the Code of Federal Regulations Part 50 (10 CFR Part 50, Appendix B)).

By letter dated October 27, 2004 (ML043080352), you responded to GL 2004-01 for Donald C.

Cook Nuclear Plant, Units 1 and 2 (CNP). The staffs review of your response to the GL did not identify any concerns with the inspection practices employed at CNP. The staff, therefore, concludes that your SG tube inspection practices are in compliance with the existing tube inspection requirements.

If you have any questions regarding this matter, please contact me at (301) 415-2296.

Sincerely,

/RA/

Carl F. Lyon, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-315 and 50-316 cc: See next page

ML050390546

  • Memo dated 1/27/05 OFFICE PM:PD3-1 LA:PD3-1 SC:EMCB SC:PD3-1 NAME FLyon THarris LLund*

LRaghavan DATE 02/ 10 /05 02/ 9 /05 1/27/05 02/ 2 /05

Donald C. Cook Nuclear Plant, Units 1 and 2 cc:

Regional Administrator, Region III U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Attorney General Department of Attorney General 525 West Ottawa Street Lansing, MI 48913 Township Supervisor Lake Township Hall P.O. Box 818 Bridgman, MI 49106 U.S. Nuclear Regulatory Commission Resident Inspector's Office 7700 Red Arrow Highway Stevensville, MI 49127 James M. Petro, Jr., Esquire Indiana Michigan Power Company One Cook Place Bridgman, MI 49106 Mayor, City of Bridgman P.O. Box 366 Bridgman, MI 49106 Special Assistant to the Governor Room 1 - State Capitol Lansing, MI 48909 Mr. John A. Zwolinski Safety Assurance Director Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 Michigan Department of Environmental Quality Waste and Hazardous Materials Div.

Hazardous Waste & Radiological Protection Section Nuclear Facilities Unit Constitution Hall, Lower-Level North 525 West Allegan Street P. O. Box 30241 Lansing, MI 48909-7741 Michael J. Finissi, Plant Manager Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 Mr. Joseph N. Jensen, Site Vice President Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106