ML050390133
| ML050390133 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 02/04/2005 |
| From: | Paul Krohn NRC/RGN-I/DRP/PB6 |
| To: | Balduzzi M Entergy Nuclear Operations |
| Krohn P, RI/DRP/PB6/610-337-5120 | |
| References | |
| Download: ML050390133 (3) | |
Text
February 4, 2005 Mr. Michael A. Balduzzi Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
SUBJECT:
YOUR NOVEMBER 18, 2004, LETTER IN RESPONSE TO NRC REQUEST FOR INFORMATION
Dear Mr. Balduzzi:
By letter dated November 18, 2004, Entergy Nuclear Operations, Inc., Pilgrim Nuclear Power Station, responded to a request for information related to NRCs letter dated October 20, 2004, regarding the actions taken or planned to ensure that a finding by the U.S. Department of Labors Occupational Safety & Health Administration (OSHA) of alleged discrimination against an employee of one your contractors did not have a chilling effect on other employees raising safety concerns. Your letter did not request any data be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390. We have reviewed your response and determined that it is acceptable, and have no further questions.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, as well as the redacted version of your November 18, 2004 letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.
If you have any questions regarding this matter, I may be reached at 610-337-5120.
Sincerely,
/RA/
Paul G. Krohn, Chief Projects Branch 6 Division of Reactor Projects Docket No. 50-293 License No. DPR-35
2 Mr. Michael A. Balduzzi cc w/encl:
G. J. Taylor, Chief Executive Officer, Entergy Operations M. Kansler, President, Entergy Nuclear Operations, Inc.
J. T. Herron, Senior Vice President and Chief Operating Officer S. J. Bethay, Director, Nuclear Assessment D. L. Pace, Vice President, Engineering B. OGrady, Vice President, Operations Support J. F. McCann, Director, Nuclear Safety Assurance C. D. Faison, Manager, Licensing M. J. Colomb, Director of Oversight, Entergy Nuclear Operations, Inc.
D. Tarantino, Nuclear Information Manager B. S. Ford, Manager, Licensing, Entergy Nuclear Operations, Inc.
J. M. Fulton, Assistant General Counsel, Entergy Nuclear Operations, Inc.
S. Lousteau, Treasury Department, Entergy Services, Inc.
R. Walker, Department of Public Health, Commonwealth of Massachusetts The Honorable Therese Murray The Honorable Vincent deMacedo Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Chairman, Nuclear Matters Committee Plymouth Civil Defense Director D. OConnor, Massachusetts Secretary of Energy Resources J. Miller, Senior Issues Manager Office of the Commissioner, Massachusetts Department of Environmental Protection Office of the Attorney General, Commonwealth of Massachusetts Electric Power Division, Commonwealth of Massachusetts R. Shadis, New England Coalition Staff D. Katz, Citizens Awareness Network Chairman, Citizens Urging Responsible Energy J. Sniezek, PWR SRC Consultant R. Toole, PWR SRC Consultant C. McCombs, Acting Director, MEMA and Commonwealth of Massachusettts, SLO Designee Commonwealth of Massachusetts, Secretary of Public Safety
3 Mr. Michael A. Balduzzi Distribution w/encl: (via E-mail)
S. Collins, RA J. Wiggins, DRA A. Blough, DRP S. Lee, RI EDO Coordinator C. Anderson, DRP P. Krohn, DRP D. Florek, DRP K. Jenison, DRP D. Roberts, NRR L. Licata, PM, NRR D. Collins, PM, NRR W. Raymond, DRP, Senior Resident Inspector C. Welch, DRP, Resident Inspector A. Ford, DRP, Resident OA K Farrar, ORA, RC Region I Docket Room (with concurrences)
DOCUMENT NAME: E:\\Filenet\\ML050390133.wpd SISP Review Complete: ___KMJ_____ (Reviewers Initials)
After declaring this document "An Official Agency Record" it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP/PB6 RI/DRP/PB5 RI/ORA/RC RI/DRP NAME PKrohn/PGK CAnderson/CJA KFarrar/KLF ABlough/ARB DATE 02/04/05 02/04/05 02/04/05 02/04/05 OFFICIAL RECORD COPY