Withholding from Public Disclosure, Additional Information Regarding the Cycle Specific SLMCPR for FitzPatrick Cycle 17, December 1, 2004,
ML050310285
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 01/31/2005
From: Milano P
NRC/NRR/DLPM/LPD1
To: Andersen J
Global Nuclear Fuel
Milano P, NRR/DLPM , 415-1457
References
TAC MC3391
Download: ML050310285 (5)


Text

January 31, 2005 Mr. Jens G. M. Andersen Project Manager Global Nuclear Fuel-Americas, L.L.C.

3901 Castle Hayne Road Wilmington, NC 28402

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MC3391)

Dear Mr. Andersen:

By letter dated December 14, 2004, Entergy Nuclear Operations, Inc., (the licensee) submitted a response to a request for additional information (RAI) from the Nuclear Regulatory Commission (NRC) for the James A. FitzPatrick Nuclear Power Plant. The NRC staff requested the information in order to complete its review of the licensees application for an amendment regarding changes in the safety limit values for Minimum Critical Power Ratio (SLMCPR). In its December 14 letter, the licensee included an affidavit dated December 1, 2004, executed by you requesting that the following document containing proprietary information of Global Nuclear Fuel-Americas, L.L.C. (GNF-A) be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390:

Additional Information Regarding the Cycle Specific SLMCPR for FitzPatrick Cycle 17, December 1, 2004.

A nonproprietary copy of this document has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agency wide Documents Access and Management System Public Electronic Reading Room.

The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

a.

Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GNF-As competitors without license from GNF-A constitutes a competitive economic advantage over other companies; and b.

Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Jens G. M. Andersen Therefore, Additional Information Regarding the Cycle Specific SLMCPR [Safety Limit Minimum Critical Power Ratio] for FitzPatrick Cycle 17, December 1, 2004, marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1457.

Sincerely,

/RA/

Patrick D. Milano, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-333 cc: See next page

ML050310285 OFFICE PDI-1/PM PDI-1/LA SRXB PDI-1/SC NAME PMilano SLittle FAkstulewicz RLaufer DATE 01/26/05 01/27/05 01/18/05 01/28/05

FitzPatrick Nuclear Power Plant cc:

Mr. Gary J. Taylor Chief Executive Officer Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213 Mr. John T. Herron Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Theodore A. Sullivan Site Vice President Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 Mr. Kevin J. Mulligan General Manager, Plant Operations Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 Mr. Danny L. Pace Vice President, Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Brian OGrady Vice President, Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Resident Inspector's Office James A. FitzPatrick Nuclear Power Plant U. S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Michael J. Colomb Director of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. William Maquire Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 Mr. Andrew Halliday Manager, Regulatory Compliance Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126 Mr. Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271

FitzPatrick Nuclear Power Plant cc:

Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Oswego County Administrator Mr. Steven Lyman 46 East Bridge Street Oswego, NY 13126 Mr. Peter R. Smith, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Paul Eddy New York State Dept. of Public Service 3 Empire State Plaza Albany, NY 12223-1350 Mr. John M. Fulton Assistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Ken L. Graesser BWR SRC Consultant 38832 N. Ashley Drive Lake Villa, IL 60046 Mr. Jim Sniezek Nuclear Management Consultant 5486 Nithsdale Drive Salisbury, MD 21801 Mr. Ron Toole BWR SRC Consultant 1282 Valley of Lakes Box R-10 Hazelton, PA 18202 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.

639 Loyola Avenue Mail Stop L-ENT-15E New Orleans, LA 70113 Mr. T. A. Sullivan Site Vice President Entergy Nuclear Operations, Inc.

P. O. Box 110 Lycoming, NY 13093 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601