December 2004 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 and 2
ML050250179
Person / Time
Site: Susquehanna  
Issue date: 01/12/2005
From: Saccone R
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-005855
Download: ML050250179 (7)


Text

%I I

p p 3m.

TM Robert A. Saccone Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3959 Fax 570.542.1504 RASaccone@pplweb.com January 12,2005 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-PI-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-3881NPF-22 PLA-005855 The December 2004 Monthly Operating Reports for Susquehanna.SES Units 1 and 2 are attached.

Very truly yours, Robert

. Saccone JJH/cmm cc: NRC Region I NRC Sr. Resident Inspector, Mr. A. Blarney NRC Project Manager, Mr. R V. Guzman

:e Ca q

S OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 01/12/2005 J. J. Hennings (570) 542-3747 OPERATING STATUS 1.

2.

3.

4.

Unit Name:

Susquehanna Steam Electric Station (U 1)

Reporting Period:

December 2004 Design Electrical Rating (Net MWe):

1177*

Maximum Dependable Capacity (Net MWe):

1135*

5.

6.

7.

8.

9.

Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 744 744 744 0

865,443 Yr.-to-Date 8784 7503.2 7360 0

8,027,004 Cumulative 189,073.0 157,988.0' 155,599.5 0

160,640,442 NOTES:

  • Design Electrical Rating (DER) and Maximum Dependable Capacity (MDC) has been changed starting with the May reporting period due to turbine modifications that were completed in April.

Page 1 of I

UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 01112/2005 J. J. Hennings (570) 542-3747 REPORT MONTH December 2004 No.

Date Type Duration Reason Method of Cause & Corrective Action I

(Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 No Reactor shutdowns this month Summary: There was only one power change greater than 20% this month. This was a planned reduction to 70% for a Sequence Exchange on 12/05/04. 100% power was achieved on 12/06/04.

1.

F. Forced S. Scheduled 2.

Reason:

A -Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain) 3.

Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other Page 1 of 1

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:

50-387 Completed by:

J. J. Hennings Challenges to Main Steam Safety Relief Valves None.

Date:

01/12/05 Telephone:

(570) 542-3747

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 01/12/05 J. J. Hennings (570) 542-3747 OPERATING STATUS

5.

Unit Name:

Susquehanna Steam Electric Station (U2)

6.

Reporting Period:

December 2004

7.

Design Electrical Rating (Net MWe):

1182

8.

Maximum Dependable Capacity (Net MWe):

1140

5.

Hours in Reporting Period

6.

Number of Hours Reactor Was Critical

7.

Hours Generator On-Line

8.

Unit Reserve Shutdown Hours

9.

Net Electrical Energy Generated (MWH)

NOTES:

This Month 744 744 744 0

858,610 Yr.-to-Date 8784 8784 8784 0

10,057,129 Cumulative 174,313 152,679.8 150,692.6 0

158,815,140 Page 1 of 1

.4%

UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 01/12/05 J. J. Hennings (570) 542-3747 REPORT MONTH December 2004 No.

Date Type Duration Reason Method of Cause & Corrective Action I

(Hours) 2 Shutting to Prevent Recurrence Down Reactor 3

No shutdowns this month.

Summary: All significant power changes this month were planned power reductions for control rod adjustments: 12/04/04, to 80%,12/11/04, to 80%, 12/18/04, to 75%,12/21/04, to 88% and 12/25/04, to 77%.

1.

2.

3.

F. Forced S. Scheduled Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Page 1 of I

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:

50-388 Completed by:

J. J. Hennings Date:

01112/05 Telephone:

(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.