ML050250179
| ML050250179 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 01/12/2005 |
| From: | Saccone R Susquehanna |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| PLA-005855 | |
| Download: ML050250179 (7) | |
Text
%I I
p p 3m.
TM Robert A. Saccone Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3959 Fax 570.542.1504 RASaccone@pplweb.com January 12,2005 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-PI-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-3881NPF-22 PLA-005855 The December 2004 Monthly Operating Reports for Susquehanna.SES Units 1 and 2 are attached.
Very truly yours, Robert
. Saccone JJH/cmm cc: NRC Region I NRC Sr. Resident Inspector, Mr. A. Blarney NRC Project Manager, Mr. R V. Guzman
:e Ca q
S OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 01/12/2005 J. J. Hennings (570) 542-3747 OPERATING STATUS 1.
2.
3.
4.
Unit Name:
Susquehanna Steam Electric Station (U 1)
Reporting Period:
December 2004 Design Electrical Rating (Net MWe):
1177*
Maximum Dependable Capacity (Net MWe):
1135*
5.
6.
7.
8.
9.
Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 744 744 744 0
865,443 Yr.-to-Date 8784 7503.2 7360 0
8,027,004 Cumulative 189,073.0 157,988.0' 155,599.5 0
160,640,442 NOTES:
- Design Electrical Rating (DER) and Maximum Dependable Capacity (MDC) has been changed starting with the May reporting period due to turbine modifications that were completed in April.
Page 1 of I
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 01112/2005 J. J. Hennings (570) 542-3747 REPORT MONTH December 2004 No.
Date Type Duration Reason Method of Cause & Corrective Action I
(Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 No Reactor shutdowns this month Summary: There was only one power change greater than 20% this month. This was a planned reduction to 70% for a Sequence Exchange on 12/05/04. 100% power was achieved on 12/06/04.
1.
F. Forced S. Scheduled 2.
Reason:
A -Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain) 3.
Method:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other Page 1 of 1
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-387 Completed by:
J. J. Hennings Challenges to Main Steam Safety Relief Valves None.
Date:
01/12/05 Telephone:
(570) 542-3747
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 01/12/05 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 5.
Unit Name:
Susquehanna Steam Electric Station (U2)
- 6.
Reporting Period:
December 2004
- 7.
Design Electrical Rating (Net MWe):
1182
- 8.
Maximum Dependable Capacity (Net MWe):
1140
- 5.
Hours in Reporting Period
- 6.
Number of Hours Reactor Was Critical
- 7.
Hours Generator On-Line
- 8.
Unit Reserve Shutdown Hours
- 9.
Net Electrical Energy Generated (MWH)
NOTES:
This Month 744 744 744 0
858,610 Yr.-to-Date 8784 8784 8784 0
10,057,129 Cumulative 174,313 152,679.8 150,692.6 0
158,815,140 Page 1 of 1
.4%
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 01/12/05 J. J. Hennings (570) 542-3747 REPORT MONTH December 2004 No.
Date Type Duration Reason Method of Cause & Corrective Action I
(Hours) 2 Shutting to Prevent Recurrence Down Reactor 3
No shutdowns this month.
Summary: All significant power changes this month were planned power reductions for control rod adjustments: 12/04/04, to 80%,12/11/04, to 80%, 12/18/04, to 75%,12/21/04, to 88% and 12/25/04, to 77%.
1.
2.
3.
F. Forced S. Scheduled Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction Method:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Page 1 of I
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-388 Completed by:
J. J. Hennings Date:
01112/05 Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.