December 2004 Monthly Operating Report for Calvert Cliffs Nuclear Power Plant Units 1 & 2
ML050240038
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/14/2005
From: Nietmann K
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML050240038 (8)


Text

Kevin J. Nietmann Plant General Manager 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410.495.4101 410.495.4787 Fax Constellation Energy Calvert Cliffs Nuclear Power Plant January 14, 2005 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

SUBJECT:

Document Control Desk Calvert Cliffs Nuclear Power Plant Unit Nos. I & 2; Docket Nos. 50-317 & 50-318 December 2004 Operating Data Reports The subject reports are being sent to you as required by Technical Specification 5.6.4.

Should you have questions regarding this matter, we will be pleased to discuss them with you.

Very truly yours, K

n. ie t mann Plant General Manager KJN/CAN/bjd Attachments cc:

J. Petro, Esquire J. E. Silberg, Esquire R. V. Guzman, NRC S. J. Collins, NRC Resident Inspector, NRC R. 1. McLean, DNR S. Mainieri, INPO K. N. Larson, ANI 1-r

ATTACHMENT (1)

DECEMBER 2004 OPERATING DATA REPORTS Calvert Cliffs Nuclear Power Plant, Inc.

January 14,2005

I OPERATING DATA REPORT Docket No. 50-3 17 Calvert Cliffs Unit I January 3, 2005 Prepared by Herman 0. Olsen Telephone: (410) 495-6734 REPORTING PERIOD DESIGN ELECTRICAL RATING (NET MWe)

MAXIMUM DEPENDABLE CAP'Y (NET MWe)

DECEMBER 2004 845 870 Year-Cumulative to-Date to Date This month

1. NUMBER OF HOURS REACTOR WAS CRITICAL ;
2. HOURS GENERATOR ON LINE
3. UNIT RESERVE SHUTDOWN HOURS
4. NET ELECTRICAL ENERGY GENERATED (MWH) 744.0 8,074.9 744.0 8,035.1 0.0 0.0 667,686 6,973,982 200,124.3 196,920.8 0.0 161,673,697

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-317 Calvert Cliffs - Ul January 3. 2005 Herman 0. Olsen (410) 495-6734 REPORTING MONTH December 2004 TYPE METHOD OF CAUSEICORRECTIVE ACTIONS NO.

DATE F:

FORCED REASONN SHUTTING S:

SCHEDULED (H

)

DOWN 2 COMMENTS There were no shutdowns this month.

1 Reason:

A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error H - Other 2

Method:

1 - Manual 2 - Manual Scram.

3 - Automatic Scram.

4 - Continued 5 - Other

DOCKET NO. 50-317 CALVERT CLIFFS - UNIT I January 3, 2005

SUMMARY

OF OPERATING EXPERIENCE December 2004 The unit began the month at 100% reactor power.

On 12/18/2004 at 0001 power was reduced to 85% for Main Turbine Valve testing for the stop, control and intermediate valves. Testing was completed and reactor power was returned to 100% at 0215.

The unit operated at 100% power for the remainder of the month.

OPERATING DATA REPORT Docket No. 50-318 Calvert Cliffs Unit 2 January 3, 2005 Prepared by Herman 0. Olsen Telephone: (410) 495-6734 REPORTING PERIOD DESIGN ELECTRICAL RATING (NET MWe)

MAXIMUM DEPENDABLE CAP'Y (NET MWe)

DECEMBER 2004 845 858 Year-Cumulative to-Date to Date This month

1. NUMBER OF HOURS REACTOR WAS CRITICAL
2. HOURS GENERATOR ON LINE
3. UNIT RESERVE SHUTDOWN HOURS
4. NET ELECTRICAL ENERGY GENERATED (MWH) 744.0 744.0 0.0 655,534 8,734.4 8,729.6 0.0 7,552,198 193,461.2 191,567.8 0.0 158,295,488

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-318 Calvert Cliffs-U2 Januarv 3. 2005 Hermnn 0 Olsen (410) 495-6734

\\

REPORT MONTH December 2004 TYPE METHOD OF CAUSE/CORRECTIVE ACTIONS NO.

DATE F:

FORCED DURATION REASONl SHUTTING S:

SCHEDULED (HOURS)

DOWN 2 COMMENTS There were no shutdowns this month.

l Reason:

A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error H - Other 2 Method:

I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Other

DOCKET NO. 50-318 CALVERT CLIFFS - UNIT 2 January 3, 2005

SUMMARY

OF OPERATING EXPERIENCE December 2004 The unit operated at 100% reactor power for the entire month.