ML050210155

From kanterella
Jump to navigation Jump to search
December 2004 Monthly Operating Report for Watts Bar Nuclear Plant, Unit 1
ML050210155
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 01/14/2005
From: Pace P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML050210155 (3)


Text

Tennessee Valley Authorty, Post Office Box 2000, Spring City, Tennessee 37381-2000 JAN 14 2005 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D. C. 20555 Gentlemen:

In the Matter of

)

Docket No.50-390 Tennessee Valley Authority

)

WATTS BAR NUCLEAR PLANT (WBN) UNIT 1 -

DECEMBER 2004 MONTHLY OPERATING REPORT Provided in the enclosure is the Monthly Operating Report for December 2004, as required by WBN Technical Specification Section 5.9.4.

There are no regulatory commitments in this submittal and should there be questions regarding this letter, please telephone me at (423) 365-1824.

Sincerely, P. L. Pace Manager, Site Licensing And Industry Affairs Enclosure Monthly Operating Report December 2004 cc: See Page 2 Parted on recyIded p

U.S. Nuclear Regulatory Commission Page 2 JAN 1 4 2005 PLP:RAS Enclosure cc:

NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr.

D.

V. Pickett, Project Manager U.S. Nuclear Regulatory Commission MS 07A15 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St.,

SW, Suite 23T85 Atlanta, Georgia 30303

OPERATING DATA REPORT Docket No.

Unit Name:

Date:

Completed By:

Telephone:

Reporting Period:

50-390 WBN Unit 1 January 2, 2004 J. L. Kasten (423) 365-8022 December 2004

1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 1,155.00 1,121.00

3.

Number of Hours the Reactor was Critical

4.

Number of Hours Generator On-line

5.

Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWHrs)

This Month 744.00 744.00 0.00 862,873.40 Yr-to-Date 8,703.53 8,679.55 0.00 9,856,919.99 Cumulative 69,467.40 69,131.96 0.00 76,872,603.66 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit operated at or near 100% power for the month of December 2004.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

Page 1 of 1