Request for Additional Information for the Review of the Point Beach Nuclear Plant, Units 1 and 2, License Renewal Application
ML050130356
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/12/2005
From: Veronica Rodriguez
NRC/NRR/DRIP/RLEP
To: Koehl D
Nuclear Management Co
Rodriguez VM, RLEP/DRIP/NRR, 415-3703
References
Download: ML050130356 (6)


Text

January 12, 2005 Mr. Dennis L. Koehl Site Vice President Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION

Dear Mr. Koehl:

By letter dated February 25, 2004, Nuclear Management Company, LLC, (NMC or the applicant) submitted an application pursuant to 10 CFR Part 54, to renew the operating licenses for Point Beach Nuclear Plant (PBNP), Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application (LRA) and has identified, in the enclosure, areas where additional information is needed to complete the review.

These RAIs were discussed with your staff, Mr. Jim Knorr, and a mutually agreeable date for this response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-3703 or e-mail VMR1@nrc.gov.

Sincerely,

/RA/

Verónica M. Rodríguez, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301

Enclosure:

As stated cc w/encls: See next page

January 12, 2005 Mr. Dennis L. Koehl Site Vice President Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION

Dear Mr. Koehl:

By letter dated February 25, 2004, Nuclear Management Company, LLC, (NMC or the applicant) submitted an application pursuant to 10 CFR Part 54, to renew the operating licenses for Point Beach Nuclear Plant (PBNP), Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application (LRA) and has identified, in the enclosure, areas where additional information is needed to complete the review.

These RAIs were discussed with your staff, Mr. Jim Knorr, and a mutually agreeable date for this response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-3703 or e-mail VMR1@nrc.gov.

Sincerely,

/RA/

Verónica M. Rodríguez, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301

Enclosure:

As stated cc w/encls: See next page DISTRIBUTION: See next page Accession no.: ML050130356 Document Name: E:\\Filenet\\ML050130356.wpd OFFICE PM:RLEP SC:RLEP NAME VRodriguez SLee DATE 1/12/05 1/12/05 OFFICIAL RECORD COPY

Point Beach Nuclear Plant, Units 1 and 2 cc:

Jonathan Rogoff, Esq.

Vice President, Counsel & Secretary Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Mr. Frederick D. Kuester President and Chief Executive Officer We Generation 231 West Michigan Street Milwaukee, WI 53201 James Connolly Manager, Regulatory Affairs Point Beach Nuclear Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241 Mr. Ken Duveneck Town Chairman Town of Two Creeks 13017 State Highway 42 Mishicot, WI 54228 Chairman Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, WI 54241 Mr. Jeffrey Kitsembel Electric Division Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 David Weaver Nuclear Asset Manager Wisconsin Electric Power Company 231 West Michigan Street Milwaukee, WI 53201 John Paul Cowan Executive Vice President & Chief Nuclear Officer Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Douglas E. Cooper Senior Vice President - Group Operations Palisades Nuclear Plant Nuclear Management Company, LLC 27780 Blue Star Memorial Highway Covert, MI 49043 Fred Emerson Nuclear Energy Institute 1776 I Street, NW., Suite 400 Washington, DC 20006-3708 Roger A. Newton 3623 Nagawicka Shores Drive Hartland, WI 53029 James E. Knorr License Renewal Project Nuclear Management Company, LLC 6610 Nuclear Road Point Beach Nuclear Plant Two Rivers, WI 54241

DISTRIBUTION: Ltr to: D. Koehl, NMC, LLC, Re: Point Beach Nuclear Plant, Units 1 and 2, Dated: January 13, 2005 Adams accession no.: ML050130356 HARD COPY RLEP RF M.Morgan, Project Manager E-MAIL:

RidsNrrDrip RidsNrrDe G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski J. Fair RidsNrrDssa RidsNrrDipm D. Thatcher R. Pettis G. Galletti C. Li M. Itzkowitz (RidsOgcMailCenter)

R. Weisman M. Mayfield A. Murphy S. Smith (srs3)

S. Duraiswamy Y. L. (Renee) Li RLEP Staff C. Julian M. Modes J. Vora L. Kozak J. Donohew PMNS Receptionists P. Lougheed, RIII J. Strasma, RIII A. Stone, RIII H. Chernoff W. Ruland C. Marco L. Raghavan T. Mensah OPA

Enclosure POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (LRA)

REQUEST FOR ADDITIONAL INFORMATION (RAI)

Appendix B3.3 Pre-Stressed Concrete Containment Tendon Surveillance Program RAI B3.3-1 Scope of Program: The title of the program is Prestressed Concrete Containment Tendon Surveillance Program, that includes inspection of tendon wires, tendon corrosion protection medium, tendon anchorages, and monitoring of tendon prestressing forces. The scope element only includes monitoring of tendon prestressing forces part of the tendon surveillance.

For the sake of consistency with the scope, the title of the program should be Prestressed Concrete Containment Tendon Force Monitoring Program. The applicant is requested to discuss this inconsistency.

RAI B3.3-2 Preventive Actions: In order to ensure that the tendon prestressing forces are not affected by age related degradation, it is essential that the tendons and their anchorages are not prone to corrosion. Ensuring the coverage of the tendons by qualified corrosion protection medium, and preventing ingress of water from the anchorage areas are the preventive measures. The staff recognizes that these aspects are covered under IWL inspections, the preventive measures need be identified in this program, may be through referencing Sections of B2.1.2 Program.

The applicant is requested to justify the lack of this discussion in this program element.

RAI B3.3-3 The staff finds a reference to 10 CFR 50, Appendix B, and Section 1.4 of the PBNP FSAR acceptable as corrective action process and documentation requirements for Corrective Actions program element. However,Section X.S1 of NUREG-1801, which has been quoted as reference for this program, recommends the corrective actions to be taken as follows: If acceptance criteria are not met, then either systematic retensioning of tendons, or a reanalysis of the containment is warranted to ensure the design adequacy of the containment. The applicant is requested to provide information to justify why the program specific corrective actions should not be added to this element description.

RAI B3.3-4 In Section 15.3.1 of Appendix A of the LRA, the applicant summarizes the program, together with the relevant time limited aging analysis (Section 4.5 of the LRA). The applicants description is qualitative. For the summary to be meaningful, as a minimum, the applicant should provide a Table showing the minimum required prestressing forces and the projected (to 60 years) prestressing forces for each group of tendons which would demonstrate the validity of

the program and the corresponding TLAA results. The applicant is requested to supplement this information in Section 15.3.1 of the UFSAR Supplement.