ML050110469
| ML050110469 | |
| Person / Time | |
|---|---|
| Site: | Point Beach (DPR-024) |
| Issue date: | 01/10/2005 |
| From: | Morgan M NRC/NRR/DRIP/RLEP |
| To: | Koehl D Nuclear Management Co |
| Morgan M, NRR/NRC/DRIP/RLEP, 415-2232 | |
| References | |
| Download: ML050110469 (5) | |
Text
January 10, 2005 Mr. Dennis L. Koehl Site Vice President Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION
Dear Mr. Koehl:
By letter dated February 25, 2004, Nuclear Management Company, LLC, (NMC or the applicant) submitted an application pursuant to 10 CFR Part 54, to renew the operating licenses for Point Beach Nuclear Plant (PBNP), Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application (LRA) and has identified, in the enclosure, areas where additional information is needed to complete the review.
These RAIs were discussed with your staff, Mr. Jim Knorr, and a mutually agreeable date for this response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-2232 or e-mail MJM2@nrc.gov.
Sincerely,
/RA/
Michael J. Morgan, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301
Enclosure:
As stated cc w/encls: See next page
January 10, 2005 Mr. Dennis L. Koehl Site Vice President Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION
Dear Mr. Koehl:
By letter dated February 25, 2004, Nuclear Management Company, LLC, (NMC or the applicant) submitted an application pursuant to 10 CFR Part 54, to renew the operating licenses for Point Beach Nuclear Plant (PBNP), Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application (LRA) and has identified, in the enclosure, areas where additional information is needed to complete the review.
These RAIs were discussed with your staff, Mr. Jim Knorr, and a mutually agreeable date for this response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-2232 or e-mail MJM2@nrc.gov.
Sincerely,
/RA/
Michael J. Morgan, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301
Enclosure:
As stated cc w/encls: See next page DISTRIBUTION: See next page Accession no.: ML050110469 Document Name: E:\\Filenet\\ML050110469.wpd OFFICE PM:RLEP SC:RLEP NAME MMorgan SLee DATE 1/6/05 1/10/05 OFFICIAL RECORD COPY
Point Beach Nuclear Plant, Units 1 and 2 cc:
Jonathan Rogoff, Esq.
Vice President, Counsel & Secretary Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Mr. Frederick D. Kuester President and Chief Executive Officer We Generation 231 West Michigan Street Milwaukee, WI 53201 James Connolly Manager, Regulatory Affairs Point Beach Nuclear Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241 Mr. Ken Duveneck Town Chairman Town of Two Creeks 13017 State Highway 42 Mishicot, WI 54228 Chairman Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, WI 54241 Mr. Jeffrey Kitsembel Electric Division Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 David Weaver Nuclear Asset Manager Wisconsin Electric Power Company 231 West Michigan Street Milwaukee, WI 53201 John Paul Cowan Executive Vice President & Chief Nuclear Officer Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Douglas E. Cooper Senior Vice President - Group Operations Palisades Nuclear Plant Nuclear Management Company, LLC 27780 Blue Star Memorial Highway Covert, MI 49043 Fred Emerson Nuclear Energy Institute 1776 I Street, NW., Suite 400 Washington, DC 20006-3708 Roger A. Newton 3623 Nagawicka Shores Drive Hartland, WI 53029 James E. Knorr License Renewal Project Nuclear Management Company, LLC 6610 Nuclear Road Point Beach Nuclear Plant Two Rivers, WI 54241
DISTRIBUTION: Ltr. To D. Koehl, RAI Re: Point Beach Nuclear Plant, Units 1 and 2, Dated:
January 10, 2005 Accession no.: ML050110469 HARD COPY RLEP RF M. Morgan (PM)
E-MAIL:
RidsNrrDrip RidsNrrDe G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski J. Fair RidsNrrDssa RidsNrrDipm D. Thatcher R. Pettis G. Galletti C. Li M. Itzkowitz (RidsOgcMailCenter)
R. Weisman M. Mayfield A. Murphy S. Smith (srs3)
S. Duraiswamy Y. L. (Renee) Li RLEP Staff P. Lougheed, RIII J. Strasma, RIII A. Stone, RIII H. Chernoff W. Ruland C. Marco L. Raghavan T. Mensah OPA
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (LRA)
REQUEST FOR ADDITIONAL INFORMATION (RAI)
Section 2.3.4 Steam and Power Conversion Systems 2.3.4.2 Feedwater and Condensate System Request for Additional Information (RAI)
RAI 2.3.4.2-4 In a letter dated November 16, 2004, the Nuclear Regulatory Commission'(NRC) requested additional information regarding the Auxiliary Systems (LRA Section 2.3.3) and Steam and other Balance of Plant (BOP) Systems in LRA Sections 2.3.3 and 2.3.4 respectively. PBNP response to this request was submitted to the NRC in Nuclear Management Company, LLC letter dated December 22, 2004. The NRC review of the PBNP response to RAI 2.3.4.2-1 identified two follow-up questions regarding the scoping for the small bore branch piping from the NSR portion of the 16" main feed water header (FW) between the feed regulating valve and the downstream steam generator FW inlet check valve:
1.
Recognizing the NRC would not require a formal HELB evaluation be preformed on piping 1-inch and less, did PBNP perform any evaluation (i.e., walkdown, etc.) to confirm that a break in the branch piping would not impact any safety related equipment in the immediate vicinity of the possible break location?
2.
Please discuss flooding associated with a failure in the branch piping and its impact on safety related equipment.