January 5, 2005
Mr. T. Palmisano
Site Vice President
Monticello Nuclear Generating Plant
Nuclear Management Company, LLC
2807 West County Road 75
Monticello, MN 55362-9637
SUBJECT:
MONTICELLO NUCLEAR GENERATING PLANT
NOTIFICATION OF AN NRC BIENNIAL PROBLEM IDENTIFICATION AND
RESOLUTION INSPECTION 05000263/2005006
Dear Mr. Palmisano:
On January 31, 2005, NRC will begin the required biennial problem identification and resolution
(PI&R) inspection at your Monticello Nuclear Generating Plant. This inspection will be
performed in accordance with the NRC baseline inspection procedure 71152.
Experience has shown that these inspections are extremely resource intensive both for the
NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on
the site and to ensure a productive inspection for both sides, we have enclosed a request for
documents needed for the inspection.
The documents are lists of information, necessary in order to ensure the inspection team is
adequately prepared for the inspection. The documents should be available for on-site review
by the inspection team on January 13, 2005. The inspection team will use the lists to select
additional documents for detailed review. The additional documents should be available to the
team when they return to the site on January 31, 2005, to begin the inspection.
The lead inspector for this inspection is Mr. Ronald Langstaff. If there are any questions about
the material requested, or the inspection in general, please do not hesitate to call Mr. Langstaff
at 630-829-9747, or to contact him by e-mail at ral4@nrc.gov.
T. Palmisano
-2-
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter
and its enclosure will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA by Ronald Langstaff for/
Bruce L. Burgess, Chief
Branch 2
Division of Reactor Projects
Docket Nos. 50-263
License Nos. DPR-22
Enclosure:
Requested Information to Support Problem
Identification and Resolution (P&IR) Inspection
cc w/encl:
J. Cowan, Executive Vice President
and Chief Nuclear Officer
Manager, Regulatory Affairs
J. Rogoff, Vice President, Counsel, and Secretary
Nuclear Asset Manager, Xcel Energy, Inc.
Commissioner, Minnesota Department of Health
R. Nelson, President
Minnesota Environmental Control Citizens
Association (MECCA)
Commissioner, Minnesota Pollution Control Agency
D. Gruber, Auditor/Treasurer,
Wright County Government Center
Commissioner, Minnesota Department of Commerce
Manager - Environmental Protection Division
Minnesota Attorney Generals Office
DOCUMENT NAME: G:\\MONT\\ML050050279.wpd
To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy
OFFICE
RIII
N RIII
E
NAME
RLangstaff
BBurgess
- RLangstaff for
DATE
1/05/05
1/05/05
OFFICIAL RECORD COPY
T. Palmisano
-3-
ADAMS Distribution:
WDR
LMP
RidsNrrDipmIipb
GEG
KGO
SXB3
DRPIII
DRSIII
PLB1
JRK1
Enclosure
Requested Information to Support
Problem Identification and Resolution (PI&R) Inspection
1.
A copy of administrative procedure(s) for the corrective action process, trending
program, quality assurance audit program, self-assessment program, corrective action
effectiveness review program, and industry operating experience review program.
2.
A copy of Quality Assurance audits and/or self-assessments of the corrective action
program completed since November 2003.
3.
Have available for review and use a copy of the QA manual.
4.
Have available for review and use a copy of the Employee Concerns
Program/Ombudsman administrative procedure.
5.
A list of Quality Assurance audits completed since November 2003 with a brief
description of areas where findings were identified.
6.
A list of self-assessments completed since November 2003.
7.
A list of root cause evaluations completed since November 2003.
8.
A list of test failures (Inservice Testing or Technical Specification surveillances) since
November 2003, with a brief description of component/system which failed.
9.
A list of all open significant condition reports (Levels 1 and 2) sorted by significance
level. Include a description of the issue and the significance category.
10.
A list of significant condition reports (Level 1 and 2) closed since November 2003
including a description, significance category, date initiated, date closed, and whether
there is an associated operability evaluation.
11.
A list of condition reports initiated since November 2003 that involve inadequate or
ineffective corrective actions. Include a brief description, status, and significance
category of the issue.
12.
A list of condition reports initiated since November 2003 that identify trends of conditions
adverse to quality. Include a brief description, status, and significance category for each
item.
13.
A copy of any performance indicator reports used to track the corrective action program
effectiveness.
14.
A list of condition reports issued during the past three refueling outages sorted by
system and component. Include a brief description, status, and significance category
for each item.
Enclosure
2
15.
A list of the top ten risk significant systems.
16.
A list of the top ten risk significant components.
17.
A list of all human performance errors since November 2003.
18
List of condition reports issued since November 2003 where the NRC was the identifying
organization.
19.
A list of operability determinations issued since November 2003.
20.
A list of condition reports involving operator work-arounds (including those where
operator work-arounds were part of the solution) since November 2003.