Public Meeting Notice for PSEG, Hope Creek and the NRC Reference Special Inspection Preliminary Findings and Summary Results B Recirculation Pump
ML050040313
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 01/04/2005
From: Cobey E
Reactor Projects Branch 3
To: Barber S, Blough A, Bores R, Cobey E, Dan Collins, Farrar K, Mel Gray, Holden C, John Jolicoeur, Lanning W, Richard Laufer, Diane Screnci, Neil Sheehan
NRC/EDO, Office of Nuclear Reactor Regulation, NRC/NRR/DIPM, NRC/NRR/DLPM, NRC/OGC, NRC Region 1, Division Reactor Projects I, Division of Reactor Safety I
Cobey, Eugene W. RI/DRP/PB3 610-337-5171
References
MN 04-33, Rev 1
Download: ML050040313 (3)


Text

MN No. 04-33 (Revision 1)

U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING January 4, 2005 Licensee:

PSEG Nuclear LLC Facility:

Hope Creek Nuclear Generating Station Docket Nos:

05000354 Date/Time:

January 12, at 7:00 p.m. (Revision 1)

Location:

Bridgeport Holiday Inn One Pureland Dr.

Interstate 295 at Exit 10 Swedesboro, NJ 08085 856-467-3322

Purpose:

This is a NRC-requested management meeting with PSEG, open to public observation, to discuss the results of the NRCs special inspection into the circumstances surrounding the steam leak that occurred on October 10, 2004.

The meeting will also include a discussion of the issues associated with the B reactor recirculation pump and the exhaust piping for the high pressure coolant injection pump. This meeting with PSEG, which was originally scheduled for January 5, 2005, was delayed to allow adequate time for NRC to complete its review of recently provided information associated with operation of the B reactor recirculation pump.

The NRC intends to release the preliminary findings of the special inspection team and the summary results of the NRCs review of the B reactor recirculation pump and high pressure coolant Injection system issues before the meeting. This meeting will be conducted prior to startup of Hope Creek from the ongoing refueling outage.

Background information on the Hope Creek Nuclear Generating Station can be found at the Salem and Hope Creek web-page on the NRCs website at:

www.nrc.gov/reactors/plant-specific-items.html. Specific information on these technical issues can also be found in an ADAMS package, Accession Number ML043480164. ADAMS is accessible at: www.nrc.gov/reading-rm/adams.html.

2 NRC Attendees:

A. Blough, Director, Division of Reactor Projects E. Cobey, Chief, Projects Branch 3, DRP M. Gray, Senior Resident Inspector, Hope Creek R. Lorson, Chief, Materials and Structural Engineering Branch, DRS S. Pindale, Special Inspection Team Leader, NRR E. Imbro, Chief, Mechanical & Civil Engineering Branch, NRR C. Holden, Director, Project Directorate I, NRR D. Collins, Project Manager, Salem and Hope Creek, NRR PSEG Attendees:

C. Bakken, President and Chief Nuclear Officer M. Brothers, Vice President, Site Operations J. Carlin, Vice President, Nuclear Assessment M. Gallagher, Vice President, Engineering and Technical Support C. Perino, Director, Licensing and Nuclear Safety Public Participation:

This is a Category 1 Meeting. The public is invited to observe this meeting. The NRC will answer questions from the public following the business portion of the meeting.

Meeting

Contact:

Eugene Cobey, Chief - Projects Branch 3 610-337-5171 E-mail: ewc@nrc.gov Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by NRC personnel at this meeting should be made known by January 10, 2005, via telephone to the NRC meeting contact.

Approved by: /RA/

Eugene Cobey, Chief Projects Branch 3 Division of Reactor Projects Distribution:

C. Bakken, President and Chief Nuclear Officer PSEG Nuclear LLC J. Lipoti Ph.D., Assistant Director of Radiation Programs, State of New Jersey H. Otto, Ph.D., DNREC Division of Water Resources, State of Delaware Division Secretaries, RI (DRP, DRS, DNMS, DRM, ORA)

Region I Receptionist Region I Docket Room (with concurrences)

3 Distribution: (Via E-Mail):

Executive Director for Operations, OEDO, (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO, (RIDSEDOMAILCENTER)

J. Jolicoeur, Coordinator, OEDO, (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR, (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation (NRR/ADPR), (RIDSNRROD)

Director, Division of Regulatory Improvement Programs, NRR, (RIDSNRRDRIP)

Director, Division of Inspection Program Management, NRR, (RIDSNRRDIPM)

Asst General Counsel Materials Litigation and Enforcement, OGC, (RIDSOGCMAILCENTER)

Director, Division of Licensing Project Management (RIDSNRRDLPM)

C. Holden, NRR R. Laufer, NRR D. Collins, PM, NRR K. Farrar, RI, Regional Counsel A. Blough, Director, DRP W. Lanning, Director, DRS D. Screnci, Sr. Public Affairs Officer, RI N. Sheehan, Public Affairs Officer, RI R. Bores, State Liaison Officer, RI E. Cobey, DRP S. Barber, DRP M. Gray, SRI OEMAIL OEWEB PMNS WEBWORK SISP Review Complete: __EWC________ (Reviewers Initials)

DOCUMENT NAME: E:\\Filenet\\ML050040313.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/PAO RI/DRS NAME SBarber/GSB ECobey/EWC DScrenci/DPS RLorson/RKL DATE 1/04/05 1/04/05 1/04/05 1/04/05 OFFICE RI/DRP NAME ABlough/ARB DATE 1/04/05 OFFICIAL RECORD COPY