Text

January 14, 2005 Mr. Mark E. Warner, Site Vice President c/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874

SUBJECT:

SEABROOK STATION, UNIT NO. 1, REQUEST FOR ADDITIONAL INFORMATION (RAI) RE: LICENSE AMENDMENT REQUEST LAR 03-03 (TAC NO. MC1976)

Dear Mr. Warner:

By letter dated February 4, 2004, FPL Energy Seabrook, LLC submitted a request for changes to the Seabrook Station, Unit No. 1, Technical Specifications (TSs), License Amendment Request 03-03. The proposed changes would correct a non-conservatism in TS Table 3.3-10 in addition to addressing a number of other administrative changes.

The Nuclear Regulatory Commission (NRC) staff is reviewing your submittal and has determined that additional information is required to complete the review. Responses as directed in the enclosure to this letter are necessary in order for the staff to complete its review.

The requested information was discussed with Mr. Michael OKeefe of your staff. The NRC staff requests that you provide responses within 60 days of the date of this letter in order for the NRC to complete its review in a timely manner. If circumstances result in the need to revise the target date, please contact me at (301) 415-1484.

Sincerely,

/RA/

Victor Nerses, Senior Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-443

Enclosure:

Request for Additional Information cc w/encl: See next page

Mr. Mark E. Warner, Site Vice President c/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874

SUBJECT:

SEABROOK STATION, UNIT NO. 1, REQUEST FOR ADDITIONAL INFORMATION (RAI) RE: LICENSE AMENDMENT REQUEST LAR 03-03 (TAC NO. MC1976)

Dear Mr. Warner:

By letter dated February 4, 2004, FPL Energy Seabrook, LLC submitted a request for changes to the Seabrook Station, Unit No. 1, Technical Specifications (TSs), License Amendment Request 03-03. The proposed changes would correct a non-conservatism in TS Table 3.3-10 in addition to addressing a number of other administrative changes.

The Nuclear Regulatory Commission (NRC) staff is reviewing your submittal and has determined that additional information is required to complete the review. Responses as directed in the enclosure to this letter are necessary in order for the staff to complete its review.

The requested information was discussed with Mr. Michael OKeefe of your staff. The NRC staff requests that you provide responses within 60 days of the date of this letter in order for the NRC to complete its review in a timely manner. If circumstances result in the need to revise the target date, please contact me at (301) 415-1484.

Sincerely,

/RA/

Victor Nerses, Senior Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-443

Enclosure:

Request for Additional Information cc w/encl: See next page DISTRIBUTION PUBLIC DCollins GMiller ECoby, RGN-I ACRS VNerses BMarcus CRaynor OGC PDI-2 Reading EMarinos ADAMS Accession Number: ML043620457 OFFICE PDI-2/PE PDI-2/PM PDI-2/LA EEIB-A/SC PDI-2/SC NAME GMiller VNerses CRaynor EMarinos DRoberts DATE 1/11/05 1/11/05 1/11/05 12/22/04 1/13/05 OFFICIAL RECORD COPY

Seabrook Station, Unit No. 1 cc:

Mr. J. A. Stall Mr. Stephen McGrail, Director Senior Vice President, Nuclear and ATTN: James Muckerheide Chief Nuclear Officer Massachusetts Emergency Management Agency Florida Power & Light Company 400 Worcester Road P.O. Box 14000 Framingham, MA 01702-5399 Juno Beach, FL 33408-0420 Philip T. McLaughlin, Attorney General Mr. Peter Brann Steven M. Houran, Deputy Attorney Assistant Attorney General General State House, Station #6 33 Capitol Street Augusta, ME 04333 Concord, NH 03301 Resident Inspector Mr. Bruce Cheney, Director U.S. Nuclear Regulatory Commission New Hampshire Office of Emergency Seabrook Nuclear Power Station Management P.O. Box 1149 State Office Park South Seabrook, NH 03874 107 Pleasant Street Concord, NH 03301 Town of Exeter 10 Front Street Mr. Gene F. St. Pierre Exeter, NH 03823 Station Director Seabrook Station Regional Administrator, Region I FPL Energy Seabrook, LLC U.S. Nuclear Regulatory Commission P.O. Box 300 475 Allendale Road Seabrook, NH 03874 King of Prussia, PA 19406 Mr. M. S. Ross, Managing Attorney Office of the Attorney General Florida Power & Light Company One Ashburton Place, 20th Floor P.O. Box 14000 Boston, MA 02108 Juno Beach, FL 33408-0420 Board of Selectmen Mr. Rajiv S. Kundalkar Town of Amesbury Vice President - Nuclear Engineering Town Hall Florida Power & Light Company Amesbury, MA 01913 P.O. Box 14000 Juno Beach, FL 33408-0420 Ms. Deborah Bell Federal Emergency Management Agency James M. Peschel Region I Regulatory Programs Manager J.W. McCormack P.O. & Seabrook Station Courthouse Building, Room 401 FPL Energy Seabrook, LLC Boston, MA 02109 PO Box 300 Seabrook, NH 03874 Mr. Tom Crimmins Polestar Applied Technology One First Street, Suite 4 Los Altos, CA 94019

Seabrook Station, Unit No. 1 cc:

David Moore Vice President, Nuclear Operations Support Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Marjan Mashhadi Senior Attorney Florida Power & Light Company 801 Pennsylvania Ave., NW Suite 220 Washington, DC 20004

REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED AMENDMENT REQUEST LAR 03-03 SEABROOK STATION, UNIT NO. 1 DOCKET NO. 50-443 By letter dated February 4, 2004, FPL Energy Seabrook, LLC (FPLE) submitted a request for changes to the Seabrook Station, Unit No. 1 (Seabrook), Technical Specifications (TSs),

License Amendment Request (LAR) 03-03. The proposed changes would correct a non-conservatism in TS Table 3.3-10 in addition to addressing a number of other administrative changes. The Nuclear Regulatory Commission staff is reviewing your submittal and has determined that additional information is required to complete the review. Responses to the following are necessary in order for the staff to complete its review:

1. Please provide a description of the valve configuration and flow path involved in both automatic and manual switchover from the injection phase to the recirculation phase. If available, please provide drawings to further clarify this operation.
2. Identify the valves, with their numbers, that are manually repositioned to align the charging/safety injection pumps in series with the residual heat removal pumps to complete the switchover from the injection phase to the recirculation phase.
3. The staff is also reviewing your October 22, 2004, submittal (LAR 04-08), which requests among other things, the revision of the TS 3.3.3.6 allowed outage times, shutdown requirements, and action entry provisions for each instrument function in TS Table 3.3-10. As the requested issue date for LAR 04-08 is before that of LAR 03-03, please address any changes to Table 3.3-10 created by LAR 04-08 that also impacts LAR 03-03.