January 14, 2005 Mr. Mark E. Warner, Site Vice President c/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874
SUBJECT:
SEABROOK STATION, UNIT NO. 1, REQUEST FOR ADDITIONAL INFORMATION (RAI) RE: LICENSE AMENDMENT REQUEST LAR 03-03 (TAC NO. MC1976)
Dear Mr. Warner:
By letter dated February 4, 2004, FPL Energy Seabrook, LLC submitted a request for changes to the Seabrook Station, Unit No. 1, Technical Specifications (TSs), License Amendment Request 03-03. The proposed changes would correct a non-conservatism in TS Table 3.3-10 in addition to addressing a number of other administrative changes.
The Nuclear Regulatory Commission (NRC) staff is reviewing your submittal and has determined that additional information is required to complete the review. Responses as directed in the enclosure to this letter are necessary in order for the staff to complete its review.
The requested information was discussed with Mr. Michael OKeefe of your staff. The NRC staff requests that you provide responses within 60 days of the date of this letter in order for the NRC to complete its review in a timely manner. If circumstances result in the need to revise the target date, please contact me at (301) 415-1484.
Sincerely,
/RA/
Victor Nerses, Senior Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-443
Enclosure:
Request for Additional Information cc w/encl: See next page
Mr. Mark E. Warner, Site Vice President c/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874
SUBJECT:
SEABROOK STATION, UNIT NO. 1, REQUEST FOR ADDITIONAL INFORMATION (RAI) RE: LICENSE AMENDMENT REQUEST LAR 03-03 (TAC NO. MC1976)
Dear Mr. Warner:
By letter dated February 4, 2004, FPL Energy Seabrook, LLC submitted a request for changes to the Seabrook Station, Unit No. 1, Technical Specifications (TSs), License Amendment Request 03-03. The proposed changes would correct a non-conservatism in TS Table 3.3-10 in addition to addressing a number of other administrative changes.
The Nuclear Regulatory Commission (NRC) staff is reviewing your submittal and has determined that additional information is required to complete the review. Responses as directed in the enclosure to this letter are necessary in order for the staff to complete its review.
The requested information was discussed with Mr. Michael OKeefe of your staff. The NRC staff requests that you provide responses within 60 days of the date of this letter in order for the NRC to complete its review in a timely manner. If circumstances result in the need to revise the target date, please contact me at (301) 415-1484.
Sincerely,
/RA/
Victor Nerses, Senior Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-443
Enclosure:
Request for Additional Information cc w/encl: See next page DISTRIBUTION PUBLIC DCollins GMiller ECoby, RGN-I ACRS VNerses BMarcus CRaynor OGC PDI-2 Reading EMarinos ADAMS Accession Number: ML043620457 OFFICE PDI-2/PE PDI-2/PM PDI-2/LA EEIB-A/SC PDI-2/SC NAME GMiller VNerses CRaynor EMarinos DRoberts DATE 1/11/05 1/11/05 1/11/05 12/22/04 1/13/05 OFFICIAL RECORD COPY
Seabrook Station, Unit No. 1 cc:
Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Peter Brann Assistant Attorney General State House, Station #6 Augusta, ME 04333 Resident Inspector U.S. Nuclear Regulatory Commission Seabrook Nuclear Power Station P.O. Box 1149 Seabrook, NH 03874 Town of Exeter 10 Front Street Exeter, NH 03823 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Attorney General One Ashburton Place, 20th Floor Boston, MA 02108 Board of Selectmen Town of Amesbury Town Hall Amesbury, MA 01913 Ms. Deborah Bell Federal Emergency Management Agency Region I J.W. McCormack P.O. &
Courthouse Building, Room 401 Boston, MA 02109 Mr. Tom Crimmins Polestar Applied Technology One First Street, Suite 4 Los Altos, CA 94019 Mr. Stephen McGrail, Director ATTN: James Muckerheide Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399 Philip T. McLaughlin, Attorney General Steven M. Houran, Deputy Attorney General 33 Capitol Street Concord, NH 03301 Mr. Bruce Cheney, Director New Hampshire Office of Emergency Management State Office Park South 107 Pleasant Street Concord, NH 03301 Mr. Gene F. St. Pierre Station Director Seabrook Station FPL Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 Mr. M. S. Ross, Managing Attorney Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 James M. Peschel Regulatory Programs Manager Seabrook Station FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874
Seabrook Station, Unit No. 1 cc:
David Moore Vice President, Nuclear Operations Support Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Marjan Mashhadi Senior Attorney Florida Power & Light Company 801 Pennsylvania Ave., NW Suite 220 Washington, DC 20004
REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED AMENDMENT REQUEST LAR 03-03 SEABROOK STATION, UNIT NO. 1 DOCKET NO. 50-443 By letter dated February 4, 2004, FPL Energy Seabrook, LLC (FPLE) submitted a request for changes to the Seabrook Station, Unit No. 1 (Seabrook), Technical Specifications (TSs),
License Amendment Request (LAR) 03-03. The proposed changes would correct a non-conservatism in TS Table 3.3-10 in addition to addressing a number of other administrative changes. The Nuclear Regulatory Commission staff is reviewing your submittal and has determined that additional information is required to complete the review. Responses to the following are necessary in order for the staff to complete its review:
1.
Please provide a description of the valve configuration and flow path involved in both automatic and manual switchover from the injection phase to the recirculation phase. If available, please provide drawings to further clarify this operation.
2.
Identify the valves, with their numbers, that are manually repositioned to align the charging/safety injection pumps in series with the residual heat removal pumps to complete the switchover from the injection phase to the recirculation phase.
3.
The staff is also reviewing your October 22, 2004, submittal (LAR 04-08), which requests among other things, the revision of the TS 3.3.3.6 allowed outage times, shutdown requirements, and action entry provisions for each instrument function in TS Table 3.3-10. As the requested issue date for LAR 04-08 is before that of LAR 03-03, please address any changes to Table 3.3-10 created by LAR 04-08 that also impacts LAR 03-03.