November 2004 Monthly Operating Report for Perry Unit 1
ML043560187
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 12/14/2004
From: Richard Anderson
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, PY-CEI/NRR-2849L
Download: ML043560187 (3)


Text

FENOC FrstEnergy Nuclear Operating Company Perry Nuclear Power Station 10 Center Road Perry, Ohio 44081 Richard L. Anderson Vice President-Nuclear 440-280-5579 Fax: 440-280-8029 December 14, 2004 PY-CEI/NRR-2849L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant

-Docket-No.r50440-License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached is the November 2004 Monthly Operating Report for Perry Unit 1. Page I is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."

If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

Very truly yours,

--Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector L6-j:a

OPERATING DATA REPORT UNIT:

Perry DATE:

12/6104 1.

2.

3.

4.

5.

6.

7.

Docket: 50-440 Unit Name:

Perry Nuclear Power Plant Reporting Period November 2004 Utility

Contact:

T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Net MWe):

1260 1235

a.

a This Month-. -

8.

Hours Reactor was Critical 720.0

9.

Hours Generator On-Une 720.0

10.

Unit Reserve Shutdown Hours 0.0

11.

Net Electrical Energy (MWeH) 899.444.0 Yr-to-Date 7.737.7 7,707.4 0.0 A 447.543.0 Cumulative 119.982.4 117.218.7 0.0 134.5;75.955.0s v.__

Page 1

UNIT SHUTDOWNS REPORT MONTH - NOVEMBER 2004 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 12/6/04 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.

Date Type Duration Reason Method Cause and Corrective fiction to Prevent Recurrence 1

Hours 2

3 II I'

(

_I__

SUMMARY

The Perry Nuclear Power remained on line the entire month of November. 2004.
1. TYPE:
2. REASON:
3. METHOD:

F: Forced A - Equipment Failure lexplain)

I - Manual S: Scheduled B - Maintenance or Test 2-Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory 4-Continuation E - Operating Training &

5 - Other License Examination F - Administrative G - Operational Error (explain)

H - Other (explain) l Page 2 I