FENOC FrstEnergy Nuclear Operating Company Perry Nuclear Power Station 10 Center Road Perry, Ohio 44081 Richard L. Anderson Vice President-Nuclear 440-280-5579 Fax: 440-280-8029 December 14, 2004 PY-CEI/NRR-2849L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant
-Docket-No.r50440-License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the November 2004 Monthly Operating Report for Perry Unit 1. Page I is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours,
--Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector L6-j:a
OPERATING DATA REPORT UNIT:
Perry DATE:
12/6104 1.
2.
3.
4.
5.
6.
7.
Docket: 50-440 Unit Name:
Perry Nuclear Power Plant Reporting Period November 2004 Utility
Contact:
T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):
Maximum Dependable Capacity (Net MWe):
1260 1235
- a.
a This Month-. -
- 8.
Hours Reactor was Critical 720.0
- 9.
Hours Generator On-Une 720.0
- 10.
Unit Reserve Shutdown Hours 0.0
- 11.
Net Electrical Energy (MWeH) 899.444.0 Yr-to-Date 7.737.7 7,707.4 0.0 A 447.543.0 Cumulative 119.982.4 117.218.7 0.0 134.5;75.955.0s v.__
Page 1
UNIT SHUTDOWNS REPORT MONTH - NOVEMBER 2004 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 12/6/04 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.
Date Type Duration Reason Method Cause and Corrective fiction to Prevent Recurrence 1
Hours 2
3 II I'
(
_I__
SUMMARY
- The Perry Nuclear Power remained on line the entire month of November. 2004.
- 1. TYPE:
- 2. REASON:
- 3. METHOD:
F: Forced A - Equipment Failure lexplain)
I - Manual S: Scheduled B - Maintenance or Test 2-Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory 4-Continuation E - Operating Training &
5 - Other License Examination F - Administrative G - Operational Error (explain)