November 2004 Monthly Operating Report for Turkey Point, Units 3 and 4
ML043560174
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/15/2004
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2004-284
Download: ML043560174 (3)


Text

FPL DEC 1 5 2004 L-2004-284 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - November 2004 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the November 2004 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry 0. Jones Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

IX' an FPL Group company

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-250 Turkey Point Unit 3 12/03/2004 Ronald Everett (305) 246-6190

.I Reporting Period November. 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 l:- Am _---__

_-- -_i-- ;

Maximum Dependable Capacity (MWe-Net) 693 I

'Month Year-to-date Cumulative No. of hours reactor was critical 8.7

-6477.8 209011 No. of hours generator was on line (service hours) 0 6396.7 206537.2 Unit reserve shutdown hours 0

0 121.8 Net Electrical Energy (MWH) 0 4463145 135267790 UNIT SHUTDOWNS (1) Reason (2) Method A-Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G -Operational Error (Explain)

H -Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

Summarv Of Monthlv Operatina Experience Unit 3 has been shut down since September 26, 2004 and was down the entire month of November for the Cycle 21 refueling outage.

I DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-251 Turkey Point Unit 4 12/03/2004 Ronald Everett (305) 246-6190 Reporting Period November, 2004 Design Electrical Rating (MWe-Net) 720

,t

ad Maximum Dependable Capacity (MWe-Net) 693

_1-_"_-______:

Month Year-to-date Cumulative No. of hours reactor was critical 720 7998.9 207418.7 No. of hours generator was on line (service hours) 720 7945.5 202923.9 Unit reserve shutdown hours 0

0 577.2 Net Electrical Energy (MWH) 516763 5569556 134091124 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other 1 - Manual 2-Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of November, 2004.