Text
.
.0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 December 8, 2004 L-2004-284 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:
St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the November 2004 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns for St. Lucie Units 1 and 2.
Please contact us should there be any questions regarding this information.
William Jefferson, Jr.
Vice President St. Lucie Plant WJ/KWF Attachment
.1 an FPL Group company
I.a L-2004-284 Attachment Page 1 of 2 OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-335 St. LucWe 1 December 06, 2004 K. R. Boller (772) 467-7465 November 2004
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 830.00 839.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month 720.00 720.00 0.00 612,408.00 Yr-to-Date 6,840.12 6,775.55 0.00 5,688,053.00 Cumulative 200,384.12 198,485.85 0.00 162,789,000.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action 5: Scheduled (Hours)
Down 2 Comments
SUMMARY
- Unit I operated at essentially full power the entire month. In accordance with Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the reporting period.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic TriplScram 4
Continuation 5
Other (Explain)
L-2004-284 Attachment Page 2 of 2 OPERATING DATA REPORT DOCKET NO.
50-389 UNIT NAME St. Lucie 2 DATE December a COMPLETED BY K.R. 1BoTer TELEPHONE
?77Z) 67-7:
REPORTING PERIOD:
No1 06,200 465
/ember 2004
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 830.00 839.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month 720.00 720.00 0.00 606,899.00 Yr-to-Date 7,496.88 7,477.55 0.00 6,294,242.00 Cumulative 163,533.45 161,600.02 0.00 133,341,218.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason Down 2 Comments
SUMMARY
- Unit 2 operated at essentially full power the entire month. In accordance with Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the reporting period.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)