November 2004 Monthly Operating Report for St. Lucie Units 1 & 2
ML043560169
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 12/08/2004
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2004-284
Download: ML043560169 (3)


Text

.

.0 FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 December 8, 2004 L-2004-284 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:

St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the November 2004 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

William Jefferson, Jr.

Vice President St. Lucie Plant WJ/KWF Attachment

.1 an FPL Group company

I.a L-2004-284 Attachment Page 1 of 2 OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-335 St. LucWe 1 December 06, 2004 K. R. Boller (772) 467-7465 November 2004

1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 830.00 839.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 720.00 720.00 0.00 612,408.00 Yr-to-Date 6,840.12 6,775.55 0.00 5,688,053.00 Cumulative 200,384.12 198,485.85 0.00 162,789,000.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action 5: Scheduled (Hours)

Down 2 Comments

SUMMARY

Unit I operated at essentially full power the entire month. In accordance with Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the reporting period.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic TriplScram 4

Continuation 5

Other (Explain)

L-2004-284 Attachment Page 2 of 2 OPERATING DATA REPORT DOCKET NO.

50-389 UNIT NAME St. Lucie 2 DATE December a COMPLETED BY K.R. 1BoTer TELEPHONE

?77Z) 67-7:

REPORTING PERIOD:

No1 06,200 465

/ember 2004

1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 830.00 839.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 720.00 720.00 0.00 606,899.00 Yr-to-Date 7,496.88 7,477.55 0.00 6,294,242.00 Cumulative 163,533.45 161,600.02 0.00 133,341,218.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason Down 2 Comments

SUMMARY

Unit 2 operated at essentially full power the entire month. In accordance with Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the reporting period.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)