ML043550121

From kanterella
Jump to navigation Jump to search
ISFSI, Confirmation of Implementation of April 29, 2003 Orders
ML043550121
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 12/16/2004
From: Grecheck E
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
04-729A, EA-02-038, EA-03-039, EA-03-086
Download: ML043550121 (4)


Text

VIRGINIA ELECTRIC AND POWER COMPANY

RICHMOND, VIRGINIA 23261 December 16,2004 Re: 10 CFR 2.202 10 CFR 50.4 U.S. Nuclear Regulatory Commission Serial No.:

04-729A Attention: Document Control Desk NL&OS/MAE: R1 Washing ton, D. C. 20555-0001 Docket Nos.: 50-338/339 License Nos.: NPF-4/7 72-1 6 SNM-2507 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1.2 AND ISFSI CONFIRMATION OF IMPLEMENTATION OF APRIL 29.2003 ORDERS The NRC issued Orders dated April 29, 2003: EA-02-038, Order for Compensatory Measures Related to Fitness-For-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel; EA-03-039, Order for Compensatory Measures Related to Training Enhancements on Tactical and Firearms Proficiency and Physical Fitness Applicable to Armed Nuclear Power Plant Security Force Personnel; and EA-03-086, Order Requiring Compliance with Revised Design Basis Threat (collectively referred to as Orders) for the North Anna Power Station. In addition to other requirements, the Orders required nuclear power plant licensees to revise their Physical Security Plan, Safeguards Contingency Plan, and Training and Qualification Plan; submit those plans to the NRC for approval by April 29, 2004; and complete implementation of those plans by October 29, 2004, unless a request for a schedule extension for one or more elements of those plans was approved by the NRC.

On April 26, 2004, Virginia Electric and Power Company (Dominion) filed a Supplemental Response to Order EA-03-086 that contained the Physical Security Plan, the Safeguards Contingency Plan, and the Training and Qualification Plan as required by Order EA-03-086 for North Anna Power Station (Serial No.04-242). Dominion later revised the submittal based on NRC requests for additional information and resubmitted revised plans on September 9, 2004 (Serial No. 04-242A) and again on October 15, 2004 (Serial No. 04-242B).

Dominion also requested a schedule extension until January 21, 2005 for the implementation of the Physical Security Plan and Safeguards Contingency Plan in a September 20, 2004 letter (Serial No.04-575).

By letters dated October 29, 2004, the NRC issued a Safety Evaluation Report documenting the NRCs review and acceptance of those plans as well as the NRCs assessment of Dominions September 20, 2004 schedule extension request. Dominion provided comments on the SER in a December 9, 2004 letter (Serial No.04-687).

Section 1II.C. of Order EA-03-086 required Dominion to advise the NRC when implementation of the NRC approved Physical Security Plan, Safeguards Contingency Plan,

Serial No. 04-729A NAPS Completion of Order EA 03-086 Page 2 of 4 and Training and Qualification Plan had been accomplished. Section lll.C.2. of Order EA-03-039 required Dominion to advise the NRC when full compliance with the requirements in to that Order had been achieved.

Dominion hereby certifies that the implementation of the NRC approved Physical Security Plan, Safeguards Contingency Plan, and Training and Qualification Plan has been met and the exercise of enforcement discretion pursuant to the Order during the transition period will no longer be necessary. The NRC was notified in a November 3, 2004 letter (Serial No.04-657) that North Anna had already implemented the requirements in Attachment 2 to Order EA-03-039.

If you have any questions, please contact Ms. Margaret Earle at 804-273-2768.

Very truly yours, Eugene S. Grecheck Vice President - Nuclear Support Services Commitments made by this letter: None

Serial No. 04-729A NAPS Completion of Order EA 03-086 Page 3 of 4 Docket Nos.: 50-3381339 72-1 6 COMMONWEALTH OF VIRGINIA

)

1 COUNTY OF HENRICO

)

The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Eugene S. Grecheck who is Vice President-Nuclear Support Services of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this / L ?day of/(h!t-h/

My Commission Expires:.

,2004.

Notary Public (SEAL)

Serial No. 04-729A NAPS Completion of Order EA 03-086 Page 4 of 4 cc:

Director of Nuclear Security Office of Nuclear Security and Incident Response U. S. Nuclear Regulatory Commission Two White Flint North 11 545 Rockville Pike Rockville, MD 20852-2738 Secretary, Office of the Secretary of the Commission U. S. Nuclear Regulatory Commission ATTN: Rulemakings and Adjudications Staff Washington, D. C. 20555 Director, Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Assistant General Counsel for Materials Litigation and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303-8931 Ms. M. J. Ross-Lee U. S. Nuclear Regulatory Commission, Mail Stop 0 13 D13 Washington, D. C. 20555 Mr. S. R. Monarque NRC Project Manager North Anna and Surry U. S. Nuclear Regulatory Commission, Mail Stop 8 HI2 Washington, D. C. 20555 Mr. M. T. Widmann NRC Senior Resident Inspector North Anna Power Station