Technical Specifications, Amendment Elimination of Requirements for Hydrogen/Oxygen Monitors
ML043450244
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/08/2004
From: Milano P
NRC/NRR/DLPM/LPD1
To:
References
TAC MC3675
Download: ML043450244 (3)


Text

PAM Instrumentation 3.3.3.1 3.3 INSTRUMENTATION 3.3.3.1 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.3.1 APPLICABILITY:

The PAM instrumentation for each Function in Table 3.3.3.1-1 shall be OPERABLE.

MODES 1 and 2.

I ACTIONS NOTES

1. LCO 3.0.4 is not applicable.
2. Separate Condition entry is allowed for each Function.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions A.1 Restore required 30 days with one required channel to OPERABLE channel inoperable.

status.

B. Required Action and B.1 Initiate action in Immediately associated Completion accordance with Time of Condition A Specification 5.6.6.

.not met.

C. One or more Functions C.1 Restore one required 7 days with two required channel to OPERABLE channels inoperable.

status.

(continued)

JAFNPP 3.3.3.1-1 Amendment 280

PAM Instrumentation 3.3.3.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.3.1.2 Perform CHANNEL CALIBRATION of each 24 months required PAM instrumentation channel.

I JAFNPP 3.3.3.1-3 Amendment 280

PAM Instrumentation 3.3.3.1 Table 3.3.3.1-1 (page 1 of 1)

Post Accident Monitoring Instrumentation CONDITIONS REFERENCED REQUIRED FROM REQUIRED FUNCTION CHANNELS ACTION D.1

1. Reactor Vessel Pressure 2

E

2. Reactor Vessel Water Level
a. Fuel Zone 2

E

b. Wide Range 2

E

3. Suppression Pool Water Level (Wide Range) 2 E
4. Drywell Pressure
a. Narrow Range 2

E

b. Wide Range 2

E

5. Containment High Range Radiation 2

F

6. Drywell Temperature 2

E

7. Penetration Flow Path PCIV Position 2 pe ppenet n flw E
8. Suppression Chamber Pressure 2

E

9. Suppression Pool Water Temperature 2

E

10. Drywell Water Level 2

E (a)

Not required for isolation valves whose associated penetration flow path is isolated by at least one closed and deactivated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured.

(b) Only one position indication channel is required for penetration flow paths with only one installed control room indication channel.

JAFNPP 3.3.3.1-4 Amendment 280