ML043380133

From kanterella
Jump to navigation Jump to search
Deferring Completion of the Six-month On-Site Responsible Nuclear Power Plant Experience
ML043380133
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 11/30/2004
From: Moorman J
Operator Licensing and Human Performance Branch
To: Stall J
Florida Power & Light Co
References
Download: ML043380133 (3)


Text

November 30, 2004 Florida Power and Light Company ATTN: Mr. J. A. Stall, Senior Vice President Nuclear and Chief Nuclear Officer P. O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

DEFERRING COMPLETION OF THE SIX-MONTH ON-SITE RESPONSIBLE NUCLEAR POWER PLANT EXPERIENCE

Dear Mr. Stall:

This is in response to your letter (L-2004-141) dated July 14, 2004, requesting deferral of completion of the six months on-site responsible nuclear power plant experience until after the licensing examination is passed for the applicants in the upcoming SRO license class for St.

Lucie. Your waiver request as discussed per telcon during the week of July 26, 2004, with Lisa Edwards has been denied.

As described in ACAD 00-003, Guidelines for Initial Training and Qualification of Licensed Operators, and in Reg Guide 1.8, Qualification and Training of Personnel for Nuclear Power Plants, the onsite experience requirements are to be met prior to being eligible for licensing training. Furthermore, NUREG 1021, ES-202, section D notes that experience and training are separate aspects of license eligibility. As stated in NUREG-1262 (in response to question No.

113), a person should meet the experience guidelines before entering the license training program.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Absent any scheduling conflicts or special circumstances requiring training to begin before the onsite experience is completed, we will not approve this request. If you have any questions regarding the NRC's decision in this matter, please contact Mr. Ronald F. Aiello at (404) 562-4641, (Internet E-mail: rfa@nrc.gov), or me at (404) 562-4647, (Internet E-mail:

jhm2@nrc.gov).

Sincerely,

/RA/

James H. Moorman, III, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Docket Nos. 50-335, 50-389 License Nos. DPR-67, NPF-16 cc: (See page)

FP&L 2 cc cont'd:

William Jefferson, Jr. William A. Passetti Site Vice President Bureau of Radiation Control St. Lucie Nuclear Plant Department of Health Florida Power & Light Company Electronic Mail Distribution Electronic Mail Distribution Craig Fugate, Director G. L. Johnston Division of Emergency Preparedness Plant General Manager Department of Community Affairs St. Lucie Nuclear Plant Electronic Mail Distribution Electronic Mail Distribution J. Kammel Terry L. Patterson Radiological Emergency Licensing Manager Planning Administrator St. Lucie Nuclear Plant Department of Public Safety Electronic Mail Distribution Electronic Mail Distribution David Moore, Vice President Douglas Anderson Nuclear Operations Support County Administrator Florida Power & Light Company St. Lucie County Electronic Mail Distribution 2300 Virginia Avenue Ft. Pierce, FL 34982 Rajiv S. Kundalkar Vice President - Nuclear Engineering Ms. Lisa Edwards Florida Power & Light Company Training Manager Electronic Mail Distribution St. Lucie Nuclear Plant 6351 South Ocean Drive M. S. Ross, Managing Attorney Jensen Beach, FL 34957 Florida Power & Light Company Electronic Mail Distribution Marjan Mashhadi, Senior Attorney Florida Power & Light Company Electronic Mail Distribution

FP&L 3 Distribution:

E. Brown, NRR C. Evans (Part 72 Only)

L. Slack, RII EICS RIDSNRRDIPMLIPB PUBLIC OFFICE RII:DRS RII:DRS RII:DRP SIGNATURE /RA/ /RA/ /RA/

NAME RAiello:pmd JMoorman JMunday DATE 11/16/04 11/16/04 11/30/04 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC DOCUMENT YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: E:\Filenet\ML043380133.wpd