December 3, 2004 Mr. Daniel J. Malone Site Vice President Palisades Nuclear Plant Nuclear Management Company, LLC 27780 Blue Star Memorial Highway Covert, MI 49043-9530
SUBJECT:
PALISADES PLANT - REVIEW OF THE REACTOR PRESSURE VESSEL SURVEILLANCE CAPSULE W-100 REPORT (TAC NO. MC2746)
Dear Mr. Malone:
By letter dated March 25, 2004, Nuclear Management Company (the licensee), submitted a reactor pressure vessel (RPV) surveillance capsule report for Capsule W-100 to Nuclear Regulatory Commission (NRC) in accordance with the requirement in Title 10 of the Code of Federal Regulations Part 50, Appendix H. Capsule W-100 was withdrawn from the RPV of Palisades, on March 28, 2003. The NRC staffs review of the submittal focused on two subjects: (1) to verify and compile the new and revised information on surveillance data in a format ready for Reactor Vessel Integrity Database (RVID) updating, and (2) to perform the chemistry factor calculation based on the added surveillance data to update the RVID. Impacts of the capsule results on pressurized thermal shock, upper shelf energy, and pressure-temperature limits were not evaluated at this time and a complete evaluation will be performed during the license renewal application process (expected in March 2005).
The NRC staff has completed its review of the licensees surveillance report and found it acceptable. The NRC staff verified and compiled the new surveillance data for Capsule W-100 and generated the enclosed table for updating the RVID.
Sincerely,
/RA/
David H. Jaffe, Acting Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-255
Enclosure:
Table cc w/encl: See next page
ML043370011 OFFICE PDIII-1/(A)PM PDIII-1/LA TECH BR PDIII-1/SC NAME DJaffe THarris SCoffin LRaghavan DATE 12/02/04 12/02/04 11/15/04 12/03/04
ENCLOSURE DOCUMENTATION AND EVALUATION OF ALL SURVEILLANCE DATA NUCLEAR MANAGEMENT COMPANY, LLC PALISADES PLANT DOCKET NO. 50-255 Material*
Capsule Fluence (10E19 n/cm 2)
FF (Fluence Factor)
RTNDT (EF) (a)
-CFxFF (EF) (b)
Credible?
Meas
.USE (ft-lb)
Plate-L D3803-1 W-290
.926
.976 176.8 172.56
.953 31.61 No 112.3 W-110 1.66 1.14 179.5 204.63 1.3 9.92 Yes 102.7 W-100 2.09 1.2 159.1 190.92 1.44
-19.4 No 102 A-240 4.01 1.36 205.1 278.94 1.85 2.77 Yes 92.3 Plate-T D3803-1 W-290
.926
.976 158 154.21
.953 12.8 Yes 83.8 W-100 2.09 1.2 142.5 171.0 1.44
-36.
No 73 A-240 4.01 1.36 194.3 264.25 1.85
-8.02 Yes 68.4 Sum:
1436.51 9.656 CFCF-D3803-1=1436.51/9.656=148.77 0 F Surveilla nce Weld Material (Heat#32 77)
W-290
.926
.976 286 279.14
.953 29.26 No 63 W-110 1.66 1.14 304.8 347.47 1.3 4.92 Yes 57.8 W-100 2.09 1.2 305.4 366.48 1.44
-10.26 Yes 51.8 A-240 4.01 1.36 341.9 464.98 1.85
-15.85 Yes 50.8 Sum:
1458.07 5.543 CF Surv. Weld=1458.07/5.543=263.05 0 F(c)
Notes:
- a. RTNDT values are measured.
- b. Predicted RTNDT is based on CF*FF. For example, CF for plate, CF=148.77 and FF=0.976 and thus predicted RTndt is 148.77*0.976=145.19. Hence the scatter is 176.8-145.19=31.61.
- c. CF for weld is 263.05. However, the vessel heat number and capsule heat number are different and this CF should not be used for evaluating RV integrity.
Palisades Plant cc:
Robert A. Fenech, Senior Vice President Nuclear, Fossil, and Hydro Operations Consumers Energy Company 1945 Parnall Rd.
Jackson, MI 49201 Arunas T. Udrys, Esquire Consumers Energy Company 1 Energy Plaza Jackson, MI 49201 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Supervisor Covert Township P. O. Box 35 Covert, MI 49043 Office of the Governor P. O. Box 30013 Lansing, MI 48909 U.S. Nuclear Regulatory Commission Resident Inspector's Office Palisades Plant 27782 Blue Star Memorial Highway Covert, MI 49043 Michigan Department of Environmental Quality Waste and Hazardous Materials Division Hazardous Waste and Radiological Protection Section Nuclear Facilities Unit Constitution Hall, Lower-Level North 525 West Allegan Street P.O. Box 30241 Lansing, MI 48909-7741 Michigan Department of Attorney General Special Litigation Division 525 West Ottawa St.
Sixth Floor, G. Mennen Williams Building Lansing, MI 48913 Manager, Regulatory Affairs Nuclear Management Company, LLC 27780 Blue Star Memorial Highway Covert, MI 49043 Director of Nuclear Assets Consumers Energy Company Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 John Paul Cowan Executive Vice President & Chief Nuclear Officer Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Jonathan Rogoff, Esquire Vice President, Counsel & Secretary Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Douglas E. Cooper Senior Vice President - Group Operations Palisades Nuclear Plant Nuclear Management Company, LLC 27780 Blue Star Memorial Highway Covert, MI 49043 October 2003