December 1, 2004

Mr. Daniel J. Malone

Site Vice President

Palisades Nuclear Plant

Nuclear Management Company, LLC

27780 Blue Star Memorial Highway

Covert, MI 49043-9530

SUBJECT:

PALISADES NUCLEAR PLANT

NOTIFICATION OF AN NRC TRIENNIAL FIRE PROTECTION BASELINE

INSPECTION 05000255/2005003(DRS)

Dear Mr. Malone:

On January 10, 2005, the NRC will begin a triennial fire protection baseline inspection at the

Palisades Nuclear Plant. This inspection will be performed in accordance with the NRC

baseline Inspection Procedure 71111.05.

The schedule for the inspection is as follows:

Information gathering visit: December 20 - 22, 2004

On-site inspection activity: January 10 - 14, 2005 and January 24 - 28, 2005

The purpose of the information gathering visit is: (1) to obtain information and documentation

needed to support the inspection; (2) to become familiar with the Palisades Nuclear Plant fire

protection programs, fire protection features, post-fire safe shutdown capabilities and plant

layout; and (3) to arrange administrative details such as office space, availability of

knowledgeable office personnel and to ensure unescorted site access privileges.

Experience has shown that the baseline fire protection inspections are extremely resource

intensive both for the NRC inspectors and the licensee staff. In order to minimize the

inspection impact on the site and to ensure a productive inspection for both organizations, we

have enclosed a request for documents needed for the inspection. These documents have

been divided into four groups. The first group lists information necessary to aid the inspection

team in choosing specific focus areas for the inspection. It is requested that this information be

provided to the lead inspector via mail or electronically no later than December 6, 2004. The

second group lists information necessary to ensure that the inspection team is adequately

prepared for the inspection. This information should be available on-site no later than

December 20, 2004. The third group of requested documents are those items that the team will

review, or need access to, during the inspection. Please have this information available by the

first day of the on-site portion of the inspection (January 10, 2005). The fourth group lists

information necessary to aid the inspection team in tracking issues identified as a result of the

inspection. It is requested that this information be provided to the lead inspector as the

D. Malone

-2-

information is generated during the inspection. It is important that all of these documents are

up to date and complete in order to minimize the number of additional documents requested

during the preparation and/or the on-site portions of the inspection.

The lead inspector for this inspection is Mr. George Hausman. We understand that our

regulatory contact for this inspection is Ms. Barb Dotson of your organization. If there are any

questions about the inspection or the material requested, please contact the lead inspector at

(630) 829-9743 or via e-mail at gmh1@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Julio F. Lara, Chief

Electrical Engineering Branch

Division of Reactor Safety

Docket No. 50-255

License No. DPR-20

Enclosure:

Fire Protection Inspection Document Request

cc w/encl:

J. Cowan, Executive Vice President

and Chief Nuclear Officer

R. Fenech, Senior Vice President, Nuclear

Fossil and Hydro Operations

D. Cooper, Senior Vice President - Group Operations

Manager, Regulatory Affairs

J. Rogoff, Vice President, Counsel and Secretary

A. Udrys, Esquire, Consumers Energy Company

Director of Nuclear Assets, Consumers Energy Company

Supervisor, Covert Township

Office of the Governor

Michigan Department of Environmental Quality -

Waste and Hazardous Materials Division

Michigan Department of Attorney General

D. Malone

-2-

information is generated during the inspection. It is important that all of these documents are

up to date and complete in order to minimize the number of additional documents requested

during the preparation and/or the on-site portions of the inspection.

The lead inspector for this inspection is Mr. George Hausman. We understand that our

regulatory contact for this inspection is Ms. Barb Dotson of your organization. If there are any

questions about the inspection or the material requested, please contact the lead inspector at

(630) 829-9743 or via e-mail at gmh1@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Julio F. Lara, Chief

Electrical Engineering Branch

Division of Reactor Safety

Docket No. 50-255

License No. DPR-20

Enclosure:

Fire Protection Inspection Document Request

cc w/encl:

J. Cowan, Executive Vice President

and Chief Nuclear Officer

R. Fenech, Senior Vice President, Nuclear

Fossil and Hydro Operations

D. Cooper, Senior Vice President - Group Operations

Manager, Regulatory Affairs

J. Rogoff, Vice President, Counsel and Secretary

A. Udrys, Esquire, Consumers Energy Company

Director of Nuclear Assets, Consumers Energy Company

Supervisor, Covert Township

Office of the Governor

Michigan Department of Environmental Quality -

Waste and Hazardous Materials Division

Michigan Department of Attorney General

DOCUMENT NAME: E:\\Filenet\\ML043360326.wpd

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy

OFFICE

RIII

E RIII

RIII

RIII

NAME

GHausman:tr

EDuncan

JLara

DATE

11/30/04

11/30/04

12/01/04

OFFICIAL RECORD COPY

D. Malone

-3-

ADAMS Distribution:

WDR

DFT

JFS2

RidsNrrDipmIipb

GEG

HBC

KGO

JAL3

DRPIII

DRSIII

PLB1

JRK1

INITIAL DOCUMENT REQUEST

Enclosure

1

FIRE PROTECTION INSPECTION DOCUMENT REQUEST

Inspection Report: 05000255/2005003(DRS)

Inspection Dates:

December 20 - 22, 2004

(Information Gathering)

January 10 - 14, 2005

(On-site Inspection Activity)

January 24 - 28, 2005

(On-site Inspection Activity)

Inspection Procedures:

IP 71111.05, Fire Protection

IP 71152, "Identification and Resolution of Problems"

Inspectors:

Lead Inspector:

George M. Hausman

Team Members:

Audrey L. Klett

Darrell L. Schrum

Information Requested Prior to the Information Gathering Visit

The following information is requested by December 6, 2004. If you have any questions

regarding this information, please call the lead inspector as soon as possible. All information

may be sent electronically (to Mr. George M. Hausman, e-mail address gmh1@nrc.gov) or

provided on compact disc (preferred method).

(1)

The reactor plant's Individual Plant Examination for External Events (IPEEE) for fire,

results of any post-IPEEE reviews for fire, and listings of actions taken/plant

modifications conducted in response to IPEEE information for fire. Alternatively,

probabilistic risk analyses for fire and associated information, if it exists and is more

recent than the IPEEE.

(2)

A list of fire areas requiring alternative shutdown capability, i.e., those areas for which

10 CFR Part 50, Appendix R, Section III.G requirements are satisfied under

Section III.G.3.

Information Requested During the Information Gathering Visit (December 20 - 22, 2004)

This information is requested to be available on-site during the information gathering visit.

(1)

The current version of the Fire Protection Program and Fire Hazards Analysis.

(2)

Listing of plant fire protection licensing basis documents.

(3)

Copies of the NRC Safety Evaluation Reports (SERs) and of the 50.59 reviews which

form the licensing basis for the reactor plant's post-fire safe shutdown configuration.

(4)

A list of Generic Letter 86-10 evaluations.

INITIAL DOCUMENT REQUEST

Enclosure

2

(5)

A list of applicable codes and standards related to the design of plant fire protection

features. The list should include National Fire Protection Association (NFPA) code

versions committed to (i.e., the NFPA codes of record).

(6)

A list of plant deviations from code commitments.

(7)

Post-fire safe shutdown analyses, including post-fire safe shutdown systems and

separation analysis.

(8)

Piping and instrumentation (flow) diagrams showing the components used to achieve

and maintain hot standby and cold shutdown for fires outside the control room and those

components used for those areas requiring alternative shutdown capability.

(9)

Plant layout and equipment drawings which identify the physical plant locations of hot

standby and cold shutdown equipment for selected fire zones/areas (to be determined

during information gathering visit).

(10)

Plant layout drawings which identify plant fire area delineation, areas protected by

automatic fire suppression and detection, and the locations of fire protection equipment

for selected fire zones/areas (to be determined during information gathering visit).

(11)

Listing of open and closed fire protection condition reports (problem identification forms

and their resolution reports) for the past three years.

(12)

Listing of fire impairments for the previous year.

(13)

Pre-fire plans for selected fire zones/areas (to be determined during information

gathering visit).

(14)

Plant operating procedures which would be used and describe shutdown for a

postulated fire in selected fire zones/areas (to be determined during information

gathering visit).

(15)

A listing of the protection methodologies identified under 10 CFR Part 50, Appendix R,

Section III.G used to achieve compliance for selected fire zones/areas (to be

determined during information gathering visit). That is, please specify whether 3-hour

rated fire barriers (Section III.G.2.a), 20-foot separation along with detection and

suppression (Section III.G.2.b), 1-hour rated fire barriers with detection and suppression

(Section III.G.2.c), or alternative shutdown capability (Section III.G.3) is used for each

selected fire zone/area.

(16)

One-line schematic drawings of the electrical distribution system for 4160 Volts -

alternating current (Vac) down to 480 Vac.

(17)

One-line schematic drawings of the electrical distribution system for 250 Volts - direct

current (Vdc) and 125 Vdc systems as applicable.

INITIAL DOCUMENT REQUEST

Enclosure

3

(18)

A listing of abbreviations/designators for plant systems.

(19)

Organization charts of site personnel down to the level of fire protection staff personnel.

(20)

A phone list for on-site licensee personnel.

In addition, during the information gathering visit, it is requested that licensee staff be available

for the following:

(1)

Informal discussion on plant procedures operators would use in the event of fire and

under what conditions would the plant be shutdown using alternative shutdown

methodology.

(2)

Informal discussion on the plants safe shutdown cable routing database and the plant-

wide cable routing database, as applicable.

(3)

A tour of alternative shutdown and risk significant fire areas.

Information Requested to be Available on First Day of Inspection (January 10, 2005)

(1)

List of the fire protection program implementing procedures (e.g., administrative

controls, surveillance testing, fire brigade).

(2)

List of maintenance and surveillance testing procedures for alternative shutdown

capability and fire barriers, detectors, pumps and suppression systems.

(3)

List of maintenance procedures which routinely verify fuse breaker coordination in

accordance with the post-fire safe shutdown coordination analysis.

(4)

List of procedures/instructions that control the configuration of the reactor plant's fire

protection program, features, and post-fire safe shutdown methodology and system

design.

(5)

List of procedures/instructions that govern the implementation of plant modifications,

maintenance, and special operations, and their impact on fire protection.

(6)

Coordination calculations and/or justifications that verify fuse/breaker coordination for

selected fire zones/areas (to be determined during information gathering visit) that are

fed off of the same electrical buses as components in the protected safe shutdown train.

(7)

Copies of significant fire protection and post-fire safe shutdown related design change

package descriptions (including their associated 10 CFR 50.59 evaluations) and Generic Letter (GL) 86-10 evaluations.

(8)

Gaseous suppression system pre-operational testing, if applicable, for selected fire

zones/areas (to be determined during information gathering visit).

Enclosure

4

(9)

Hydraulic calculations and supporting test data which demonstrate operability for water

suppression systems, if applicable, for selected fire zones/areas (to be determined

during information gathering visit).

(10)

Alternating current (AC) coordination calculations for 4160 Vac down to 480 Vac

electrical systems.

(11)

The three most recent fire protection Quality Assurance (QA) audits and/or fire

protection self-assessments.

(12)

Corrective action documents (e.g., condition reports, including status of corrective

actions) generated as a result of the three most recent fire protection Quality Assurance

(QA) audits and/or fire protection self-assessments.

Information Requested to Be Provided Throughout the Inspection

(1)

Copies of any corrective action documents generated as a result of the teams questions

or queries during this inspection.

(2)

Copies of the list of questions submitted by the team members and the status/resolution

of the information requested (provide daily during the inspection to each team member).