Initial Examination Corporate Notification Letter No. 50-186/OL-05-01, University of Missouri-Columbia
ML043360181
Person / Time
Site: University of Missouri-Columbia
Issue date: 12/03/2004
From: Doyle P
NRC/NRR/DRIP/RNRP
To: Rhonda Butler
Univ of Missouri - Columbia
Doyle P, NRC/NRR/DRIP/RNRP, 415-1058
Shared Package
ML043350356 List:
References
50-186/OL-05-01 50-186/OL-05-01
Download: ML043360181 (7)


Text

December 3, 2004 Mr. Ralph A. Butler, Chief Operating Officer Research Reactor Facility University of Missouri Columbia, MO 65211

SUBJECT:

INITIAL EXAMINATION CORPORATE NOTIFICATION LETTER NO. 50-186/OL-05-01, UNIVERSITY OF MISSOURI - COLUMBIA

Dear Mr. Butler:

I made arrangements with Michael Dixon for the administration of operator licensing examinations at the University of Missouri - Columbia reactor. The written and operating examinations are scheduled for the week of February 14, 2005.

In order to meet this schedule, I will use the reference material you supplied for the August, 2004 examination. Please furnish any updates to this material as soon as possible to the following address:

(U.S. Postal Service)

(Overnight Delivery)

U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission ATTN: Paul Doyle ATTN: Paul Doyle Mail Stop O-12 G-13 Mail Stop O-12 G-13 Washington, D.C. 20555 11555 Rockville Pike Rockville, MD 20852-2738, "Facility Licensee Responsibilities for Written Examinations," describes your responsibilities for conducting written examinations. Enclosure 2, "Applicant Responsibilities for the Written Examination," describes applicant responsibilities during the administration of the written examination. Please ensure that all applicants are aware of these rules.

Your review of the written examination will be conducted in accordance with the procedures specified in Enclosure 3, "Facility Review of Written Examinations."

Final, signed senior reactor operator license applications certifying that all training has been completed must be submitted at least 14 days before the first examination dates. This will allow the chief examiner time to review the training and experience of the applicants, process the medical certifications, and process the applications. If the review cannot be completed in time to determine an applicant's eligibility, that applicant may not be permitted to sit for the examination. Therefore, it is recommended that license applications be provided as soon as possible to ensure an appropriate level of review.

Mr. R. Butler The NRC has copies of t Licensee (NRC form 398) and Certificate of Medical History by Facility Licensee (NRC form 396) available on t located at www.nrc.gov/reading-www.nrc.gov/reading-rm/doc-collec This request is covered by Office of Man 3150-0018, which expires June 30, 2006.

response, including gathering, xeroxing and m regarding this burden estimate or any other aspe suggestions for reducing this burden, to the Record Regulatory Commission, Washington, D.C. 20555-00

<bjs1@nrc.gov>, and to the Desk Officer, Office of Infor NEOB-10202, (3150-0018), Office of Management and Bu If you have any questions regarding the examination procedure contact me at (301) 415-1058, or Internet e-mail pvd@nrc.gov.

Sincerely,

/RA/

Paul Doyle, Chief Examiner Research and Test Reactors Section New, Research and Test Reactors Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No. 50-186

Enclosures:

1.

Facility Licensee Responsibilities for Written Examinations 2.

Applicant Responsibilities for Written Examinations 3.

Facility Review of Written Examinations Prior to Administration cc w/enclosures: Michael Dixon, University of Missouri - Columbia

Mr. R. Butler The NRC has copies of t Licensee (NRC form 398) and Certificate of Medical History by Facility Licensee (NRC form 396) available on t located at www.nrc.gov/reading-www.nrc.gov/reading-rm/doc-collec This request is covered by Office of Man 3150-0018, which expires June 30, 2006.

response, including gathering, xeroxing and m regarding this burden estimate or any other aspe suggestions for reducing this burden, to the Record Regulatory Commission, Washington, D.C. 20555-00

<bjs1@nrc.gov>, and to the Desk Officer, Office of Infor NEOB-10202, (3150-0018), Office of Management and Bu If you have any questions regarding the examination procedure contact me at (301) 415-1058, or Internet e-mail pvd@nrc.gov.

Sincerely,

/RA/

Paul Doyle, Chief Examiner Research and Test Reactors Section New, Research and Test Reactors Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No. 50-186

Enclosures:

1.

Facility Licensee Responsibilities for Written Examinations 2.

Applicant Responsibilities for Written Examinations 3.

Facility Review of Written Examinations Prior to Administration cc w/enclosures: Michael Dixon, University of Missouri - Columbia DISTRIBUTION:

PUBLIC RNRP/R&TR r/f PMadden Facility File (EBarnhill) O-6 F-2 WBeckner AAdams, PM EXAMINATION PACKAGE #: ML043350356 ADAMS ACCESSION #: ML043360181 TEMPLATE #: NRR-079 OFFICE:

R&TR:CE IROB:LA R&TR:SC NAME:

PDoyle EBarnhill PMadden DATE:

12/ 1 /2004 12/ 2 /2004 12/ 2 /2004 C = COVER E = COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY

ENCLOSURE 1 FACILITY LICEN 1.

The facility licensee is written examination. The lo such as to prevent contact wit 2.

Minimum spacing is necessary to en Examiner (i.e., one applicant per table, w 3.

The facility may make arrangements subject to to have lunch, coffee or other refreshments. These above.

4.

The facility licensee may provide pads of 8-1/2 by 11 inch lin for each applicant's use in completing the examination. The exa pads to the applicants as needed.

5.

Applicants may bring pens, pencils, calculators and slide rules into the e Only black ink or dark pencils should be used for writing answers to question 6.

The Chief Examiner must approve any wall charts, models, or other training mater present in the examination room. No other equipment or reference material will be allo unless provided by the examiner.

7.

The facility staff will be provided a copy of the written examination with answer key at the beginning of the administration of the written examination. The facility staff may start reviewing the examination immediately. The facility staff will then have five (5) working days to provide formal written comments with supporting documentation regarding written examination questions and answers to the Chief Examiner.

Please NOTE: All arrangements are subject to Chief Examiner review.

ENCLOSURE 2 APPLICANT RES 1.

You must provide a p 2.

You must not review your e 3.

Cheating on the examination me result in more severe penalties.

4.

When you have completed your examin of the cover sheet, prior to handing in the exa 5.

Only one applicant may leave the room for a trip contact with anyone outside the examination room to possibility of cheating. NOTE: The examiner/proctor m one applicant of each sex.

6.

Use black ink or dark pencil only to facilitate legible reproduc 7.

Print your name in the blank provided in the upper right-hand corn cover sheet and each answer sheet.

8.

Mark your answers on the answer sheet provided.

9.

The point value for each question is shown in [brackets] after the question.

10.

If the intent of a question is unclear, ask questions of the examiner only.

11.

When turning in your examination, assemble the completed examination with examinatio questions, examination aids and answer sheets. In addition, turn in all scrap paper.

12.

You must achieve a grade of 70 percent or greater in each category to pass the examination.

13.

There is a time limit of one hour per section of the examination. A one section examination has a one hour time limit, a two section examination has a two hour time limit and a three section examination has a three hour time limit.

14.

After turning in your examination, leave the examination area (DEFINE THE AREA). If you are observed in this area while the examination is still in progress, your license may be denied or revoked.

ENCLOSURE 3 FACILITY REVIE 1.

At the option of the Pro facility may review the writte review may take place at the f coordinate the details of the revie present during the review. The exa facility.

Whenever this option of examination review following statement prior to being allowed acc a.

Pre-Examination Security Agreement I ______________________ acknowledge that I have a concerning the examination scheduled for

___________________ as of the date of my signature below knowingly divulge any information concerning this examination t persons. I understand that I am not to participate in any instructio applicants scheduled to be administered the above examination from the examination has been administered. I further understand that violat conditions of this agreement may result in the examinations being cancelle enforcement action against myself or the facility licensee by whom I am emp represent.

Signature/Date In addition, the facility staff reviewers will sign the following statement after the written examination has been administered.

b.

Post-Examination Security Agreement I _________________ did not, to the best of my knowledge, divulge any information concerning the examinations administered during the week of

____________________________ at ____________________ or any instruction to those applicants who were administered the examination from the date I entered into this security agreement until the completion of examination administration.

Signature/Date 2.

Regardless of wheth following the administrati marked-up copy of the exam examination includes pen and administration.

If the facility did not review the examin working days from the day of the written facility reviewed the examination prior to its be given to an examiner prior to his/her leavin addressed to the Chief Examiner by the Reactor within the required time frame will be considered fo case-by-case basis. This may cause delays in gradin 3.

The following format should be used for submittal of spe a.

Listing of NRC question, answer and reference b.

Facility comment/recommendation c.

Reference (to support facility comment)

NOTES:

1.

No change to the examination will be made without a reference to su facility comment. Any supporting documentation that was not previously supplied, should be provided.

2.

Comments made without a concise facility recommendation will not be addressed.

3.

A two-hour post examination review may be held at the discretion of the Chief Examiner. If this review is held, the facility staff should be informed that only written comments that are properly supported will be considered in the grading of the examination.