ML043340144
| ML043340144 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 11/26/2004 |
| From: | Ann Marie Stone Division of Reactor Safety III |
| To: | Nazar M American Electric Power Co |
| References | |
| Download: ML043340144 (3) | |
Text
November 26, 2004 Mr. M. Nazar Senior Vice President and Chief Nuclear Officer Nuclear Generation Group American Electric Power Company 500 Circle Drive Buchanan, MI 49107
Dear Mr. Nazar:
This letter confirms the discussion between our staffs to have a Public Meeting on December 15, 2004, at 2:00 p.m. EST, in the first floor conference room of the American Electric Power Company building in Buchanan, MI. The purpose of this meeting is to present the results of the NRCs license renewal inspections conducted in accordance with Inspection Procedure 71002.
The public is invited to observe this meeting and will have an opportunity to speak with the NRC after the discussion of the inspection results are completed, but before the meeting is adjourned.
I will gladly discuss any questions you may have concerning this matter.
Sincerely,
/RA/
Ann Marie Stone, Chief Systems Engineering Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc:
J. Jensen, Site Vice President M. Finissi, Plant Manager G. White, Michigan Public Service Commission Michigan Department of Environmental Quality Emergency Management Division MI Department of State Police D. Lochbaum, Union of Concerned Scientists
November 26, 2004 Mr. M. Nazar Senior Vice President and Chief Nuclear Officer Nuclear Generation Group American Electric Power Company 500 Circle Drive Buchanan, MI 49107
Dear Mr. Nazar:
This letter confirms the discussion between our staffs to have a Public Meeting on December 15, 2004, at 2:00 p.m. EST, in the first floor conference room of the American Electric Power Company building in Buchanan, MI. The purpose of this meeting is to present the results of the NRCs license renewal inspections conducted in accordance with Inspection Procedure 71002.
The public is invited to observe this meeting and will have an opportunity to speak with the NRC after the discussion of the inspection results are completed, but before the meeting is adjourned.
I will gladly discuss any questions you may have concerning this matter.
Sincerely,
/RA/
Ann Marie Stone, Chief Systems Engineering Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc:
J. Jensen, Site Vice President M. Finissi, Plant Manager G. White, Michigan Public Service Commission Michigan Department of Environmental Quality Emergency Management Division MI Department of State Police D. Lochbaum, Union of Concerned Scientists DOCUMENT NAME: ML043340144.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII NAME LKozak EDuncan AMStone DATE 11/23/04 11/23/04 11/26/04 OFFICIAL RECORD COPY
T. Nazar ADAMS Distribution:
WDR DFT JGL1 RidsNrrDipmIipb GEG HBC KGO BJK1 DRPIII DRSIII PLB1 JRK1