Similar Documents at Ginna |
---|
Category:License-Operator
MONTHYEARRS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23247A0092022-09-28028 September 2022 Final QA Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20329A4322020-11-17017 November 2020 Final Qa/Related Forms (Folder 1) ML20329A4422020-09-17017 September 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20329A1812020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test Outlines (Folder 2) ML20329A1412020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20322A3502020-09-17017 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20321A2792020-09-17017 September 2020 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML20328A1622020-09-17017 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20328A2792020-09-17017 September 2020 Handouts to Applicants (Folder 3) ML20328A2912020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20329A2002020-08-26026 August 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML22103A2232020-08-26026 August 2020 Revised Draft Written Examination and Operating Test Outlines (2022 Regional Audit Corrective Action) (Folder 2) ML20329A2392020-07-22022 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20329A2232020-07-22022 July 2020 Draft Written Examination (Folder 2) ML20329A3542020-07-22022 July 2020 Licensee 75-Day Letter Transmitting the Draft Written Exam and Operating Test Material (Folder 2) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323D1722019-11-18018 November 2019 R. E. Ginna Nuclear Power Plant - Senior Reactor and Reactor Operator Initial License Examinations ML21041A2942019-10-0303 October 2019 Original Questions for Modified Written Exam Questions RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri ML18353A6082018-12-18018 December 2018 Senior Reactor Operator Retake License Examinations ML18344A5852018-12-10010 December 2018 R. E. Ginna - Reactor Operator Retake License Examinations ML19119A1472018-10-30030 October 2018 Final Qa/Related Forms (Folder 1) ML19156A1482018-08-27027 August 2018 Final Qa/Related Form - ES-201-1 (Folder 1) ML18233A5092018-08-21021 August 2018 Operator Licensing Operating Test Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17272A3242017-09-28028 September 2017 R. E. Ginna - Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17114A2862017-04-21021 April 2017 Miscellaneous Exam Material (Folder 1) ML17114A2172017-04-21021 April 2017 Final Qa/Related Forms (Folder 1) ML17114A3172017-04-21021 April 2017 Handouts to Applicants (Folder 3) ML17123A1722017-04-14014 April 2017 Post Exam Comments Resolution References (Folder 1) ML17114A3752017-03-0909 March 2017 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML17114A1562017-03-0909 March 2017 Final Qa/Related Forms - ES-401 (Folder 1) ML17114A3812017-03-0909 March 2017 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML17066A2272017-03-0707 March 2017 Initial Operator Licensing Operating Test Approval: R. E. Ginna Nuclear Power Plant ML17104A2162017-03-0707 March 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17104A2012017-03-0303 March 2017 Final Operating Test (Sections a, B, and C) (Folder 3) ML17114A4232017-01-19019 January 2017 Draft Written Exam (Folder 2) ML17114A4372017-01-19019 January 2017 Draft Operating Exam (Section a, Section B, Section C) (Folder 2) ML17114A3522017-01-19019 January 2017 Final Outlines (Folder 3) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17114A4112016-12-0909 December 2016 Draft - Outlines (Folder 2), (Facility Letter. Dtd ML16286A4132016-10-11011 October 2016 Senior Reactor and Reactor Operator Initial License Examinations - )R.E. Ginna Nuclear Power Plant) ML15156A5522015-01-21021 January 2015 Final Qa/Related Forms (Folder 1) ML15043A6812014-12-16016 December 2014 Final Operating Exam (Sections a, B, and C) (Folder 3) 2023-06-16
[Table view] Category:Part 55 Examination Related Material
MONTHYEARRS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23247A0092022-09-28028 September 2022 Final QA Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20329A4322020-11-17017 November 2020 Final Qa/Related Forms (Folder 1) ML20329A4422020-09-17017 September 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20329A1812020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test Outlines (Folder 2) ML20329A1412020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20328A2792020-09-17017 September 2020 Handouts to Applicants (Folder 3) ML20321A2792020-09-17017 September 2020 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML20322A3502020-09-17017 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20328A1622020-09-17017 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20328A2912020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML22103A2232020-08-26026 August 2020 Revised Draft Written Examination and Operating Test Outlines (2022 Regional Audit Corrective Action) (Folder 2) ML20329A2002020-08-26026 August 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20329A2392020-07-22022 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20329A2232020-07-22022 July 2020 Draft Written Examination (Folder 2) ML20329A3542020-07-22022 July 2020 Licensee 75-Day Letter Transmitting the Draft Written Exam and Operating Test Material (Folder 2) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323D1722019-11-18018 November 2019 R. E. Ginna Nuclear Power Plant - Senior Reactor and Reactor Operator Initial License Examinations ML21041A2942019-10-0303 October 2019 Original Questions for Modified Written Exam Questions RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18353A6082018-12-18018 December 2018 Senior Reactor Operator Retake License Examinations ML18344A5852018-12-10010 December 2018 R. E. Ginna - Reactor Operator Retake License Examinations ML19119A1472018-10-30030 October 2018 Final Qa/Related Forms (Folder 1) ML19156A1482018-08-27027 August 2018 Final Qa/Related Form - ES-201-1 (Folder 1) ML18233A5092018-08-21021 August 2018 Operator Licensing Operating Test Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17272A3242017-09-28028 September 2017 R. E. Ginna - Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17114A2862017-04-21021 April 2017 Miscellaneous Exam Material (Folder 1) ML17114A2172017-04-21021 April 2017 Final Qa/Related Forms (Folder 1) ML17114A3172017-04-21021 April 2017 Handouts to Applicants (Folder 3) ML17123A1722017-04-14014 April 2017 Post Exam Comments Resolution References (Folder 1) ML17114A3752017-03-0909 March 2017 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML17114A1562017-03-0909 March 2017 Final Qa/Related Forms - ES-401 (Folder 1) ML17114A3812017-03-0909 March 2017 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML17104A2162017-03-0707 March 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17066A2272017-03-0707 March 2017 Initial Operator Licensing Operating Test Approval: R. E. Ginna Nuclear Power Plant ML17104A2012017-03-0303 March 2017 Final Operating Test (Sections a, B, and C) (Folder 3) ML17114A4232017-01-19019 January 2017 Draft Written Exam (Folder 2) ML17114A4372017-01-19019 January 2017 Draft Operating Exam (Section a, Section B, Section C) (Folder 2) ML17114A3522017-01-19019 January 2017 Final Outlines (Folder 3) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17114A4112016-12-0909 December 2016 Draft - Outlines (Folder 2), (Facility Letter. Dtd ML16286A4132016-10-11011 October 2016 Senior Reactor and Reactor Operator Initial License Examinations - )R.E. Ginna Nuclear Power Plant) ML15156A5522015-01-21021 January 2015 Final Qa/Related Forms (Folder 1) ML15043A6792014-12-16016 December 2014 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML15043A6802014-12-16016 December 2014 Handouts to Applicants (Folder 3) 2023-06-16
[Table view] |
Text
ES-401 PWR Examination Outline Form ES-401-2 Facilitv: R E Ginna Printed: 09/22/2004 Date Of Exam: 11/01/2004 I I RO WA Category Point! I SRO-Only Points
- 3. Generic Knwledge And Abilities Categories Note:
- 1. Ensure that at least two topics from every WA category are sampled within each tier of the RO outline (Le., the "Tier Totals" in each WA category shall not be less than two). Refer to Section D.1.c for additional guidance regarding the SRO sampling.
- 2. The point total for each group and tier in the proposed outline must match that specified in the table. The final point total for each group and tier may deviate by *1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SROonly exam must total 25 points.
- 3. Select topics from many systems and evolutions; avoid selecting more than two WA topics from a given system unless they relate to plant-specific priorities.
- 4. Systemslevolutionswithin each group are identified on the associated outline.
- 5. The shaded areas are not applicable to the category Aier.
6.' The generic (G)WAS in Tiers 1 and 2 shall be selected from Section 2 of the WA Catalog, but the topics must be relevant to the applicable evolution or system. The SRO WAS must also be linked to 10 CFR 55.43 or an SRO-level learning objective.
- 7. On the fdlwing pages, enter the WA numbers, a brief description of each topic, the topics' importance ratings (IR) for the applicable license level, and the point totals for each system and category. Enter the group and tier totals for each category in the columns labeled "K" and "A.
. . I . . .I -.
Use duplicate pages for RO and SRO-only exams.
- 8. For Tier 3, enter the WA numbers, descriptions, importance ratings, and point totals on Form ES-401-3.
- 9. Refer to ES-401, Attachment 2, for guidance regardingthe elimination of inappropriate WA statements.
1
PWR SRO Examination Outline Printed: 09/22/2004 Facility: R E Ginna Imp. Points
. a000 151000017 RCP Malfunctions I 4 X 2.1.32 - Ability to explain and apply all 3.8 1 000022 Loss of Rx Coolant Makeup 12 X system limits and precautions.
AA2.04 How long PZR level can be
- 3.8 1 1 maintained within limits 000026 Loss of Component Cooling Water I X AA2.04- The normal values and upper 2.9* 1 8 limits for the temperatures of the components cooled by CCW 000027 Pressurizer Pressure Control System X 2.1.32 - Ability to explain and apply all 3.8 1 Malfunction t 3 system limits and precautions.
000055 Station Blackout / 6 X -
EA2.06 Faults and lockouts that must 4.1 1 be cleared prior to re-energizing buses 000057 Loss of Vital AC Inst. Bus 16 X 2.4.30 - Knowledge of which events 3.6 1 related to system opemtionslstatus should be reported to outside agencies.
WE05 Inadequate Heat Transfer Loss of X EA21 - Facility conditions and 4.4 1 Secondary Heat Sink t 4 selection of appropriate procedures during abnormal and emergency operations W A Category Totals: 0 0 0 4 3 Group Poi1 : Total:
- 7 1
PWR SRO Examination Outline Printed 09/22/2004 Facility: R E GiMa ES 401 -
Emergency and Abnormal Plant Evolutions Tier 1 /Group 2 Form ES-401-2
' Y/APE # / Name / Safety Function
. do0069 Loss of CTMT Integrity / 5 IKllK2lK3 A1 A2 G KATopic Imp. Points AA2.02 - Verification of automatic and 000076 High Reactor Coolant Activity 19 I I I X manual means of restoring integrity AA2.07 When demineralizerresin 4.4 2.7*
1 I
needs to be replaced X 2.4.4 - Ability to recognize abnormal 4.3 1 indications for system operating parameters which are entry-level conditions for emergency and abnormal operating procedures.
X 2.1.32 - Ability to explain and apply all 3.8 1 system limits and precautions.
EA2.2 Adherence to appropriate 3.8 1 procedures and operation within the limitations in the facility's license and amendments WACategoryTotals: I 0 I 0I 0 01 31 21 Group Point Total: 5 1
P W R SRO Examination Outline Printed: 09/22/2004 Facility: R E Ginna w.c - Ani Y.., .Y*
Plant Systems Tier 2 / Group 1 Form ES-401-2 I
9ys/Evol# / Name K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G KATopic Imp. Points 004 Chemical and Volume Control X 2.1.33 - Ability to recognize 4.0 1 indications for system operating parameters which are entry-level conditions for technical specifications.
013 Engineered Safety Features X A2.03 - Rapid 4.7 1 Actuation depressurization 022 Containment Cooling X -
A2.01 Fan motor 2.7 1 over-current 064 Emergency Diesel Generator -
X 2.1.33 Ability to recognize 4.0 1 indications for system operating parameters which are entry-level conditions for technical specifications.
WACategory Totals: 0 0 0 0 0 0 0 2 0 0 2 Group Point Total: 4 1
P W R SRO Examination Outline Printed 09/22/2004 Facility: R E Ginna E'S - An1 -
Plant Systems Tier 2 / Group 2 Form ES-401-2 I
3ys/Evol##I Name K1 K2 K5 K6 A1 A2 A3 A4 KA Topic Imp. Poinb
' 4 3 4 Fuel Handling Equipment X -
A2.01 Dropped fuel 4.4 1 element 2.4.4 Ability to recognize 4.3
- 1 086 Fire Protection abnormal indications for system operating parameters which are entry-level conditions for emergency and abnormal operating
-- procedures. -
WA Category Totals: 0 0 0 0 0 0 0 1 0 0 2 1
~ -- ~
Generic Knowledge and Abilities Outline (Tier 3)
PWR SRO Examination Outline Printed: 09/22/2004 Facilitv: R E Ginna Form ES-401-3
' % Generic Category KA KA ToDic Imp. Points Conduct of Operations Category Total: 2 Equipment Control 2.2.20 Knowledge of the process for managing troubleshooting activities.
2.2.23 Ability to track limiting conditions for operations. 3.8 Cateeorv Total: 2 r Radiation Control 2.3.6 2.3.9 I
Knowledge of the requirements for reviewing and approving release permits.
Knowledge of the process for performing a containment purge.
I 3.1 3.4 I
1 1
1
._._Emergency ProceduredPlan 2.4.28 Knowledge of procedures relating to emergency 3.3 1 response to sabotage.
Category Total: 1 Generic Total: 7 1
ES-401 Record of Rejected WAS Form ES-401-4 Tier 1 Randomly Reason for Rejection Group Selected WA 3 2.1.22 Replaced 2.1.22 Reason: Ability to determine Mode is an RO level KA. Replaced with 2.1.14. Replacement transferred from a second randomly generated outline, same Tier and Group.
3 2.4.33 Replaced 2.4.33 Reason: This is not an SRO level topic. Replaced with 2.4.28. Replacement transferred from a second randomly generated outline, same Tier and Group.
ES-301 Administrative Topics Outline Form ES-301-1 L-Facility: R. E. Ginna Date of Examination:ll/1/2004 Examination Level (circle one): SRO Operating Test Number:=
Administrative Topic TY Pe Describe activity to be performed (see Note) Code*
JAOOI .008Calculate SDM for an Operating Reactor Conduct of Operations Dj c with an Untrippable Rod (2.1.7)
JS341.002 Requirements for Confined Space Entry Conduct of Operations Ny C (2.1.26)
JS343.002 A52.4 Control of Limiting Conditions for I Equipment Control 1 Dvc I Operation. (2.2.23)
L- JS340.019 Implement EPlP 1-13 Local Radiation Radiation Control Nl c Emergency. (2.3.IO)
JS340.020 Event Classification. (2.4.41)
Emergency Plan N, S
- Type Codes & Criteria: (C)ontrol room (D)irect from bank (s 3 for ROs; 5 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 2 1)
(P)revious 2 exams (I; 1; randomly selected)
(S)imulator
ES-301 Control Roomlln-Plant Systems Outline Form ES-301-2 Facility: R. E. Ginna Date of Examination: 11/1/2004 Exam Level (circle one): SRO-U Operating Test No.: 04-2 Control Room Systems@(8 for RO; 7 for SRO-I; 2 or 3 for SRO-U)
System / JPM Title Type Code* Safety Function a.JR076.001 Perform Attachment No Service Water Pumps A, Nl Sl L I 4 b.JR062.026 Restore power to one train from the B D/G per ER-ELEC.3 1 c.JR026.001 Secure CNMT Spray 5 l h-In-Plant Systems@(3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)
I i.JCOO6.010 Transfer Water from the SFP to the RWST 8 during Loss of Emergency Coolant Recirculation j.JCO62.023 Dilute the BAST following a Loss of All AC 1 k.
I I
@ All control room (and in-plant) systems must be different and serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
I
- Type Codes Criteria for RO I SRO-I I SRO-U (A)lternate path 4-6 14-6 12-3 (C)ontrol room (D)irect from bank I; 911; 8 1 s 4 (E)mergency or abnormal in-plant L I I L I I L 1 (L)ow-Power > 1 1 2 112 1 (N)ew or (M)odified from bank including 1(A) >ZI22121 (P)revious 2 exams < 3 I < 3 I < 2 (randomly selected)
- (R)CA (S)imulator L 112 l l >I
Appendix D Scenario Outline Form ES-D-I Facility: R. E. Ginna Scenario No.: 1 Op-Test No.: 04-2 Examiners: Operators:
Event Malf. No. Event Event No. Type* Description 1 - N Start the Second MFW Pump 2 PZR02D I PT-449 Fails High causing full PRZR Spray (Tech. Specs.)
3 EDS04B C Bus 16 Fault (Loss of a Safeguards Bus) (Tech. Specs.)
4 cvc12A C Trip of A Charging Pump. Loss of All Charging 5 STMOSNB M Main Steamline Rupture, Both MSlVs stuck open STM03
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor I'
Appendix D Scenario Outline Form ES-D-1 Facility: R. E. Ginna Scenario No.: Backup Op-Test No.: 04-2 Examiners: Operators:
Initial Conditions:lOO% Power MOL core conditions. B RHR pump 00s due to a Seal Cooler Leak. CNMT Fan Cooler B is 00s due to a Motor Cooler SW leak.
Event Malf. No. Event Event No. Type* Description 1 PZR03B I PRZR Level transmitter LT-427 Fails low causing Letdown Isolation (Tech. Spec.)
2 CLG03 C Non-Regen Hx Tube Leak causes RCS leakage into the CCW system (Upon restoration of Letdown)
L 3 RCSIOB - RCS flow transmitter fails low (Tech. Spec.)
4 TUROSE N High Turbine Vibration requires Load reduction 5 RCS02B M RCS LOCA 1000 gpm 6 RHROIA C A RHR Pump trips resulting in a loss of Emergency Coolant Recirc.
~~ ~ ~ ~~ ~ ~~ ~
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor