SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION November 22, 2004 Mr. J. V. Parrish Chief Executive Order Energy Northwest Columbia Generating Station Snake River Warehouse North Power Plant Loop Richland, WA 99352
SUBJECT:
COLUMBIA GENERATING STATION - CORRECTION TO SAFETY EVALUATION DATED OCTOBER 28, 2004, REGARDING REVISION TO THE PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN (TAC NO. MC2905)
Dear Mr. Parrish:
By letter dated October 28, 2004, the Nuclear Regulatory Commission (NRC) issued an administrative change to the Columbia Generation Station Facility Operating License (NPF-21) to incorporate the reference to the recently-revised physical security plan, training and qualification plan, and safeguards contingency plan. Your staff identified errors in the Safety Evaluation provided in the October 28, 2004, letter.
Therefore, the NRC is issuing corrected pages 4 and 5 of the Safety Evaluation, which contain Safeguards Information. The revised Safety Evaluation pages for Columbia Generating Station are enclosed. We regret any inconvenience this may have caused.
NOTICE: The Enclosure contains Safeguards Information. Upon separation from the Enclosure, this letter is DECONTROLLED.
SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION November 22, 2004 Mr. J. V. Parrish Chief Executive Order Energy Northwest Columbia Generating Station Snake River Warehouse North Power Plant Loop Richland, WA 99352
SUBJECT:
COLUMBIA GENERATING STATION - CORRECTION TO SAFETY EVALUATION DATED OCTOBER 28, 2004, REGARDING REVISION TO THE PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN (TAC NO. MC2905)
Dear Mr. Parrish:
By letter dated October 28, 2004, the Nuclear Regulatory Commission (NRC) issued an administrative change to the Columbia Generation Station Facility Operating License (NPF-21) to incorporate the reference to the recently-revised physical security plan, training and qualification plan, and safeguards contingency plan. Your staff identified errors in the Safety Evaluation provided in the October 28, 2004, letter.
Therefore, the NRC is issuing corrected pages 4 and 5 of the Safety Evaluation, which contain Safeguards Information. The revised Safety Evaluation pages for Columbia Generating Station are enclosed. We regret any inconvenience this may have caused.
Sincerely,
/RA/
John A. Nakoski, Chief Security Plan Review Team Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-397
Enclosure:
As stated cc w/o encl: See next page cc w/encl: Mr. Steve Scammen DISTRIBUTION:
PUBLIC OGC ACRS DBaxley WMacon SPRT R/F RGramm HBerkow GHill (4)
DLPM DPR TBoyce AHowell, RIV Accession No.: ML043270515 OFFICE SPRT/PM SPRT/TL NRR/PM DLPM/LA SPRT/PL NRR/SC NAME MChernoff PPeduzzi BBenney JPeralta JNakoski DATE 11-16-04 11-15-04 11-18-04 11-18-04 11-17-04 OFFICIAL RECORD COPY NOTICE: The Enclosure contains Safeguards Information. Upon separation from the Enclosure, this letter is DECONTROLLED.
Columbia Generating Station cc:
Mr. Dale Atkinson (Mail Drop PE08)
Vice President, Technical Services Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Mr. Albert E. Mouncer (Mail Drop PE01)
Vice President, Corporate Services/
General Counsel/CFO Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, WA 98504-3172 Mr. D. W. Coleman (Mail Drop PE20)
Manager, Performance Assessment and Regulatory Programs Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Ms. Christina Perino (Mail Drop PE20)
Manager, Licensing Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Chairman Benton County Board of Commissioners P.O. Box 190 Prosser, WA 99350-0190 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 69 Richland, WA 99352-0069 Mr. Rodney L. Webring (Mail Drop PE04)
Vice President, Nuclear Generation Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Thomas C. Poindexter, Esq.
Winston & Strawn 1400 L Street, N.W.
Washington, DC 20005-3502 Mr. Bob Nichols Executive Policy Division Office of the Governor P.O. Box 43113 Olympia, WA 98504-3113 Ms. Lynn Albin Washington State Department of Health P.O. Box 7827 Olympia, WA 98504-7827