Text
Nuclear Operating Company
.k*.h F~wM~3 Pa &etZJ Nohtt? bAJJ November 11, 2004 NOC-AE-04001818 File No.: G02 10CFR50.71 STI: 31809203 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for October 2004 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for October 2004.
If you should have any questions on this matter, please contact R.L. Hill at (361) 972-7667.
F.H. Mallen General Manager, Financial Support Attachments: 1)
STPEGS Unit 1 Monthly Operating Report - October 2004
- 2)
STPEGS Unit 2 Monthly Operating Report - October 2004
cc:
(paper copy)
(electronic copy)
Bruce S. Mallett Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 Richard A. Ratliff Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Jeffrey Cruz U. S. Nuclear Regulatory Commission P.:O. Box 289, Mail Code: MN116 Wadsworth, TX 77483 A. H. Gutterman, Esquire Morgan, Lewis & Bockius LLP L. D. Blaylock City Public Service Michael K. Webb U. S. Nuclear Regulatory Commission R. L. Balcom Texas Genco, LP A. Ramirez City of Austin C. A. Johnson AEP Texas Central Company Jon C. Wood Matthews & Branscomb C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT I MONTHLY OPERATING REPORT OCTOBER 2004 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50498 LICENSE NO. NPF-76 Approved By:
G.L. PAkg 'I Date - I -
MONTHLY
SUMMARY
South Texas Project Unit 1 operated during the reporting period at full power with no unit shutdowns or significant power reductions.
OPERATING DATA REPORT DOCKET NO.
50-498 UNIT I
DATE Nov. 8 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 OPERATING STATUS
- 1.
REPORTING PERIOD: 1011/04 - 10/31/04 GROSS HOURS IN REPORTING PERIOD:745
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3 853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1.250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1.250.6
- 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
- 4.
REASONS FOR RESTRICTION (IF ANY): N/A
- 5.
NUMBER OF HOURS REACTOR CRITICAL
- 6.
REACTOR RESERVE SHUTDOWN HOURS
- 7.
HOURS GENERATOR ON LINE
- 8.
UNIT RESERVE SHUTDOWN HOURS
- 9.
GROSS THERMAL ENERGY GENERATED (MWH)
- 10.
NET ELECTRICAL ENERGY GENERATED (MWH)
- 11.
REACTOR SERVICE FACTOR (%/)
- 12.
REACTOR AVAILABILITY FACTOR (%)
- 13.
UNIT SERVICE FACTOR (%)
- 14.
UNIT AVAILABILITY FACTOR (%)
- 15.
UNIT CAPACITY FACTOR - Using MDC (%)
- 16.
UNIT CAPACITY FACTOR -Using DER (%)
- 17.
UNIT FORCED OUTAGE RATE (%)
THIS MONTH 745.0 0
745.0 0
2.883.079 952.834 100.0 100.0 100.0 100.0 102.3 102.3 0.0 YR TO DATE 7 264.9 0
7,248.8 0
28.011.584 9.258.033 99.2 99.2 99.0
' 99.0 101.1 101.1 1.0 CUMULATIVE 111.280.4 0
109 576.3 0
410.979.041 134.332.870 78.4 78.4 77.2 77.2 75.7 75.7 13.9
- 18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH):
Scheduled 30 day outage to allow scheduled refueling to begin on March 9, 2005.
- 19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-498 UNIT I
DATE Nov. 8. 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 MONTH OCTOBER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 1277 2
1272 3
1279 4
1279 5
1279 6
1278 7
1279 8
1280 9
1279 10 1280 11 1282 12 1283 13 1282 14 1281 15 1283 16 1282 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 AVERAGE DAILY POWER LEVEL (MWe-Net) 1280 1280 1280 1279 1277 1277 1278 1278 1278 1278 1278 1278 1277 1274 1279
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-498 UNIT I
DATE Nov. 8. 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 REPORT MONTH OCTOBER 1
2 3
4 5
No.
Date Type Duration Reason Method of Liccnsee System Component Cause & Corrective Action to Prevent Recurrence (Hours)
Shutting Event Code Code Down Report #
Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD I_
I I
I I
I I
II 1
F: Forced S: Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
I-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4
PORNS AND SAFETY VALVE
SUMMARY
There were no PORV or Safety Valves challenged during the reporting period.
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT OCTOBER 2004 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50499 LICENSE NO. NPF-80 Approved By:
G.
Ak
/
K Y
is//
oy G.L. PARKEY cDat6(
MONTHLY
SUMMARY
South Texas Project Unit 2 operated during the reporting period with no unit shutdowns or significant power reductions.
OPERATING DATA REPORT DOCKETNO.
UNIT DATE COMPLETED BY TELEPHONE OPERATING STATUS
- 1.
REPORTING PERIOD: 10/1/04 - 10/31/04 GROSS HOURS IN REPORTING PERIOD:
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3,853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1,250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1,250.6
- 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
- 4.
REASONS FOR RESTRICTION (IF ANY): N/A 50-499 2
Nov. 8. 2004 R.L. Hill 361-972-7667 745 THIS MONTH
- 5.
NUMBER OF HOURS REACTOR CRITICAL
- 6.
REACTOR RESERVE SHUTDOWN HOURS 745.0 0
- 7.
HOURS GENERATOR ON LINE
- 8.
UNIT RESERVE SHUTDOWN HOURS
- 9.
GROSS THERMAL ENERGY GENERATED (MWH)
- 10.
NET ELECTRICAL ENERGY GENERATED (MWH)
- 11.
REACTOR SERVICE FACTOR (as)
- 12.
REACTOR AVAILABILITY FACTOR (%)
- 13.
UNIT SERVICE FACTOR (%a)
- 14.
UNIT AVAILABILITY FACTOR (as)
- 15.
UNIT CAPACITY FACTOR - Using MDC (%)
- 16.
UNIT CAPACITY FACTOR -Using DER (%)
- 17.
UNIT FORCED OUTAGE RATE (%)
745.0 0
2.883.358 949.683 100.0 100.0 100.0 100.0 101.9 101.9 0.0 YR TO DATE 6,674.9 0
.6.657.5 25,642,953 8.425.875 91.2 91.2 90.9 90.9 92.0 92.0 0.6 CUMULATIVE 108.379.4 0
106.063.0 0
397,331.058 129.524.052 80.4 80.4 78.7 78.7 76.9 76.9 13.2
- 18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A
- 19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
AVERAGE DAILY UNIT PONVER LEVEL DOCKETNO.
50-499 UNIT 2
DATE Nov. 8, 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 MONTH OCTOBER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 1271 2
1271 3
1271 4
1270 5
1272 6
1272 7
1271 8
1272 9
1275 10 1276 11 1276 12 1278 13 1278 14 1277 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 1277 18 1277 19 1277 20 1275 21 1274 22 1274 23 1275 24 1275 25 1275 26 1275 27 1275 28 1275 29 1275 30 1276 15 16 1279 1278 31 1276
UNIT SUMTDOWNS AND POWER REDUCTIONS DOCKET NO.
50499 UNIT 2
DATE Nov. 8. 2004 COMPLETED BY R.L. Hill TELEPHONE 361-972-7667 REPORT MONTH OCTOBER 1
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)
Shutting Event Code Code Down Report#
Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD II I
I I
I I
I I
F: Forced S: Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
I-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4
PORVS AND SAFETY VALVE
SUMMARY
There were no PORV or Safety Valves challenged during the reporting period.