ML043210479
| ML043210479 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 11/14/2004 |
| From: | Dacimo F Entergy Nuclear Northeast |
| To: | Document Control Desk, NRC/FSME |
| References | |
| EA-03-039, EA-03-086, NL-04-1 40 | |
| Download: ML043210479 (2) | |
Text
Entergy Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB
~E tergy P.O. Box 249 Buchanan, NY 10511-0249 Tel 914 734 6700 Fred Dacimo Site Vice President Administration November 4, 2004 Indian Point Unit Nos. 1, 2, and 3 Docket Nos. 50-03, 50-247, and 50-286 NL-04-1 40 A
Document Control Desk U. S. Nuclear Regulatory Commission Mail Station O-P1-17 Washington, D.C. 20555-0001
SUBJECT:
Report to Commission Pursuant to Section III.C of Order EA-03-086 and Section II.C.2 of Order EA-03-039 Regarding Indian Point Units 1. 2 and 3 Security Plans
REFERENCE:
- 1. Entergy letter to NRC, NL-04-130, Resubmitted Indian Point Units 1, 2 and 3 Physical Security, Training and Qualification, and Safeguards Contingency Plan (TAC Nos. MC2929 and MC2930)" dated October 13, 2004
- 2.
NRC Letter to Entergy, Indian Point Nuclear Generating Station, Units 2 and 3 -
Administrative Change to Facility Operating License In Conjunction With the Commission Order EA-03-086 Regarding Revised Design Basis Threat (DBT); And Revisions to Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (TAC Nos. MC2929 and MC2930) dated October 28, 2004
Dear Sir:
The NRC issued three Orders to Indian Point Units 2 and 3 dated April 29, 2003: EA-02-038, 'Order for Compensatory Measures Related to Fitness-For-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel"; EA-03-039, "Order for Compensatory Measures Related to Training Enhancements on Tactical and Firearms Proficiency and Physical Fitness Applicable to Armed Nuclear Power Plant Security Force Personnel"; and EA-03-086, Order Requiring Compliance with Revised Design Basis Threat." These are collectively referred to as "Orders." In addition to other requirements, Order EA-03-086 required nuclear power plant licensees to revise their physical security, security force training and qualification, and safeguards contingency plans, to submit those plans to the NRC for approval by April 29, 2004, and to complete implementation of those plans by October 29, 2004.
In Reference 1, Entergy Nuclear Operations, Inc (Entergy) filed a Supplemental Response to Order EA 086 that contained the Physical Security Plan, the Training and Qualification Plan, and the Contingency Plan for Indian Point Units 1, 2, and 3. In Reference 2 the NRC issued a Safety Evaluation Report documenting the NRC review and acceptance of the plans for Indian Point Units 2 and 3.Section III.C. of Order EA 086 required Entergy to report to the NRC in writing when implementation of the NRC approved physical security plan, general training and qualification plan, and safeguards contingency plan to protect against the design basis threat was accomplished.Section III.C.2 of Order EA-03-39 required Entergy to report to the NRC when full compliance with the requirements in Attachment 2 to the Order was achieved.
1,gIR6sO
Docket Nos. 50-03, 50-247, and 50-286 NL-04-140 Page 2 of 2 Entergy hereby certifies that those conditions have been met and the exercise of enforcement discretion pursuant to the Orders during the trans'tion period will no longer be necessary.
This letter contains no new commitments. If you have any questions or require additional information, please contact Mr. Patric W. Conroy, Manager, Licensing at (914) 734-6668.
I declare under penalty of perjury that the foregoing is true and correct. Executed on November 4, 2004.
Sin ey, F R. Dacimo Site Vice President Indian Point Energy Center cc:
Mr. Samuel J. Collins Regional Administrator-Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406-1415 Mr. Patrick D. Milano, Sr. Project Manager Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, D.C. 20555-0001 Mr. Michael K. Webb, Project Manager Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-7-D1 Washington, D.C. 20555-0001 Resident Inspectors' Office U.S. Nuclear Regulatory Commission Indian Point Unit 3 P.O. Box 337 Buchanan, NY 10511-0337 Mr. Robert J. Fretz Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 8-B2 Washington, D.C. 20555-0001 Resident Inspectors' Office' U.S. Nuclear Regulatory Commission Indian Point Unit 2 P.O. Box 59 Buchanan, NY 10511-0059